Text
r
o
c-
.
,
.
OCT i 41981
-
,
Docket No. 50-346
O
g
Toledo Edison Company
P(Nh
ATTN:
Mr. Richard P. Crouse
6;JL,i
U
u'- f
Vice President
-
Nuclear
g:
OCT2 61981* p
-
Edison Plaza
u.s.tmus W y
300 Madison Avenue-
7"p
Toledo, OH 43652
%
(
'
4
'
Gentlemen:
F3
This refers to the routine safety inspection conducted by Mr. D. L. Robinson
of this office on September 21-22, 1981, of activities at the Davis-Besse
-
Nuclear Power Station, Unit 1, authorized by NRC Operating License No. NPI-3
<
and to the discussion of our findings with Mr. S. Quennoz at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
'
it is necessary that you (a) notify this office by telephone within seven (7)
4
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
J
this letter a written application to this office to withhold such infor-
mation. Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons which are the bases for the claim that the
information should be withheld from public disclosure. This section further
i
f#
'
si t
EEA E83 ass 8sh
i-----vw
e--*
Twi
w'
'-
eg ve
w
-m
ye w
Fyww
y y
--pwfT-
w
y
-y-
e4 f 4$e+t
7
4
W"--'9-vi*w*'"18"w+ge,e,m--y**1
---w--
-reygy-
-
f--9'--es,e
,wm-y-9-*-
g-
-
~
-
,
Toledo Edison Company
-2-
OCT 4 4 1981
i
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-
porated as far as possible into a separate part of the affidavit.
If we do
not hear from you in this regard within the specified periods noted above, a
copy of this letter and the enclosed inspection report will be placed in the
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
"Originst Signed by C.E. !brelin "
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
Enclosure:
IE Inspection
Report No. 50-346/81-17
cc w/ enc 1:
T. D. Murray, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Harold W. Kohn, Power
Siting Commission
Helen W. Evans, State of Ohio
N*
R1
yA (p
$
R111
R111
RI 1
hp
-gif
qg5
R bu 'on/so
JagldN
Streeter
W liams
No elius
10/2/81
~
l0/C
(C
/