ML20031H529

From kanterella
Jump to navigation Jump to search
Forwards 811015 Fr Notice & 810903 Order of Withdrawal of CP Applications & Revocation of LWAs
ML20031H529
Person / Time
Site: Davis Besse  Cleveland Electric icon.png
Issue date: 10/15/1981
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20031H530 List:
References
ALAB-652, NUDOCS 8110280067
Download: ML20031H529 (2)


Text

..

)

o I

  • D

" DISTRIBUTION:*w/inconting Dock t Files RMattson PDR*

TMurley

~'

LPDR*

RVollrer NSIC BSnyder LB#1 Rdg.*

EAdensam EHughes (DL#74)

S (NRR-81-488)

OCT 151981 TBarnhart, Authority Files gl' f g Docket t!os.:

50-500 DEisenhut 3, '

and 50-501 RTedesco

@f3 JYoungblood C

~

g

) h/ 0 MRushbrook*

Mr. Richard P. Crouse MRothschild, ELD J

Vice President, !!nclear OELD 5

$g y

Q e-l The Toledo Edison Comp 3ny 0IE (3)

\\,'

/'

Edison Plaza MPA 4,.

a 100 Madison Avente RDiggs, ADM

/

L HDenton/ECase MbOV Tnledo, Ohio 43552 PPAS (HThompson) har Mr. Crouse:

SHanauer

Subject:

Revocation of Limited Work Authorizations and Withdra'ral of Apolication for Construction Pemits for the Davis-Besse

%cicar Power St-tign, Units 2 and 3

/

/

S letters datdd Decenber 13, 1975 and Septenher 13,197R, two limited work authorizations (LWA-1 and LWA-2) were issued pursuant to 10 CFR 55 50.10(e)(1) and E0.10(e)(3), to the Toledo Edison Conpany, et al., for certain activities tc be Nndertaken at the site of the proposed DavTsTesse !!uclear Power Station, Uiit: ? and 3.

An Augun ?R,1931, the Atomic Safety and Licensing Board issued an order in which it oranted the request of the Toledo Edison Company, et al. (1) to withdraw tne application for construction pernits for the Davis-Ese t!uclear Powe Station, Units 2 and 3 and (2) to terminate the construction pernit preceeding. The Licensing Board also vacated the two partial initial decisions which had paved the way for issuance of the two linited work authorizations.

In addition, the Licensing Board Order requires that the Toledo Edison Company, et al., undertake the acticas it has proposed to redress the site as conditions p_ursuant to 10 CFR 5 2.107(a) of the withdrawal of th9 application for construction permits. The Licensing Board Drder also author 42ed the Director, Of fice of the Nuclear Reactor Regulation to revoke the two LUAs and to cause to be published in the Federa' Reqister in accordance with in CFR 5 2. "

) a notice of the ui*.horawal of the application for construction vernits for Davis-tesse Nuclear Power Station, Units ' cnd 3.

This letter constitutes revocation of LWA-1 granted i

l(

Decenber 31, 1975 and LWA-2 qranted September 13, 1978.

T 8110280067 811015 PDR ADOCK 05000500 A

PDR omcc)

SuMZE )

DATE )

.1 NRC f0RM 3t$ pHC) N9CM T4a OFFICIAL RECORD COPY uwu e-mm

r

~

e Mr. Richard P. Crouse i A copy of a notice of withdrawal of the construction permit applicaticn and the Licensing Board's Order are enclosec.

Sincerely, Orlynal Sbed by H. R. Dentos liarold R. Denton, Director Office of Nuclear Reactor Regulation Eaclosures:

As stated 1

(O (

A, Ih A X __

M#

...... $.L l [f...'..DL :D). /

NRR l R

DL' DL:

0 ELD.\\'

'DL omc=>

con. Th.

DEff.......

HR on 1o717:i r :- ""107c781"j.

...........h..........ddtsRL esco qBJ t*

==>

j k/.l MRu

10. 7; yar".'."..........

"iwyal"r" ToxN" n1"";"

mra 8 <

.... L f.........

omy OFFIClAL RECORD COPY uso m m i.- m NRC FORM 313 (10 00) NRCM 0240

DISTRIBUTION: *w/ incoming Docket Fileo RVollmer PDR*

BSnyder LPDR*

EAdensam flSIC SCavanaugh(NRR LB#1 Rdg.*

488)

EHughes(DL#74)

LBerry TBarnhart, Authorit" Files DElsenhut RTedesco Docket Hos.:

50-500 JYoungblood and 50-501 MRushborok*

MRothschild, ELD OELD Mr. P.ichard D, Crouse 01E (3)

Vice President, fluclear MPA The Toledo Edison Conpany RDiggs, ADM Edison Plata HDenton/ECase 300 fladison Avenue PPAS (H. Thnmeson)

Toledo, Ohio 43652 SHanauer RMa ttson

Dear f!r. Crouse:

TMurley

/ Subj ect: Revecation of Limited Work Authorizationsand Withdrawal of Anplication for Construction Pemits for the Davis-Besse Nuclear Power Station, Units 2 and 3 By letters dated December 13, 1975 and Septe-ber ic, 1978, two linited wo:k authorizations (LUA-1 and LUA-2) were issued pursuant to 10 CFR 55 50.10(e)(1) and 50.10(e)(3), to the Toledo Edison Company, et al., for certain activities to he undertaken at the site of the proposed Da' ifs Tiesse !!uclear Power Station,

~

Units 2 and 3.

On August 28, 1981, the Atomic Safety and Licensing Board issued an order in which it granted the request of the Toledo Edison Compaay, et al. (1) to with>1 raw the application for construction permits for the Davis-Ese Huclear Power Station, Units 2 and 3 and (2) to teminate the construction pemit proceeding. The Licensing Board also vacated the two partial initial decisions which hui paved the way for issuance of the two linited work cuthorizations.

In addition, the Lic nsing Board Order requires that the

/ Toledo Edison company, et al., under f3e actions it has proposed to redress the site as conditions pursuant to 10 CFR 5 2.107(a) of tbc withdrawal of the application for construction pernits. The Licensing Board Order also authorized the Director, Office of the fluclear Reactor Regulation to revoke the two LuAs and to cause to be published in the Federal Reaf ster in

/accordance with 10 CFR 4 2.107(c) a notice of the withdrawal of the application for construction permits for Davis-acsse fluclear Power Station, Units 2 and 3.

This letter constitutes revocation of LWA-1 granted December 31, 1975 and LUA-2 granted September 13, 1978.

omce>

su.:mur )

our>

OFFICIAL RECORD COPY u:c m m w33 m Nnc ronu ais oow nncu oaa

~