ML20032A869
| ML20032A869 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 10/06/1981 |
| From: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B PORTLAND GENERAL ELECTRIC CO. |
| Shared Package | |
| ML20032A870 | List: |
| References | |
| NUDOCS 8111020489 | |
| Download: ML20032A869 (2) | |
See also: IR 05000344/1981024
Text
.
. _ _ _ _ _
-
_ _
3
y
g
,
g
y
.
5.-
..
October 6, 1981
>
"h
Docket No. 50-344
g
3
{. % 'Pg8
Portland General Electric Coapany
/
121 S. W. Salmon Street
k gA L}
---
,
l
Portland, Oregon 97204
l
Attention: Mr. Bart D. Withers
%
Vice President Nuclear
Q/
f
Gentlemen:
Subject:
NRC Inspection of the Trojan Nuclear Plant
This refers to the inspection conducted by Mr. D. J. Willett of this
office on August 17-26, 1981, of activitics authorized by NRC License
No. NPF-1, and to the discussion of our findings held by Mr. Willett
with Mr. Yundt and other members of year staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the enclosed
inspection repor t.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, in-
terviews with personnel, and observations by the inspector.
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) L11 eve to be exempt from disclosure
under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office
by telephone within ten (10) days from the date of this letter of your
intention to file a request for withholding; and (b) submit within
25 days from the date of this letter a written application to this
office to withhold such information.
If your receipt of this letter has
been delayed such that less than seven (7) days are available for your
review, please notify this office promptly so that a new due date may be
established. Consistent with section 2.790(b)(1), any such application
must be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the basis on which it is claimed that the
8111020%[y '
I
g
%;{,
" 'fI
RV,hl.~),
,, ,,, ,,,,,,
" * ' >
I
.
SURNAME)
WILLETT/mn
ZWET' ZIG
STERhNBERG
'
"
"
,
om)
10/5/81. ".. . . . , . . . . . " " . .
iO)h...[81
,
,
,
lb[ /Ni
'
'
"'
'
..
..
,,
,,,,
,,
,
,
NRC FORM 318 00 801 NRCM C240
OFFICIA(RECOFsD COW
s usoeo i9eo-a:9 e2.
___ -
.--
-
-
s
5
_
.
.
Portland General Electric Company
-2-
October 6, 1981
information should be withheld from public disclosure. This section
further requires the statement to address with specificity the considerations
listed in 10 CFR 2.790(b)(4).
The information sought to.be withheld
- -
shall be incorporated as far as possible into a' separate part of the
-
If we do not hear from you in this regard within the specified
l-
periods noted above, the report will be placed in the Public Document
_
Room.
4
Should you have any questions concerning this inspection, we will be
.
glad to discuss then with you.
-
a
Sincerely,-
-
Original signed by
D. M, Sternberg
_
,
=
D. M. Sternberg, Chief
Reactor Operations and fluclear
l_
Support Branch
-
Enclosure:
.
IE Inspection Report
--
l
No. 50-344/81-24
-
cc w/o enclosure:
s
C. P. Yundt
-
J. W. Durham, Esq., Senior Vice
"
President and Corporate Counsel
_
_
bcc:
DMB/ Document Control Desk (RIDS)
--
.
Distributed by RV:
I
_
-
Engelken (ltr)
-m
Resident Inspector
State of Oregon (Godard)
=
-
-
_
E
--
1
-