PHILADELPHIA ELECTRIC COMPANY 23O1 MARKET STREET P.O. BOX 8699 1881 -1981 PHILADELPHI A PA.19101 (2151841 4000 October 21, 1981 j
l Director Q
j Office of Nuclear Reactor Regulations 0CT 3 0198W ~3l U.S. Nuclear Regulatory Commission Washington, DC 20555 Ej y,3,gggig g
- Jg
/
,mi
/'
/
Dear Director:
Enclosed are revisions to pages 90 and 91 of the Reactor Containment Building Integrated Leak Rate Test Report, dated April 4, 1977.
The revisions, indicated by a vertical bar in the margin, are as follows:
1)
Page 90 - the September 14, 1975 test data for penetrations N231 A & B was not included in the report.
2)
Page $1 - the test on MSIV 80B was incorrectly reported as taking place on December 29, 1976.
The correct data should be December 26, 1976 with 282 SCCM leakage.
9 Od "W$
gi 811
i r
Page 2 These page changes are being submitted to closeout an open item.
Very truly yours, L
W. M.
Alden Engineer-in-Charge Nuclear Section Generation Division cc:
Mr. R. C. Haynes, Director Region I Office of Inspection.and Enforcement U.S. Nuclear Regulatory Commission 631 Park Avenue i
King of Prussia, PA 19406 Mr. Norman Haller Office of Management and Program Analysis U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr.
K. Cowgill Resident Inspector i.
. _..