Forwards Revised Pages 90 & 91 of Reactor Containment Bldg Integrated Leak Rate Test Rept,
ML20032A814
Person / Time
Site: Peach Bottom  
Issue date: 10/21/1981
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20032A815 List:
References
NUDOCS 8111020436
Download: ML20032A814 (2)


Text

.

PHILADELPHIA ELECTRIC COMPANY 23O1 MARKET STREET P.O. BOX 8699 1881 -1981 PHILADELPHI A PA.19101 (2151841 4000 October 21, 1981 j

l Director Q

j Office of Nuclear Reactor Regulations 0CT 3 0198W ~3l U.S. Nuclear Regulatory Commission Washington, DC 20555 Ej y,3,gggig g

  • Jg

/

,mi

/'

/

Dear Director:

Enclosed are revisions to pages 90 and 91 of the Reactor Containment Building Integrated Leak Rate Test Report, dated April 4, 1977.

The revisions, indicated by a vertical bar in the margin, are as follows:

1)

Page 90 - the September 14, 1975 test data for penetrations N231 A & B was not included in the report.

2)

Page $1 - the test on MSIV 80B was incorrectly reported as taking place on December 29, 1976.

The correct data should be December 26, 1976 with 282 SCCM leakage.

9 Od "W$

gi 811

i r

Page 2 These page changes are being submitted to closeout an open item.

Very truly yours, L

W. M.

Alden Engineer-in-Charge Nuclear Section Generation Division cc:

Mr. R. C. Haynes, Director Region I Office of Inspection.and Enforcement U.S. Nuclear Regulatory Commission 631 Park Avenue i

King of Prussia, PA 19406 Mr. Norman Haller Office of Management and Program Analysis U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr.

K. Cowgill Resident Inspector i.

. _..