ML20032A816
| ML20032A816 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/21/1981 |
| From: | PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | |
| Shared Package | |
| ML20032A815 | List: |
| References | |
| NUDOCS 8111020437 | |
| Download: ML20032A816 (2) | |
Text
-
L'(
Table III.E.1. (i)
)
Type "B" Test Sunmary PEN'T SYSTEM OR PENETRATION TEST TEST PEN'T NO.
NAME REMARKS DATE TOTAL TOTAL 220 Electrical 1-22-74 0
9-25-75 0
10-20-76 10 101A Electrical 1-22-74 0
9-14-75 0
10-19-76 10 10 1018 Electrical 1-22-74 0
9-14-75 0
10-19-76 10 l
[
101F Electrical 1-22-74 0
9-1 475 0
I 10-19-76 10 10 231A Eiectrical 2-07-74 175 r'
4-15-74 0
9-1 475 0
l 10-19-76 10 t
231B Electrical 2-04-74 325 4-15-74 0
9-1 475 0
l 10-19-76 10 104G Electrical 1-21-74 0
7 9-26-75 0
i 10-20-76 10 j
4 10 2008 Torus Manway 1-22-74 0-(
7-11-74 0
12-10-74 0
1-31-76 0
5-28-76 0
7-13-76 0
4 01-77 10 10 Revised 10/2/81 N111020 kIg; 90
Table III.E.2. (a)
Type "C" Test Summary PEN'T SYSTEM OR PENETRATION TEST TEST PEN'T NO.
NAME REMARKS DATE TOTAL TOTAL 7A MSIV 80A 12-01-73 326 12-29-76 off Scale Lapped Valve 12-14-77 120 MSIV 86A 1-02-74 2173 12-29-76 1560 1560 7B MSIV 800 12-01-73 0
12-26-76 282 l
f MSIV 86B 12-01-73 978 12-26-76 4850 4850 7c MSIV 80c 1-03-74 848 12-26-76 Off Scale Lapped Valve 2-14-77 85 MSIV 86C 4-06-74 316 12-26-76 1240 1240 70 MSIV 800 1-19-74 913 12-26-76 Off Scale Lapped Valve 2-14-77 100 MSIV 860 1-19-74 283 12-29-76 1520 1528 8
MSL Drain 2-06-74 115 M0 2-74 2-01-75 0
M0 2-77 12-29-74 235 235 9A Feedwater 1-31-7!+
200 1-29-75 380 1-30-76 381 1-18-77 556 556 98 Feedwater 1-21-74 1200 1-30-76 0
i 1-08-77 Off Scal'e 1-21-77
-Off Scale Lapped 28B & 968 2-03-77 4200 4200 Rev. 10/2/81 91
.