Forwards IE Insp Rept 50-267/81-21 on 810812-13.No Noncompliance Noted
ML20031H214
Person / Time
Site: Fort Saint Vrain 
Issue date: 10/22/1981
From: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20031H215 List:
References
NUDOCS 8110270261
Download: ML20031H214 (2)


See also: IR 05000267/1981021

Text

.-

. _ - ,

.y-__

_

-

.

.

l

.

.

.

i

,

October 22, 1981

<

f

!

mN

t

l

In Reply Refer to:

t

Docket: 50-267/81-21

t

/

4

O

I2 0 n81am,4

'

,

.

-

b

9

-

{-(- 8.s.%%=%% n

~L

Public Service Company of Colorado

ATTN: Mr. O. R. Lee, Vice President

N

l

,

Electric Production

/

4

f\\-

P. O. Box 840

s

,9 '

j

' Denver, Colorado 80201

g

j

Gentlemen:

'

This refers to the routine safety inspection conducted by John Sears of-the.

91 vision of Emergency Prepareoness, IE:HQ, and other NRC personnel on August 12

.

and 13,1981, of activities at the Fort St. Vrain Nuclear Generating Station

.

,

authorized by NRC Operating License No. DPR-34, and to the discussion of our

findings with Mr. Warembourg and others of your staff at the exit interview.

'

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within the scope of the inspection no violations or devia-

"

tions were identified.

.

!

!

As was discussed at the exit interview, wa are concerned about the lack of

facilities at the interim Forward Comunand Post. As discussed at the exit

interview, you agreed to inform the NRC by September 13 as to your plans for

.i

upgrading the interim Fonvard Command Post until the permanent facility is

l

completed. We.are in receipt of your September 14, 1981, letter in which you

discussed your plans for upgrading the interim Forward Casanand Post and

,

i

although we concur with your actions, we should point out that the

'

interim facility does not centain accoaumodations for women.

!

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

,

i

this letter and the enclosed inspection report will be pinced in the NRC's

Public Document Room. If this report contains any information that you

believe to be exampt from this disclosure under 10 CFR 9.5(a)(4), if is

necessary that you (a) notify this office by telephone within ten (10) days

from the date of this letter of your intention to file a request for with-

holding and (b) submit 25 days from the date of this letter a written appli-

t

i

cation to this office to withhold such information. Section2.790(b)(1)

requires that any such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or

.

r

part sought to be withheld, and which contains a full statement of the

reasons which are the basis for the claim that the information should be

withheld from public disclosure. This section further requires the statement

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

g: Gr*<4 h*M"d$

XR.$ters

Y$

  • Y

EC. .h . . . . . ...RP.B. m ...

. IES. . . . q /... ...0

mc+

....

8110

1.ias. P ^270261 811o22""""

" " " " " " "

-+ cmc.wnse..aw&n..

.anagu;

lo. . ...a

  • cx oscoo267 ..

.

...............

.

'"* 1.9/.15/.81. . . . . ...!Rlh.l81.... ..).qtf / .1.L....

...!

8.1. 4 . ............. 4..... ?.".......

....... .......

.

E""" "E'? ""T.""'" _ _PfFICI A1. RECORD COPY __ _, _,_,_,_,_j

.

.

.

Public Service of Colorado

2

The infonration sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you !.9 this

regard within the specified periods noted above, a copy of this letter and

the enclosed inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely.

Original signed by

John T. Collins

John T. Collins

Deputy Director

Enclosure:

Appeadix - IE Inspection Report No. 50-267/81-21

cc: w/ encl:

D. W. Warembourg, !!uclear Production

Hanager

Fort St. Vrain Nuclear Station

P. O. Box 368

-

Platteville, Colorado 806S1

J. Gahm, Quality Assurance

(SameAddress)

bcc to DMB:(IE01)

bcc distrib. by RIV:

BC

RESIDENT INSPECTOR

PM

SECTION CHIEF

AE00

STATE (s)

ELD

iIFO SYSTEMS

IE/RPRIB

J. R. SEARS, IE:HQ

IE FILE

C. A. HACKNEY, RIV

NRR/DHFS

NRR/0LB

RAD ASMT BR

RESEARCH

PDR:HQ

LPDR

NSIC

_

c'nct>

.

..

..

.... . .

..

..

...

.. ..

...

.

.

..

. ,,

"""*"'>

. . .. . . ...

.. ... .

.

. .

..

. .

..

..

-

..

" ' " >

.

..

. . . . ...

.

.

. . . . . .

.. .

. .... ..

. . . .

..... ..,... ....... ..

" " ' ' * " * ' " " ' " " '

t ""C '

OFFICIAL RECORD COPY

j