Docket No. 50-440
!p
Docket No. 50-441
08198I".y)!
'
^
Th
eland Electric Illuminating
ATTN: Dalwyn R. Davidson
(,
-N
Vice President - System
'
/ h [T( .
ml
Engineering and Construction
Post Office Box 5000
Cleveland, OH 44101
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. R. Gardner
and R. Mendez of this office on September 29 - October 2, 1981, of activities
at Perry Nuclear Power Plant, Units 1 and 2, authorized by NRC Construction
Permit No. CPPR-148 and No. CPPR-149 and to the discussion of our findings
with Mr. M. R. Edelman at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in enclosed Appendix A.
A written response, submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter, the enclosures, and your response to this letter will be
placed in the NRC's Public Document Room.
If the enclosures contain any
information that you or your contractors believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this
office by telephone within seven (7) days from the date of this letter of
your intention to file a request for withholding; and (b) submit within
twenty-five (25) days from the date of this letter a written application
5 GO I
3
)I
8111040345 811023
"
DR ADOCK 05000440
-
-
- - - -
-
-
-
e
,
i
OCT 2.31981
The Cleveland Electric 111uminiating - 2 -
Company
.to this office to withhold such information. Sc.ction 2.790(b)(1) requires
that any such application must be accompanied by an affidavit executed by -
the owner of the.information which identifies the document or part sought
to be withheld, and which contains a full statement of the reasons which
are the bases for-the claim that the information should be withheld from
public disclosure. This section further requires the statement.to address
with specificity the considerations listed.in 10 CFR 2.790(b)(4)~. The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, a copy. of this letter,
the enclosures, and your response to this letter will be placed in the
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
ifiriginal sig,cd by C.E NbN
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Report
No. 50-440/81-14 and'
No. 50-441/81-14
cc w/encls:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
I
Harold W. Kohn, Power
Siting Commission
Daniel D. Wilt, Attorney
,
Helen W. Evans, State of Ohio
i
I
!
i
i
/ f Iq13
/I?
FII
rig
RII
RIII~
g
yc.
fjp
G'attiner/jp
Hawkins
Stteeter
. Wi 11ams
NYreg,,
(c[
10/20/81
l0 f ,,
jfy
. .
- .
- - -
.
. ~ .
.
. . .