Forwards IE Insp Rept 50-344/81-24 on 810817-26.No Noncompliance Noted
ML20032A869
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 10/06/1981
From: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20032A870 List:
References
NUDOCS 8111020489
Download: ML20032A869 (2)


See also: IR 05000344/1981024

Text

.

. _ _ _ _ _

-

_ _

3

y

g

,

g

y

.

5.-

..

October 6, 1981

>

"h

Docket No. 50-344

g

3

{. % 'Pg8

Portland General Electric Coapany

/

121 S. W. Salmon Street

k gA L}

---

,

l

Portland, Oregon 97204

l

Attention: Mr. Bart D. Withers

%

Vice President Nuclear

Q/

f

Gentlemen:

Subject:

NRC Inspection of the Trojan Nuclear Plant

This refers to the inspection conducted by Mr. D. J. Willett of this

office on August 17-26, 1981, of activitics authorized by NRC License

No. NPF-1, and to the discussion of our findings held by Mr. Willett

with Mr. Yundt and other members of year staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the enclosed

inspection repor t.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, in-

terviews with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) L11 eve to be exempt from disclosure

under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office

by telephone within ten (10) days from the date of this letter of your

intention to file a request for withholding; and (b) submit within

25 days from the date of this letter a written application to this

office to withhold such information.

If your receipt of this letter has

been delayed such that less than seven (7) days are available for your

review, please notify this office promptly so that a new due date may be

established. Consistent with section 2.790(b)(1), any such application

must be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the basis on which it is claimed that the

8111020%[y '

I

g

%;{,

" 'fI

RV,hl.~),

,, ,,, ,,,,,,

" * ' >

I

.

SURNAME)

WILLETT/mn

ZWET' ZIG

STERhNBERG

'

"

"

,

om)

10/5/81. ".. . . . , . . . . . " " . .

iO)h...[81

,

,

,

lb[ /Ni

'

'

"'

'

..

..

,,

,,,,

,,

,

,

NRC FORM 318 00 801 NRCM C240

OFFICIA(RECOFsD COW

s usoeo i9eo-a:9 e2.

___ -

.--

-

-

s

5

_

.

.

Portland General Electric Company

-2-

October 6, 1981

information should be withheld from public disclosure. This section

further requires the statement to address with specificity the considerations

listed in 10 CFR 2.790(b)(4).

The information sought to.be withheld

-

shall be incorporated as far as possible into a' separate part of the

-

affidavit.

If we do not hear from you in this regard within the specified

l-

periods noted above, the report will be placed in the Public Document

_

Room.

4

Should you have any questions concerning this inspection, we will be

.

glad to discuss then with you.

-

a

Sincerely,-

-

Original signed by

D. M, Sternberg

_

,

=

D. M. Sternberg, Chief

Reactor Operations and fluclear

l_

Support Branch

-

Enclosure:

.

IE Inspection Report

--

l

No. 50-344/81-24

-

cc w/o enclosure:

s

C. P. Yundt

-

J. W. Durham, Esq., Senior Vice

"

President and Corporate Counsel

_

_

bcc:

DMB/ Document Control Desk (RIDS)

--

.

Distributed by RV:

I

_

-

Engelken (ltr)

-m

Resident Inspector

State of Oregon (Godard)

=

-

-

_

E

--

1

-