Forwards IE Insp Repts 50-508/81-14 & 50-509/81-14 on 810810-16 & Notice of Violation
ML20032B239
Person / Time
Site: Satsop
Issue date: 10/21/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17150A160 List:
References
NUDOCS 8111050332
Download: ML20032B239 (2)


See also: IR 05000508/1981014

Text

1

%

%g9mr.

3

y.

w

w

3

.

,._

v

w

.

OCT 21 1981

e

Docket Nos. 50-508, 50-509

f

..

M'

.

~

fj"Afd)M'

pr 1

s

6

%

'

.

'A

Washington Public Power Supply System

-

E NOVO 41981

91

P. O. Box 1223

Elma, Washington 98541

6. s. - - , w.,

/

-

cOmmen

y'

Attention: Mr. R. S. Leddick

Program Director, WNP-3/5

\\

s'

M1T4

Gentlemen:

Subject: NRC Inspection at Washington Nuclear Project Nos. 3 and 5 (WNP-3/5)

This refers to the inspection conducted by Messrs. D. P. Haist, G. Hernandez,

and J. O. Elin of this office on August 10-16,1981 of activities authorized

by NRC Construction Pemit Nos. CPPR-154 and 155, and to the discussion of

our findings held with you and other members of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the inclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements, as

set forth in the Notice of Violation, enclosed herewith as Appendix A.

The potential for noncompliance in this area was brought to your attention

at the start of work activities as documented in IE Report Hos. 50-508/509/81-09

and 81-12. Please include in your response to the Notice of Violation a

/

i

discussion of the reasons for your failure to adequately investigate and

effect corrective actions to preclude this item of noncompliance.

j

-[EPl

1

) I

.

8111050332 811021

PDR ADOCK 05000508

G

PDR

->

...?/J.k

..4,.M......

D0DDS,#

....

........

...... ......... .

~~~> . ..H.A.i S.7g. ,,a.ERNA,NDEZ ,,, ,,,, EL I N,

,

,,,

r,,,,,,,

,,,,,,,,,,,,,,,,,,,,

,,,,,,,,, ,,,,,,,,,,

,,,,,,,,,,,,,,,,,, ,

,

..

,,

. . . . . . . . ././ / 81

. . . . . . /./.d / 81

10/

10

. . . . /. /. .p/.81

. . . . .K. . . ./. 81

10

10

em>

. . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . .

.........

................. ..

.. .........

...........

......

, . - _ - . .- . F. .F.. I C I A L R E C_ _O_ ,R. D_ _.C. O P.Y

.- , .".. ,, "esm e24

'

O

-

- , - . _ , -

-_

NRC FORM 318 ttOr80l NRCM O240

4

-

..

-

.

Q

.

'

Washington Public Power Supply System

-2-

OCT 211981

t

In accordance with 10 CFR 2.790 of the Ccmmission's regulations, a copy

of this letter and the enclosed inspection (or investigation) report

will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractors) believe'to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify

this office by telephone within ten (10) days from the date of this

letter of your intention to file a request for withholding; cnd (b) submit

within 25 days from the date of this letter a written application to

this office to withhold such information.

If your receipt of this

letter has been delayed such that less than seven (7) days are available

-

for your review, please notify this ' office promptly so that a new due

date r'ay be established. Consistent with section 2.790(b)(1), any such

application must be accompanied by an affidavit executed by the owner of

the infomation which identifies the document or part sought to be

withheld, and which contains a full statement of the basis on which it

is claimed that the infomation should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4).

The infomation sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, the report will be placed in the

Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss then with you.

Sincerely,

7 Bisbr b

B. H. Faulkenberry, Chief

l

Reactor Construction Projects Branch

Enclosures:

A.

Notice of Violation

B.

IE Inspection Report

l

No. 50-508/81-14

l

50-509/81-14

cc w/o enclosure B:

R. L. Ferguson, Managing Director, WPPSS

R. Glasscock, Quality Assurance Director, WPPSS

bbc: DMB/ Document Control Desk'(RIDS)

Distributed by RV:

State of WA (Lewis), Engelken (ltr), Residentor (3)

l

!

<

.-

_ - . _