Forwards IE Insp Repts 50-456/81-10 & 50-457/81-10 on 810901-03 & Notice of Violation
ML20031H181
Person / Time
Site: Braidwood  
Issue date: 10/14/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20031H182 List:
References
NUDOCS 8110270226
Download: ML20031H181 (2)


See also: IR 05000456/1981010

Text

..

.

,

OCT , 41981

t-

co

S

0

Docket No. 50-456

ge f,3h4

Docket No. 50-457

S.

v4,11

0

u,s,0T2 g IS8fA ~-

~

>

-

Commonwealth Edison Company

I

k g %, 8

ATTN:

Mr. Cordell Reed

7

Vice President

A

Post Office Box 767

Q

p

/gg,

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. C. M. Erb

of this office on September 1-3, 1981, of activities at Braidwood Station,

Unita 1 and 2, authorized by NRC Construction Permits No. CPPR-132 and

No. CPPR-133 and to the discus an of our findings with Mr. Cosaro,

Mr. Sommerfield and others of your staff at the conclusion of the inspec-

tion.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, obser;ntions, and in-

terviews d h personnel.

During this inspection, certain of your cativities appeared to be in non-

comoliance with NRC requirements, as speci..ed in enclosed Appendix A.

A

,

written response, submitted under oath or affirmation, is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter, the enclosures, and your response to this letter will be

placed in tl.a NRC's Public Document Room.

If the enclosures contain any

information that you or your contractors believe to bs exempt from dis-

!

closute under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this

!

office by telephone within seven (7) days from the cate of 1.his letter of

'

your intention to file a request for withholding; and (b) submit within

twenty-five (25) days from the date of this letter a written application

to this office to withhold such information. Section 2.790(b)(1) requires

that any such application must be accompanied by a affidavit exacuted by

the owner of the information which identifies the document or part sought

to be withheld, and which contains a full statement of the reasons which

sFI

.-

Si t

8110270226 811014'

i

PDR ADOCK 05000456

0

PDR

..

.

.

Commonwealth Edison Company

-2-

OCT 1 4 G81

are the bases for the claim that the information should be withheld from

public disclosure. This section further requires the statement to address

with specificity the considerations listed in 10 CFR 2.790(b)(4). The in-

formation sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, a copy of this letter,

the enclosures, and your response to this letter will be placed in the

Public Document Room.

,

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-456/81-10 and

No. 50-457/81-10

cc w/encls:

Louis 0. De1 George

Director of Nuclear

Licensing

R. Cosaro, Project

Superintendent

V. I. Schlosser,

Project ?!anager

J. F. Gudac, Station

Superintendent

DBIB/ Document Control Desk (RIDS)

tiary Jo ?!urray, Office of

Assistant Attorney General

RIII

RIII

IIJ

RI

RII.-)

C:M c/so

&

,.

Erb

anie

n

a

killiams

No

tus

/g/p//[

/e/7/yes

g[9

10/5/81

gj

) gyp

1