Text
_
- - _
,
.
.-
.
t B OCT 5
Docket No. 50-334
Duquesne Light Company
-
-_
ATTN: Mr. J. J. Carey
b
Vice President
%
o{
y
hj
s
Nuclear Division
ff
-
.
.
RJ-'
Post Office Box 4
-
-
OCT2 61981
h
Shippingport, Pennsylvania 15077
--
Gentlemen:
"d' *Eli
/
,
h ,m, i n ah \\ .M9
Subject:
Inspection 50-334/81-22
This refers to the routine inspection conducted by Messrs. J. C. Jaiig and C.
D. Evans of this office on August 25 - 27,'1981 of activities authorized by
NRC License No. DPR-66 and to the discussions of our findings held by Messrs.
Jang and Evar.: with Mr. H. P. Williams and other members of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that-one of your activities
was not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
This item of non-
compliance has been categorized into the levels described in the Federal
Register Notice (45 FR 66754) dated October 7, 1980. You are required to
respond to this letter and in preparing your response, you should follow the
instructions in Appeadix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this latter and the enclosures will be placed in the NRC's Public Document
Room.
If this report contains any information that :cu (or your contractors)
believe to be exempt frcm disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within ten (10) days from the
date of this letter of your intention to file a request for withholding; and
(b) submit within 25 days from the date of this letter a written application
to this office to withhold such information. Consistent with section 2.790(b)(1),
RI:DEP&OS
- DEP&OS
t
I:DEP&OS
.DR&PI
Jang/cgl
\\
' tan
Snyder
eimi
9/24/81
7_g4 l
J
p.A
(k fr -
OFFICIAL RECORD COPY
T
- lE
U
.s
Ift
8110270191 811000~
PDR ADOCK 03000334
G
.
-
.-
,
.
.
.
Duquesne Light Company
2
0 8 OCT 1S81
any such application must be accompanied by an affidavit executed by the owner
of the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons on the basis which it is
claimed that the information should be withheld from public disclosure. This
section further requires the statement to address with specificity the consider-
ations listed in 10 CFR 2.790(b)(4). The information sought to be withheld
shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted
above, the report will be placed in the Public Document Room. The telephone
notification of your intent to request withholding, or any request for an
exte :sf on of the 10 day period which you beliave necessary, should be made to
the Supervisor, Files, Mail and Records, USNRC Region I, at (215) 337-5223.
.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
Original 51gned Bys
,
Richard R. Keimig, Chief, Projects
Branch No. 2, Division of Resident
and Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-334/81-22
cc w/encls:
F. Bissert, Manager, Nuclear Support Services
R. Washabaugh, QA Manager
Station Superintendeat
General Superintendent, Power Stations Department
R. Martin, Nuclear Engineer
J. Sieber, Manager, Nuclear Safety and Licensing
T. D. Jones, Manager, Nuclear Operations
R. M. Mafrice, Nuclear Engineer
N. R. Tonet, Manager, Nuclear Engineering
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsyvlania
-bec w/encls:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encls)
0FFICIAL RECORD COPY
J