Final Deficiency Rept Re Incorrect Analysis Used for Design of Containment Spray Sys Pipe Supports within Containment, Initially Reported 810918.Supports Reviewed.Two Anchors & Spring Supports Require Structural Mod
ML20032A521
Person / Time
Site: Diablo Canyon  
Issue date: 10/19/1981
From: Crane P, Crone P
PACIFIC GAS & ELECTRIC CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8110300290
Download: ML20032A521 (2)


Text

o,p*

Dock'et Nos. 50-277/323 f -..

.r 50 55(e) Report PAC I P'I C GAS AND E IaE C T R,I C C O M PANY 77 BE ALE STREET, SIST FLOOR, S AN FRANCISCO,3 ALIFORNI A 94106 P. O. BOX 744 2 pg T E LE PH O N E (415) 781 4 211 T E L E C O PI E R (415) 5 4 3-7813 ROBERY OHLB ACH

    • 3.jy*j,, a,*;aes.

E neago J., me w

4.

y *f.f..*,{s*.{.8,*gg*,

,8j ;*"*,*,',,,.De ass.,4 vtCE Pptst;E%T A40 GEMEP AL ATTO#NEY n......n.....a..

C H A RLES T. VAN O E US E N

f.'*[,*g,"'((:.** '
  • $ *,1*d.'.%"[t',..,

PHILIP A. CR AN E, dR,

$ N.Io.fg$$*d.

j o. ' [ r "."** *'""

ho".N,E UIs'I v Iv'o"eY.".'w E.*

HEN PY J. LaPL ANTE

- e U [n.wam E [ vom

  • "[*'"^^""

JOHN 8.G1BSON A RTHV R L. MILL M A N. d R.

CH A R L E $ W. TH1SS E LL

$'g;II,""l**l["

'[,',"7,*,#f,*(([,",'

DAN 1E L E. O185O N It'.".:$7:Ik**

E*."."^.$",7lN'"

,=::':=:~
a':::.:.

a Ae H e. PA uu9 N, s.

%..."..!.:M.. h..~..

W:

      • c"."'."c".'

?.E!.:.?F=."..

,.... ~..

?:::::r,n::~-~
a::-~~~
~.~.=: =,

" ' ' * * ~ ' "

October ~ 19, 1981 cs g-c2 Mr. R. H. Engelken, Director

.n Q

g Office of Inspection and Enforcemerit po g

Sh Region V OCTg g ygON,

y o

U. S. Nuclear Regulatory Commission

.c o

1450 Maria Lane, Suite 210 y',Y$hin.u 7 q"

Walnut Creek, CA 94596 t

.@/

9 vp en M N, Re: Docket 50-275 Docket 50-323 Diablo Canyon Units 1 and 2

Dear Mr. Engelken:

On September 18, 1981, Mr. John Burdoin was notified by tele-phone of a deficiency reportable under 10 CFR 50.55(e). The report addressed recently discovered deficiencies in the design of the contain-ment spray system pipe supports located within containment.

The following deficiencies were identified:

1.

An incorrect thermal analysis was used for hanger Mads.

2.

This analysis was performed with one snubber modeled as a rigid member.

3.

The variable spring settings for the pipe sy, ports were improperly set based on a deadload analysis which assumed, incorrectly, that the pipes contained water.

g6N I

4.

In designing a pipe anchor, the loads from only one side were used.

/ 6 8110300290 811019' PDR ADOCK 05000275 S

PDR

_o n.

c:

i Mr.-R.-:H.-Engelken October,19, 1981-New analyses were performed. addressing all of the above items.

. All supports were reviewed,-qualified, or~ redesigned:as' dictated by.the corrected support loads. As;a result, two anchors require structursi-modification and the spring supports'for those two anchors require minor l changes. These changes will be' completed prior to power: ascension.

We reported these deficiencies on.the assumption 1that an impact' on' safety existed. -Since the design has been modified, we deemed it unnecessary to make the extensive reanalysis required to_ determine if tie systems-would have remained operational had these deficiencies-remainedLundetected.

This is'the final report on the subject.

I N

Very.truly yours,

!s e

I cc: Director 1

Office of-Inspection and Enforcement

(

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Service List i