ML20031H181
| ML20031H181 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 10/14/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20031H182 | List: |
| References | |
| NUDOCS 8110270226 | |
| Download: ML20031H181 (2) | |
See also: IR 05000456/1981010
Text
..
.
,
OCT , 41981
t-
co
S
0
Docket No. 50-456
ge f,3h4
Docket No. 50-457
S.
v4,11
0
u,s,0T2 g IS8fA ~-
~
>
-
Commonwealth Edison Company
I
k g %, 8
ATTN:
Mr. Cordell Reed
7
Vice President
A
Post Office Box 767
Q
p
/gg,
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. C. M. Erb
of this office on September 1-3, 1981, of activities at Braidwood Station,
Unita 1 and 2, authorized by NRC Construction Permits No. CPPR-132 and
No. CPPR-133 and to the discus an of our findings with Mr. Cosaro,
Mr. Sommerfield and others of your staff at the conclusion of the inspec-
tion.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, obser;ntions, and in-
terviews d h personnel.
During this inspection, certain of your cativities appeared to be in non-
comoliance with NRC requirements, as speci..ed in enclosed Appendix A.
A
,
written response, submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter, the enclosures, and your response to this letter will be
placed in tl.a NRC's Public Document Room.
If the enclosures contain any
information that you or your contractors believe to bs exempt from dis-
!
closute under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this
!
office by telephone within seven (7) days from the cate of 1.his letter of
'
your intention to file a request for withholding; and (b) submit within
twenty-five (25) days from the date of this letter a written application
to this office to withhold such information. Section 2.790(b)(1) requires
that any such application must be accompanied by a affidavit exacuted by
the owner of the information which identifies the document or part sought
to be withheld, and which contains a full statement of the reasons which
sFI
.-
Si t
8110270226 811014'
i
PDR ADOCK 05000456
0
..
.
.
Commonwealth Edison Company
-2-
OCT 1 4 G81
are the bases for the claim that the information should be withheld from
public disclosure. This section further requires the statement to address
with specificity the considerations listed in 10 CFR 2.790(b)(4). The in-
formation sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, a copy of this letter,
the enclosures, and your response to this letter will be placed in the
Public Document Room.
,
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Reports
No. 50-456/81-10 and
No. 50-457/81-10
cc w/encls:
Louis 0. De1 George
Director of Nuclear
Licensing
R. Cosaro, Project
Superintendent
V. I. Schlosser,
Project ?!anager
J. F. Gudac, Station
Superintendent
DBIB/ Document Control Desk (RIDS)
tiary Jo ?!urray, Office of
Assistant Attorney General
RIII
RIII
IIJ
RI
RII.-)
C:M c/so
&
,.
Erb
anie
n
a
killiams
No
tus
/g/p//[
/e/7/yes
g[9
10/5/81
gj
) gyp
1