t B OCT 5

Docket No. 50-334

Duquesne Light Company

-

-_

ATTN: Mr. J. J. Carey

b

Vice President

%

o{

y

hj

s

Nuclear Division

ff

-

.

.

RJ-'

Post Office Box 4

-

-

OCT2 61981

h

Shippingport, Pennsylvania 15077

--

Gentlemen:

"d' *Eli

/

,

h ,m, i n ah \\ .M9

Subject:

Inspection 50-334/81-22

This refers to the routine inspection conducted by Messrs. J. C. Jaiig and C.

D. Evans of this office on August 25 - 27,'1981 of activities authorized by

NRC License No. DPR-66 and to the discussions of our findings held by Messrs.

Jang and Evar.: with Mr. H. P. Williams and other members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that-one of your activities

was not conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Appendix A.

This item of non-

compliance has been categorized into the levels described in the Federal

Register Notice (45 FR 66754) dated October 7, 1980. You are required to

respond to this letter and in preparing your response, you should follow the

instructions in Appeadix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this latter and the enclosures will be placed in the NRC's Public Document

Room.

If this report contains any information that :cu (or your contractors)

believe to be exempt frcm disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your intention to file a request for withholding; and

(b) submit within 25 days from the date of this letter a written application

to this office to withhold such information. Consistent with section 2.790(b)(1),

RI:DEP&OS

DEP&OS

t

I:DEP&OS

.DR&PI

Jang/cgl

\\

' tan

Snyder

eimi

9/24/81

7_g4 l

J

p.A

(k fr -

OFFICIAL RECORD COPY

T

  1. lE

U

.s

Ift

8110270191 811000~

PDR ADOCK 03000334

G

PDR

.

-

.-

,

.

.

.

Duquesne Light Company

2

0 8 OCT 1S81

any such application must be accompanied by an affidavit executed by the owner

of the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons on the basis which it is

claimed that the information should be withheld from public disclosure. This

section further requires the statement to address with specificity the consider-

ations listed in 10 CFR 2.790(b)(4). The information sought to be withheld

shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted

above, the report will be placed in the Public Document Room. The telephone

notification of your intent to request withholding, or any request for an

exte :sf on of the 10 day period which you beliave necessary, should be made to

the Supervisor, Files, Mail and Records, USNRC Region I, at (215) 337-5223.

.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

Original 51gned Bys

,

Richard R. Keimig, Chief, Projects

Branch No. 2, Division of Resident

and Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-334/81-22

cc w/encls:

F. Bissert, Manager, Nuclear Support Services

R. Washabaugh, QA Manager

Station Superintendeat

General Superintendent, Power Stations Department

R. Martin, Nuclear Engineer

J. Sieber, Manager, Nuclear Safety and Licensing

T. D. Jones, Manager, Nuclear Operations

R. M. Mafrice, Nuclear Engineer

N. R. Tonet, Manager, Nuclear Engineering

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsyvlania

-bec w/encls:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encls)

0FFICIAL RECORD COPY