Forwards IE Insp Rept 50-346/81-17 on 810921-22.No Noncompliance Noted
ML20031H425
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/14/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20031H426 List:
References
NUDOCS 8110270470
Download: ML20031H425 (2)


See also: IR 05000346/1981017

Text

r

o

c-

.

,

.

OCT i 41981

-

,

Docket No. 50-346

O

g

Toledo Edison Company

P(Nh

ATTN:

Mr. Richard P. Crouse

6;JL,i

U

u'- f

Vice President

-

Nuclear

g:

OCT2 61981* p

-

Edison Plaza

u.s.tmus W y

300 Madison Avenue-

7"p

Toledo, OH 43652

%

(

'

4

'

Gentlemen:

F3

This refers to the routine safety inspection conducted by Mr. D. L. Robinson

of this office on September 21-22, 1981, of activities at the Davis-Besse

-

Nuclear Power Station, Unit 1, authorized by NRC Operating License No. NPI-3

<

and to the discussion of our findings with Mr. S. Quennoz at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

'

it is necessary that you (a) notify this office by telephone within seven (7)

4

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

J

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons which are the bases for the claim that the

information should be withheld from public disclosure. This section further

i

f#

'

si t

EEA E83 ass 8sh

PDR

i-----vw

e--*

Twi

w'

'-

eg ve

w

-m

ye w

Fyww

y y

--pwfT-

w

y

-y-

e4 f 4$e+t

7

4

W"--'9-vi*w*'"18"w+ge,e,m--y**1

---w--

-reygy-

-

f--9'--es,e

,wm-y-9-*-

g-

-

~

-

,

Toledo Edison Company

-2-

OCT 4 4 1981

i

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-

porated as far as possible into a separate part of the affidavit.

If we do

not hear from you in this regard within the specified periods noted above, a

copy of this letter and the enclosed inspection report will be placed in the

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

"Originst Signed by C.E. !brelin "

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosure:

IE Inspection

Report No. 50-346/81-17

cc w/ enc 1:

T. D. Murray, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Power

Siting Commission

Helen W. Evans, State of Ohio

N*

R1

yA (p

$

R111

R111

RI 1

hp

-gif

qg5

R bu 'on/so

JagldN

Streeter

W liams

No elius

10/2/81

~

l0/C

(C

/