Text
r
i
4
0
OCT 161981
gpuqs
NOVO ,1 IO81h
Duke Power Company
- -
-
ATTN:
Mr. W. O. Parker, Jr.
i __
Yice President, Steam Production
\\y v.s, kg ')' l
F. O. Box 2178
g
/
Charlotte, NC 28242
/Ni{
. p~
gf
Gentlemen:
'
Subject: Report No. 50-370/81-17
This refers to the routine safety inspection conducted by Mr. N. Economos of this
office on September 15-18, 1981, of activities authorized by NRC Construction
Permit No. CPPR-84 for the McGuire facility and to the discussion of our findings
held with Mr. J. T. Moore, Assistant Project Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection onsisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed inspec-
tion report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office
by telephone within ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such infor-
mation.
If your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this office promptly so
that a new due date may be established.
Consistent with section 2.790(b)(1),
such application must be accompar.ied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimad that .r e
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
.
rEI
$
,
,
Duke Power Company
2
OCT 101981
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit. If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
s/
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosures:
Inspection Report No. 50-370/81-17
cc w/ encl:
M. D. McIntosh, Plant Manager
J. Y. Moore, Project Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of North Carolina
";
R
RI
RII
RII
RII
,
i t.o
os:ht
le at
CEMurp y
AFGibson
Adjehre
PJV211ogg
/g g /81
10//f/81
10g/81
10/z5/81
10
81
10// '81