ML20031H318
ML20031H318 | |
Person / Time | |
---|---|
Site: | Allens Creek File:Houston Lighting and Power Company icon.png |
Issue date: | 09/18/1981 |
From: | Copeland J BAKER & BOTTS, HOUSTON LIGHTING & POWER CO. |
To: | Stephens C NRC OFFICE OF THE SECRETARY (SECY) |
Shared Package | |
ML20031H319 | List: |
References | |
NUDOCS 8110270358 | |
Download: ML20031H318 (1) | |
Similar Documents at Allens Creek | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20058M0361993-04-12012 April 1993
[Table view]Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20235B4531987-09-22022 September 1987 Final Response to FOIA Request for Documents Re Specified Dockets.Documents in App a Already Available in Pdr.Forwards App B Documents.App B Documents Also Available in Pdr. Documents for Listed Dockets Could Not Be Located ML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ST-HL-AE-1666, Requests Relief from Preservice Insp of Certain Component Supports Per Section XI of ASME Boiler Pressure Vessel Code. Attachment 1 Shows Thermal Expansion Testing of Sys Subj to Preservice Exam of Component Supports1986-05-22022 May 1986 Requests Relief from Preservice Insp of Certain Component Supports Per Section XI of ASME Boiler Pressure Vessel Code. Attachment 1 Shows Thermal Expansion Testing of Sys Subj to Preservice Exam of Component Supports ML20140F3691986-01-14014 January 1986 Further Response to FOIA Request for Several Categories of Documents Re Pressure Suppression Containment.Fsar & SER for Limerick Only Documentation Re 4x4 Tests.Encl Apps D-G Documents Responsive to Item 4 Also Available in PDR ML20063H0331982-08-27027 August 1982 Advises That Plants Have Been Canceled.Alternative Dispositions of Application to Be Discussed W/Nrc. Certificate of Svc Encl ML20062G8131982-08-11011 August 1982 Forwards NRC to Util Re Slippage of CP Issuance Date,For Distribution to Parties ML20054H7481982-06-19019 June 1982 Forwards Houston Chronicle 820617 Article Re Util Requested Rate Increase.Article Appears Relevant to Ultimate Fate of Plant & Appears to Represent Slight Change from Util Dec 1981 Position on Plant Destiny ML20054H7581982-06-18018 June 1982 Advises That Feasibility of Continuing Plant Const Remains Under Util Consideration,W/Ultimate Determination Depending on Disposition of Request for Rate Relief Pending Before Tx Public Utils Commission ML20053B8551982-05-27027 May 1982 Advises That If ASLB Decides Evidence on ASLB Questions 1 & 3 Necessary at June 1982 Hearing,Nrc Would Adopt as NRC Testimony,Affidavits Submitted Supporting NRC 820507 Answers ML20052F2301982-05-0505 May 1982 Requests ASLB Consider 820429 Findings of Fact Even Though Findings Late.Due Date Misconstrued.Striking Findings Would Be Significant Penalty for Minor Infraction ML20050J0231982-04-0606 April 1982 Forwards Applicant Answers to Doherty Second & Third Sets of Interrogatories,Questions 29 & 8,respectively,re Quadrex Rept.Related Correspondence ML20050H2341982-04-0606 April 1982 Admits Truth of Items 160-163 in 820323 Request for Admissions.Relevance Not Admitted.Related Correspondence ML20050E4131982-04-0505 April 1982 Advises of Typographical Error in Applicant Answers & Objections to Doherty Fifth Set of Interrogatories.Related Correspondence ML20050E2851982-04-0505 April 1982 Forwards Applicant Answers & Objections to J Doherty Sixth & Seventh Sets of Interrogatories Re Quadrex Rept.Related Correspondence ML20050C7771982-03-31031 March 1982 Forwards IE Bulletin 82-01, Alteration of Radiographs of Welds in Piping Subassemblies. No Specific Actions Required ML20050C4991982-03-26026 March 1982 Forwards Jh Goldberg Testimony on Technical Qualifications, Lj Sas Testimony on Tx Pirg Addl Contention 31 & Applicant Response to Jf Doherty Request for Documents.Related Correspondence ML20042C6231982-03-25025 March 1982 Explains Problems W/Timing of Filings & Tx Bar Exam ML20042B5051982-03-16016 March 1982 Forwards Bechtel Preliminary Assessment Rept on Quadrex Rept.J Doherty Also Being Served Which Renders 820305 Motion for Bechtel Quadrex Rept Review Moot.W/O Encl. Related Correspondence ML20049J6861982-03-15015 March 1982 Advises That Future of Facility Still Under Review.Aslb Timely Decision Is Important Factor in Evaluation. Certificate of Svc Encl ML20049J6701982-03-10010 March 1982 Forwards Table of Contents & Citations Inadvertently Omitted from Applicant 820305 Brief in Opposition to Appeal of R Alexander ML20041F0881982-03-0909 March 1982 Forwards Attachment 1 to Applicant Answers to Doherty First Set at Interrogatories Re Quadrex Rept ML20041D8591982-03-0202 March 1982 Comments on Generic Ltr 81-40 Re Qualifications of Reactor Operators - License Exams ML20041B0671982-02-18018 February 1982 Responds to NRC Re Application of Final Rule on Licensing Requirements for Pending CP & Mfg License Applications.Final Rule Did Not Identify Need for Clarifying Changes to Facility Application.Commitments Acceptable ML20040H3381982-02-12012 February 1982 Forwards Util 820212 News Release Re Feasibility of Plant Licensing & Const,Per 820209 Conversation ML20040F8111982-02-0505 February 1982 Responds to Sj Wolfe .Ser Suppl 3 Needs to Be Supplemented or Altered Due to Commission Final Rule Re Licensing Requirements for Pending CPs ML20039E9771982-01-0808 January 1982 Forwards NRC Proposed Findings of Fact & Conclusions of Law on Environ Matters.Exhibit & Witness Index to Be Provided W/Applicant Safety Findings ML19255A1721982-01-0606 January 1982 Requests Temporary Waiver to 10CFR73.21 (d)(2) Re Storage of Unclassified Safeguards Info.Gsa Approved Containers Have Been Requisitioned W/Earliest Possible Delivery Date of 820315 ML20062M6221981-12-11011 December 1981 Requests Citizens for Fair Util Regulation Respond to Applicant Interrogatories 45-3 Through 83-3,subj of ASLB 810728 Order.Response Necessary So Applicant Can Seek Addl Discovery on Contention 4.Related Correspondence ML20033D0111981-12-0303 December 1981 Advises That Long & short-term Interest Rates in Table 20.2 of Peterson Written Testimony Are Both Actual Cost to Company & Stated or Face Amount of Interest Rate ML20033C9461981-12-0101 December 1981 Forwards Order of Witness Presentation.Names of Corps of Engineers Witness & NRC Witness on Generic Issues to Be Furnished Later in Wk.Svc List Encl.Related Correspondence ML20033A4221981-11-23023 November 1981 Forwards Transcript of 811116 Hearing,Pp 19,866-19,876, Wherein ASLB Ruled on Util & NRC 811030 Joint Motion to Establish Schedule to File Proposed Findings of Fact & Conclusions of Law & on J Doherty 811106 Motion to Reply ML20032C6691981-11-0606 November 1981 Forwards M Field Memo Explaining Correction to Testimony Re Tx Pirg Contention 6 on Mannings Coefficient.W/O Encl ML20032D9101981-11-0606 November 1981 Forwards Proposed Schedule for Presentation of Witness for 811116-20 & 1207-11 Hearing Sessions,Per ASLB 811030 Hearing Recommendation.Related Correspondence ML20032B1991981-10-30030 October 1981 Forwards Testimony of Vth Leung Re Doherty Contention 11,WL Brocks Re Doherty Contentions 15,21 & 24 & Je Knight & Je Kennedy Re ASLB Questions on Scram Discharge Level Monitoring Sys ML20032C8991981-10-29029 October 1981 Forwards Responding to ACRS Re post- Accident Inerting Sys ML20032C2761981-10-28028 October 1981 Responds to 810915 Request Re ATWS Issue.Util Committed Not to Preclude Incorporation of Any Design Mods Included in NUREG-0460,Vol 4 & to Incorporate Eventual Resolution of ATWS Issue in Design.Related Correspondence ML20011A6271981-10-22022 October 1981 Forwards F Litton Testimony Re Doherty Contention 43 on Stainless Steel Cleaning & Reg Guide 1.54.Testimony Should Be Presented on 811029 to Conserve Travel Funds & to Keep Continuity of Scheduled Issues Intact ML20031G9041981-10-16016 October 1981 Forward Applicant & NRC Agreed Order of Witness Presentation for 811116-20 Evidentiary Hearings.Related Correspondence ML20031E5441981-10-14014 October 1981 Forwards Table 1 & Attachment 1 to Rl Gotchy 811009 Testimony Re Increased Risk of Cancer & Noncancerous Effects of App I Levels of Radiation & T Urbanik Testimony Re Facility Evacuation Time Estimate Study ML20032B1271981-10-0808 October 1981 Forwards ACRS Re post-accident Inerting Sys ML20031F2921981-10-0808 October 1981 Clarifies 810817 Memo Re Status of State & Local Emergency Preparedness.State of Tx Has Not Prepared site-specific Plans.Any Unusual Problems Will Be Adequately Handled as site-specific Emergency Plans Are Developed ML20040A8681981-10-0404 October 1981 FOIA Request for NRC Reply to Senator L Bentsen Re Status of Facilities ML20031C4461981-10-0101 October 1981 Submits Applicant & NRC Schedule of Witness for 811005-09 & 26-30 Evidentiary Hearing Sessions ML20031H3181981-09-18018 September 1981 Forwards Util Supplemental Affidavit & Testimony on Contentions Still in Issue.Related Correspondence ML20010H4131981-09-18018 September 1981 Forwards CM Ferrell & L Soffer Testimony Re Bishop Contention 1,MW Hodges Testimony Re Doherty Contention 38B & Rl Tedesco to Util Requesting Addl Info Re ATWS Issue ML20031A9591981-09-16016 September 1981 Discusses Presentation at 257th ACRS Meeting on 810910-12 Re post-accident Inerting Sys Proposed as Means of Combustible Gas Control for Facilities.Acrs Requests Design Review Before NRC Approval ML20010H4291981-09-15015 September 1981 Requests Util Update FSAR for Review Prior to NRC Update of SER Section 15.2 & App C ML20010E6381981-09-0303 September 1981 Responds to ASLB Request for Parties Views on Status of Rn-222 Question.Present Record on Radon Sufficient to Support NRC Conclusion That Dose Commitments & Health Effects of U Fuel Cycle Are Insignificant ML20010E5921981-09-0202 September 1981 Forwards NRC & Applicant Order of Witness Presentation for 810914-18 & 1005-16 Hearings,Per ASLB 810616 Order as Modified 1993-04-12 Category:INCOMING CORRESPONDENCE MONTHYEARML20235B3621987-08-25025 August 1987
[Table view]FOIA Request for Listed Documents for Specified Dockets ST-HL-AE-1666, Requests Relief from Preservice Insp of Certain Component Supports Per Section XI of ASME Boiler Pressure Vessel Code. Attachment 1 Shows Thermal Expansion Testing of Sys Subj to Preservice Exam of Component Supports1986-05-22022 May 1986 Requests Relief from Preservice Insp of Certain Component Supports Per Section XI of ASME Boiler Pressure Vessel Code. Attachment 1 Shows Thermal Expansion Testing of Sys Subj to Preservice Exam of Component Supports ML20063H0331982-08-27027 August 1982 Advises That Plants Have Been Canceled.Alternative Dispositions of Application to Be Discussed W/Nrc. Certificate of Svc Encl ML20054H7481982-06-19019 June 1982 Forwards Houston Chronicle 820617 Article Re Util Requested Rate Increase.Article Appears Relevant to Ultimate Fate of Plant & Appears to Represent Slight Change from Util Dec 1981 Position on Plant Destiny ML20054H7581982-06-18018 June 1982 Advises That Feasibility of Continuing Plant Const Remains Under Util Consideration,W/Ultimate Determination Depending on Disposition of Request for Rate Relief Pending Before Tx Public Utils Commission ML20052F2301982-05-0505 May 1982 Requests ASLB Consider 820429 Findings of Fact Even Though Findings Late.Due Date Misconstrued.Striking Findings Would Be Significant Penalty for Minor Infraction ML20050J0231982-04-0606 April 1982 Forwards Applicant Answers to Doherty Second & Third Sets of Interrogatories,Questions 29 & 8,respectively,re Quadrex Rept.Related Correspondence ML20050H2341982-04-0606 April 1982 Admits Truth of Items 160-163 in 820323 Request for Admissions.Relevance Not Admitted.Related Correspondence ML20050E4131982-04-0505 April 1982 Advises of Typographical Error in Applicant Answers & Objections to Doherty Fifth Set of Interrogatories.Related Correspondence ML20050E2851982-04-0505 April 1982 Forwards Applicant Answers & Objections to J Doherty Sixth & Seventh Sets of Interrogatories Re Quadrex Rept.Related Correspondence ML20050C4991982-03-26026 March 1982 Forwards Jh Goldberg Testimony on Technical Qualifications, Lj Sas Testimony on Tx Pirg Addl Contention 31 & Applicant Response to Jf Doherty Request for Documents.Related Correspondence ML20042C6231982-03-25025 March 1982 Explains Problems W/Timing of Filings & Tx Bar Exam ML20042B5051982-03-16016 March 1982 Forwards Bechtel Preliminary Assessment Rept on Quadrex Rept.J Doherty Also Being Served Which Renders 820305 Motion for Bechtel Quadrex Rept Review Moot.W/O Encl. Related Correspondence ML20049J6861982-03-15015 March 1982 Advises That Future of Facility Still Under Review.Aslb Timely Decision Is Important Factor in Evaluation. Certificate of Svc Encl ML20049J6701982-03-10010 March 1982 Forwards Table of Contents & Citations Inadvertently Omitted from Applicant 820305 Brief in Opposition to Appeal of R Alexander ML20041F0881982-03-0909 March 1982 Forwards Attachment 1 to Applicant Answers to Doherty First Set at Interrogatories Re Quadrex Rept ML20041D8591982-03-0202 March 1982 Comments on Generic Ltr 81-40 Re Qualifications of Reactor Operators - License Exams ML20041B0671982-02-18018 February 1982 Responds to NRC Re Application of Final Rule on Licensing Requirements for Pending CP & Mfg License Applications.Final Rule Did Not Identify Need for Clarifying Changes to Facility Application.Commitments Acceptable ML20040H3381982-02-12012 February 1982 Forwards Util 820212 News Release Re Feasibility of Plant Licensing & Const,Per 820209 Conversation ML19255A1721982-01-0606 January 1982 Requests Temporary Waiver to 10CFR73.21 (d)(2) Re Storage of Unclassified Safeguards Info.Gsa Approved Containers Have Been Requisitioned W/Earliest Possible Delivery Date of 820315 ML20062M6221981-12-11011 December 1981 Requests Citizens for Fair Util Regulation Respond to Applicant Interrogatories 45-3 Through 83-3,subj of ASLB 810728 Order.Response Necessary So Applicant Can Seek Addl Discovery on Contention 4.Related Correspondence ML20033C9461981-12-0101 December 1981 Forwards Order of Witness Presentation.Names of Corps of Engineers Witness & NRC Witness on Generic Issues to Be Furnished Later in Wk.Svc List Encl.Related Correspondence ML20032D9101981-11-0606 November 1981 Forwards Proposed Schedule for Presentation of Witness for 811116-20 & 1207-11 Hearing Sessions,Per ASLB 811030 Hearing Recommendation.Related Correspondence ML20032C2761981-10-28028 October 1981 Responds to 810915 Request Re ATWS Issue.Util Committed Not to Preclude Incorporation of Any Design Mods Included in NUREG-0460,Vol 4 & to Incorporate Eventual Resolution of ATWS Issue in Design.Related Correspondence ML20031G9041981-10-16016 October 1981 Forward Applicant & NRC Agreed Order of Witness Presentation for 811116-20 Evidentiary Hearings.Related Correspondence ML20031F2921981-10-0808 October 1981 Clarifies 810817 Memo Re Status of State & Local Emergency Preparedness.State of Tx Has Not Prepared site-specific Plans.Any Unusual Problems Will Be Adequately Handled as site-specific Emergency Plans Are Developed ML20040A8681981-10-0404 October 1981 FOIA Request for NRC Reply to Senator L Bentsen Re Status of Facilities ML20031C4461981-10-0101 October 1981 Submits Applicant & NRC Schedule of Witness for 811005-09 & 26-30 Evidentiary Hearing Sessions ML20031H3181981-09-18018 September 1981 Forwards Util Supplemental Affidavit & Testimony on Contentions Still in Issue.Related Correspondence ML20030C6001981-08-25025 August 1981 Forwards Testimony on Schuessler Consolidated Contention 1, Baker Contention 1 & Updated Testimony on Need for Power Issues.Certificate of Svc Encl.Related Correspondence ML20030C3961981-08-21021 August 1981 Forwards ASLB Preliminary Ruling on Remaining Summary Disposition Motions & Portions of Transcript Discussing Preliminary Order.Related Correspondence ML20030B9171981-08-21021 August 1981 Forwards Info Describing plant-specific Implementation of Generic Resolution for Generic Issues Per 810807 Request. Info Re BWR Feedwater Nozzle Cracking,Rhr Requirement & Control of Heavy Loads Near Spent Fuel Encl ML20030B5701981-08-12012 August 1981 Forwards Response to 810720 Request for Updated Financial Info ML20009H2731981-08-0606 August 1981 Forwards Revised Sections & Table of Contents Discussed in NRC for ETR-1001,Ebasco Nuclear QA Program Manual.Revisions,Which Are Will Be Included in Change 10 to ETR-1001 ML20010A3781981-08-0505 August 1981 Forwards Mod to Util Submittal Addressing Item II.K.2.16 of NUREG-0718,reactor Coolant Pump Seal Damage Following Small Break LOCA W/Loss of Offsite Power.Mod Should Be Inserted on Page 0-8 of App 0 to PSAR ML20030B1301981-08-0303 August 1981 Forwards NRC & Applicant Order of Witness Presentation Per ASLB 810616 Order.Certificate of Svc Encl.Related Correspondence ML20010B3621981-08-0303 August 1981 Responds to Telcon Which Reminded of Failure to Encl Notice of Persons Served W/Tx Pirg Supplemental Direct Written Testimony of D Marrack ML20009B1991981-07-0707 July 1981 Informs That Doherty ,Per ASLB 810422 Order,Does Not Provide Any Substantive Rebuttal to Applicant & NRC Pleadings Re Doherty Motion for Reconsideration ML20009A8901981-07-0707 July 1981 Commits to Compliance W/Final Resolution of Core Thermocouple Issue to Be Determined by NRC in Near Future ML20009A8151981-06-30030 June 1981 Requests That Document Distribution List Be Revised Per Encl List ML20005B6161981-06-26026 June 1981 Submits Clarification of Util Position Re Use of Aci/Asme Std Code for Concrete Reactor Vessels & Containments.Code Provision Re Stress Limit Increase for Test Conditions Is Appropriate.Requests NRC Review W/Asme Code Committee ML20005A8971981-06-25025 June 1981 Forwards List of Contentions & ASLB Questions to Be Addressed in Aug & Sept 1981 ML19346A3371981-06-18018 June 1981 Forwards Amend 59 to PSAR ML20004C7521981-05-28028 May 1981 Forwards marked-up Version of Amend 57 to Psar.Mods Were Made as Result of NRC 810511-27 Review Meeting.Amend Is Available in Central Files Only ML20004C6611981-05-26026 May 1981 Forwards Proposed Order of Presentation of Witnesses for Two Wks of June Hearings.Related Correspondence ML20004E1401981-05-26026 May 1981 Confirms Commitment to Install Jetty Sys to Stabilize Bank of Brazos River in Vicinity of Proposed Plant ML19351A1131981-05-18018 May 1981 Expresses Concern Re Const of Facility ML20126L1321981-05-16016 May 1981 Opposes Facility Licensing ML19347F2611981-05-15015 May 1981 Forwards Amend 58 to Facility PSAR ML19347F5791981-05-15015 May 1981 Advises That Ebasco Svcs,Inc Will Benchmark Pipe Stress Computer Program Code,Pipestress 2010,against NUREG CR-1677, in Response to NRC Request.Program Will Be Scheduled for Completion Near End of 1983 1987-08-25 Category:LEGAL/LAW FIRM TO NRC MONTHYEARML20063H0331982-08-27027 August 1982
[Table view]Advises That Plants Have Been Canceled.Alternative Dispositions of Application to Be Discussed W/Nrc. Certificate of Svc Encl ML20054H7581982-06-18018 June 1982 Advises That Feasibility of Continuing Plant Const Remains Under Util Consideration,W/Ultimate Determination Depending on Disposition of Request for Rate Relief Pending Before Tx Public Utils Commission ML20050J0231982-04-0606 April 1982 Forwards Applicant Answers to Doherty Second & Third Sets of Interrogatories,Questions 29 & 8,respectively,re Quadrex Rept.Related Correspondence ML20050H2341982-04-0606 April 1982 Admits Truth of Items 160-163 in 820323 Request for Admissions.Relevance Not Admitted.Related Correspondence ML20050E2851982-04-0505 April 1982 Forwards Applicant Answers & Objections to J Doherty Sixth & Seventh Sets of Interrogatories Re Quadrex Rept.Related Correspondence ML20050E4131982-04-0505 April 1982 Advises of Typographical Error in Applicant Answers & Objections to Doherty Fifth Set of Interrogatories.Related Correspondence ML20050C4991982-03-26026 March 1982 Forwards Jh Goldberg Testimony on Technical Qualifications, Lj Sas Testimony on Tx Pirg Addl Contention 31 & Applicant Response to Jf Doherty Request for Documents.Related Correspondence ML20042B5051982-03-16016 March 1982 Forwards Bechtel Preliminary Assessment Rept on Quadrex Rept.J Doherty Also Being Served Which Renders 820305 Motion for Bechtel Quadrex Rept Review Moot.W/O Encl. Related Correspondence ML20049J6701982-03-10010 March 1982 Forwards Table of Contents & Citations Inadvertently Omitted from Applicant 820305 Brief in Opposition to Appeal of R Alexander ML20041F0881982-03-0909 March 1982 Forwards Attachment 1 to Applicant Answers to Doherty First Set at Interrogatories Re Quadrex Rept ML20062M6221981-12-11011 December 1981 Requests Citizens for Fair Util Regulation Respond to Applicant Interrogatories 45-3 Through 83-3,subj of ASLB 810728 Order.Response Necessary So Applicant Can Seek Addl Discovery on Contention 4.Related Correspondence ML20033C9461981-12-0101 December 1981 Forwards Order of Witness Presentation.Names of Corps of Engineers Witness & NRC Witness on Generic Issues to Be Furnished Later in Wk.Svc List Encl.Related Correspondence ML20032D9101981-11-0606 November 1981 Forwards Proposed Schedule for Presentation of Witness for 811116-20 & 1207-11 Hearing Sessions,Per ASLB 811030 Hearing Recommendation.Related Correspondence ML20031G9041981-10-16016 October 1981 Forward Applicant & NRC Agreed Order of Witness Presentation for 811116-20 Evidentiary Hearings.Related Correspondence ML20031C4461981-10-0101 October 1981 Submits Applicant & NRC Schedule of Witness for 811005-09 & 26-30 Evidentiary Hearing Sessions ML20031H3181981-09-18018 September 1981 Forwards Util Supplemental Affidavit & Testimony on Contentions Still in Issue.Related Correspondence ML20030C6001981-08-25025 August 1981 Forwards Testimony on Schuessler Consolidated Contention 1, Baker Contention 1 & Updated Testimony on Need for Power Issues.Certificate of Svc Encl.Related Correspondence ML20030C3961981-08-21021 August 1981 Forwards ASLB Preliminary Ruling on Remaining Summary Disposition Motions & Portions of Transcript Discussing Preliminary Order.Related Correspondence ML20030B1301981-08-0303 August 1981 Forwards NRC & Applicant Order of Witness Presentation Per ASLB 810616 Order.Certificate of Svc Encl.Related Correspondence ML20009B1991981-07-0707 July 1981 Informs That Doherty ,Per ASLB 810422 Order,Does Not Provide Any Substantive Rebuttal to Applicant & NRC Pleadings Re Doherty Motion for Reconsideration ML20005A8971981-06-25025 June 1981 Forwards List of Contentions & ASLB Questions to Be Addressed in Aug & Sept 1981 ML20004C6611981-05-26026 May 1981 Forwards Proposed Order of Presentation of Witnesses for Two Wks of June Hearings.Related Correspondence ML20008G0811981-05-0505 May 1981 Forwards Proposed Schedule for Presentation of Witnesses for 810511-22 Hearings.Other Parties Concur.Related Correspondence ML20008G1851981-05-0101 May 1981 Requests That 810511-22,0601-12 Evidentiary Hearings on Health & Safety Issues Be Rescheduled for 810713-17 & 20-24 Subj to ASLB Availability.Lists of Contentions Will Be Provided by 810518 ML19345G5351981-03-27027 March 1981 Forwards Ltr Advising of Stretchout in Facility Const Schedule Due to Financial Constraints.Urges That ASLB Maintain Proceeding Schedule Consistent W/Decision Date Not Later than Early 1982.Certificate of Svc Encl ML19350C6251981-03-20020 March 1981 Advises That Amend 56 to PSAR Was Filed in Anticipation of Preparation of Testimony Re Health & Safety Issues to Be Tried in May.Testimony Will Relate to Current Design for Plant.Psar Changes Encl.Related Correspondence ML19341D5271981-02-24024 February 1981 Submits Mar,1981 Court Schedule Allowing cross-examination of Applicant,Intervenor,Nrc & Tx Expert Witnesses ML19345F4681981-02-10010 February 1981 Forwards Applicant Response to Intervenor Doherty Supplemental Responses to Motions for Summary Disposition. Response Withheld Per ASLB 800627 Protective Order,As Amended by 801205 Order.W/O Encl ML19340D4861980-12-20020 December 1980 Requests to Make Appearance Before Commission on 810114 or 15 in Houston,Tx Re Util Request for CP ML19343B8311980-12-18018 December 1980 Forwards Applicant Direct Testimony in Environ Phase of Proceeding Scheduled to Begin 810112.Testimony Addresses Issues Re Cooling Lake,Energy Alternatives,Transmission Lines,Alternative Sites & Barge Slips ML19340D1351980-12-18018 December 1980 Forwards L Hamilton 801218 Testimony Re Doggett Contention 1(b) & ASLB Question 1 on Health Effects of Coal & Nuclear Power & Tx Pirg Contention 1(f) on Comparative Population Risks ML19345D4781980-12-0606 December 1980 Responds to ASLBP 801202 Request for Clarification Re Exclusion of Tx Pirg Contention 30.1 from Applicant 800804 Motion for Summary Disposition.Unfiltered Leakage Issue Is Relevant to Mccorkle Contention 17 Only ML19345B8631980-11-26026 November 1980 Forwards Memorandum in Support of Applicant Request to Set Date for Commencement of Health & Safety Hearings. Certificate of Svc Encl ML19338E9111980-10-0202 October 1980 Forwards Transcript of 801001 Telcon Taken from Tape Recording Made by Applicant Counsel at Request of Chairman Wolfe ML19337B2751980-09-25025 September 1980 Advises That Applicant Brief in Response to D Springer 800902 Notice of Appeal Will Be hand-delivered to Aslab & Sent by Guaranteed Mail to D Springer.Aslb Svc List Was Inadvertently Used for 800924 Svc.Related Correspondence ML19338E1091980-09-22022 September 1980 Forwards Original Affidavit by Wg Gang Re GE Document Known as Reed Rept.W/O Encl.Related Correspondence ML19338D7221980-09-19019 September 1980 Forwards Affidavits of Wc Gang & Sh Grate of GE & Brown & Root,Respectively,Re Claims That Certain Documents Receive Protective Treatment.Affidavits Comply W/Aslb 800821 Order. Related Correspondence ML19344F4191980-09-10010 September 1980 Forwards Revised Pages 7-10 & 13 to Applicant 800807 Response in Opposition to Tx Pirg Class 9 Motion.Applicant Overlooked Provision Precluding Parties from Citing Statements at Open Commission Meetings.W/Certificate of Svc ML19344D8741980-08-22022 August 1980 Urges Reconstitution of ASLB to Commence Hearings Due to Unavailability of Present Board.Fair Weight Must Be Given to Interests of Applicant,Ratepayers,Shareholders & Natl Energy Policy.Certificate of Svc Encl ML19331D2011980-08-22022 August 1980 Informs That on 800813 Chair Denied Applicant Motion to Establish Schedule for Commencement of Evidentiary Hearings. Applicant Urges That Members of ASLB Assigned for Proceeding Be Relieved of Conflicting Responsibilities ML19344D8711980-08-18018 August 1980 Forwards Applicant 800818 Response to Intervenor Potthoff Second Set of Interrogatories.Related Correspondence ML19331B8971980-08-0808 August 1980 Forwards Corrected Page 14 to Applicant 800807 Response in Opposition to Tx Pirg Class 9 Motion ML19320B3221980-06-20020 June 1980 Concurs w/800611 Proposal to Consolidate Interrogatories Baker 1,Cumings 1,TX Pirg Addl 32,Doggett 4 & Perrenod 1 W/ Baker as Representative.Confirms That Doggett Will Lead Party on Consolidated Contentions Bishop 14 & Doggett 1(b) ML19318A5941980-06-17017 June 1980 Concurs W/Nrc 800611 Position Re Intervenor B Baker 800603 Contention Re Linkage Between Financial Qualification & Safety.Order Consolidating Such Contentions & Appointing Single Litigating Party Requested.Certificate of Svc Encl ML19318A0581980-06-11011 June 1980 Advises That Disputed Items Between Applicant & Intervenors Tx Pirg & C Hinderstein,Re ASLB 800530 Order,Have Been Resolved ML19318A0781980-06-0909 June 1980 Recommends That Aslab Composition Be Changed to Remove Imbalance Between Lawyer & Technical Members & That Unnecessary Legalistic Burdens,Procedures & Requirements Be Eliminated ML19323H3541980-05-20020 May 1980 Urges That Applicant 800429 Motion Be Granted to Compel Production of Documents from Tx Pirg & C Hinderstein,Re Three Groups of Documents Not Produced on 800515.Certificate of Svc Encl.Related Correspondence ML19290C8591980-01-29029 January 1980 Notifies of Receipt of Intervenor Tx Pirg Responses to Applicant Fourth Set of Interrogatories.Withdraws 800124 Motion to Compel.Requests Extension Until 800227 to Complete Discovery Against Tx Pirg ML19257C1371980-01-11011 January 1980 Responds to 791227 Info Request Re NUREG-0460.GE Published Dec 1979 Suppl, Assessment of BWR Mitigation of ATWS Vol II (NUREG-0460 Alternative Number 3). Requests That ASLB 791022 Protective Order Be Amended Accordingly ML19256F9061979-12-0707 December 1979 Notifies That Environ Rept & PSAR Have Been Forwarded Under Separate Cover,In Response to 791121 Request 1982-08-27 |
Text
\\
BELATED CORRESPONDENb' o
B BAKER & BOTTS DOCKET NUMtsa
- PRO.D. & UTIL FAC.k.hjk,_
o s,,,,a y,,,
houston. TEXAS 77oo2 ggg.
y:==
TELEPHONE (713) 229-6234 wAssiNoTON OrriCg 1701 P E N N SYLV ANI A AV E.. N. W.
TELECO M M U NICATION WASHINGTON, CL C. 20006 (713) 229-4523 HOUSTON TELEPHoN E (202) 457-5500 (202)457-5531 WAS HINGTON. C. C.
September 18, 1981 c)
S f\\0 h
O Mr. Chase R.
Stephens V ']s N
Q Docketing and Service Section
}
l
- }
(
g2 3 ISOI 8'
D ec l'
Office of the Secretary
's'~%:.'no geeets 2
of the Commission OCT2 619815
'I DJ,ygg,We U. S. Nuclear Regulatory Comm dsigg
,wrm y y
Bran Washington, D.
C.
20555
== m od
,J Ej N
Cp 4
Dear Mr. Stephens:
/g g
p Enclosed for filing is an original of Houston Lighting & Power Company's supplemental affidavits and testimony on the contentions which the Board did not dismiss in the Second Order Ruling Upon Motions for Summary
~I:)
Disposition.
QQ Very truly yours, k
J-Gregory Copeland Attorney for Applicant Houston Lighting & Power Company JGC/192 enclcsures/
4 9he e
8110270358 810918 PDR ADOCK 05000466 T
PDR L