o,p*
Dock'et Nos. 50-277/323 f -..
.r 50 55(e) Report PAC I P'I C GAS AND E IaE C T R,I C C O M PANY 77 BE ALE STREET, SIST FLOOR, S AN FRANCISCO,3 ALIFORNI A 94106 P. O. BOX 744 2 pg T E LE PH O N E (415) 781 4 211 T E L E C O PI E R (415) 5 4 3-7813 ROBERY OHLB ACH
- 3.jy*j,, a,*;aes.
E neago J., me w
4.
y *f.f..*,{s*.{.8,*gg*,
,8j ;*"*,*,',,,.De ass.,4 vtCE Pptst;E%T A40 GEMEP AL ATTO#NEY n......n.....a..
C H A RLES T. VAN O E US E N
- f.'*[,*g,"'((:.** '
- $ *,1*d.'.%"[t',..,
PHILIP A. CR AN E, dR,
$ N.Io.fg$$*d.
j o. ' [ r "."** *'""
ho".N,E UIs'I v Iv'o"eY.".'w E.*
HEN PY J. LaPL ANTE
- e U [n.wam E [ vom
- "[*'"^^""
JOHN 8.G1BSON A RTHV R L. MILL M A N. d R.
$'g;II,""l**l["
'[,',"7,*,#f,*(([,",'
DAN 1E L E. O185O N It'.".:$7:Ik**
E*."."^.$",7lN'"
- ,=::':=:~
- a':::.:.
a Ae H e. PA uu9 N, s.
%..."..!.:M.. h..~..
W:
- c"."'."c".'
?.E!.:.?F=."..
,.... ~..
- ?:::::r,n::~-~
- a::-~~~
- ~.~.=: =,
" ' ' * * ~ ' "
October ~ 19, 1981 cs g-c2 Mr. R. H. Engelken, Director
.n Q
g Office of Inspection and Enforcemerit po g
Sh Region V OCTg g ygON,
y o
U. S. Nuclear Regulatory Commission
.c o
1450 Maria Lane, Suite 210 y',Y$hin.u 7 q"
Walnut Creek, CA 94596 t
.@/
9 vp en M N, Re: Docket 50-275 Docket 50-323 Diablo Canyon Units 1 and 2
Dear Mr. Engelken:
On September 18, 1981, Mr. John Burdoin was notified by tele-phone of a deficiency reportable under 10 CFR 50.55(e). The report addressed recently discovered deficiencies in the design of the contain-ment spray system pipe supports located within containment.
The following deficiencies were identified:
1.
An incorrect thermal analysis was used for hanger Mads.
2.
This analysis was performed with one snubber modeled as a rigid member.
3.
The variable spring settings for the pipe sy, ports were improperly set based on a deadload analysis which assumed, incorrectly, that the pipes contained water.
g6N I
4.
In designing a pipe anchor, the loads from only one side were used.
/ 6 8110300290 811019' PDR ADOCK 05000275 S
_o n.
c:
i Mr.-R.-:H.-Engelken October,19, 1981-New analyses were performed. addressing all of the above items.
. All supports were reviewed,-qualified, or~ redesigned:as' dictated by.the corrected support loads. As;a result, two anchors require structursi-modification and the spring supports'for those two anchors require minor l changes. These changes will be' completed prior to power: ascension.
We reported these deficiencies on.the assumption 1that an impact' on' safety existed. -Since the design has been modified, we deemed it unnecessary to make the extensive reanalysis required to_ determine if tie systems-would have remained operational had these deficiencies-remainedLundetected.
This is'the final report on the subject.
I N
Very.truly yours,
!s e
I cc: Director 1
Office of-Inspection and Enforcement
(
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Service List i