TIIE CINCINNATI GAS & ELECTRIC COMPANY eg -
CINCINN ATI. OHIO 4520t September 17, 1981 sci.oYwcc UcsIo)st h
'_ PRINCIPAL STAFF ~i 3D A
I g
{
I U. S. Nuclear Regulatory Commission U d1E&TI W Office of Inspection and Enforcement Region III g
y p,'
'U" Glen Ellyn, Illinoi; 60137 m
ATTENTION: Mr. James G. Keppler Regional Director
SUBJECT:
Wm. H. Zimmer Nuclerr Power Station - Clermont County, Ohio Construction / Fuel Load Schedule and Progress Update August, 1981.
Gentlemen:
Please be advised regarding the above subject that this project is.
considered 96.6% complete as of August 25, 1981.
Attached are copies of the form showing actual dates and status of various activities.
Please feel free to contact us if there are any questions or comments.
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY
==- --
E. A. Borgmann Senior Vice-President EAB:dw cc: Wm. H. Lovelace W. F. Christianson, NRC Resident Inspector f 6I i
- 811020071A GiO917 PDR ADOCK 05000359
~
SEP 2 5 y m
1--
e -e.. -,,,,. ngg=..
~~
- Tura DATES & STATUS DOCKET NO. 50-358 BWR CONSTRUCT 10ii MILESTONES AND ACTIVITIES
~
'I FOR STATUS DATE - Augus't.
1981 i
WM. H. ZIP 94ER NUCLEAR POWER STATION Activity Acti/fty Est.
I-J Numbers (Descriptica & Account Numbers)
Started Complete Status 0
80^5 Hobilize 3-71 6-71 Comp 1.
0 8014 Tenden Tunnel & Backfill 10-72 5-73 Comp 1.
0 8155 Install Diesel Generator and Oil Tank Building (1220) 5-74 9-79 Comp 1.
f n
8235 Install Condensate Water Storage Tank (2491-3310) 6-74 10-75 Comp 1.
)
0 8245 Install Reactnr Clean-Up System Demineralizers (2423-5110.5250.5410) (2427-5410) 7-75 11-75 Comp 1.
l 0
8265 Install RHR Pumps (2425-5110) 7-75 2-78 Comp 1.
0 8270 Install RHR Heat Exchangers (2425-5210) 11-75 11-75 Conpl.
0 8280 Construct Radioactive Waste Facility (1260) 4-74 12-78 Compl.
I O
8315 Install Motor Control Centers (MCC's) and 480 Volt Unit substation (4711-7470.7490)(4718-7470).
i?-7s 5-78 Comp 1.
0 8320 Install Instrumentation Air System (2652)
_ 6-76 4-79 Comp 1.
- O 8330 Install Recirculating Piping (2641) 11-72 5-79 Comp 1.
0 8341 Init.11 Reactor Building Closed Cdoling Water System (2673) 7-75 5-79 Comp 1.
i O
8350 Install HPCS LPCS and ADS Systems (2647) 2648) & M S Relief Valves 10-75 5-79 Compl.
i 0
8365 Install Standby liquid Control System (2681) (2422) 2-76 5-79 Comp 1.
l 0
8370 Process Control & Loalc Instrumentation Calibration (2470) 8-75 __
2-82Est.
97%
0 8400 Install 6.9KV Reserve Power Supply (4715) 10- 75 6 77
_Cn - ~1 l
t
.~,._. _
.m
,w_....
..y.._-
e
~
/
s 9.
- he 4 c'
Activity Activity Est.
f-J NU'4BERS (Description & Account Numbers)
Startid Compittid Status.
~
0 8405 Install Conduit and Cable Trays (4750-7110, 7180, 7120) 8-73 5-81 Comp 1.
i 0
8410 Install 6.8KV and 4.16KV Auxiliary Switchgear (4712) 11-75 7-79 Comp 1.
\\
0 3415 Install Cables (Instrumentation. Control and Power) (XXXX-7310 thru 7370)(XXXX-7210 thru 7270; 2-76 2-82 Est.
98%
0 8420 Perform Construction Testing on Cables (Megger, Cc Vinuity. Etc.)
CG&E 2-76 8-81 Est.
95%
f 0
8425 Install Batteries and Chargers (4722-7550, 7560) 4-76
- 2-77 Comp 1.
f4 0,
T Install Process Instruments (2650-0000) (2470-0000) 6-76 2-82 Zst.
97%
0 8520 HPCS and LPCS Actuation and Partial Flow Test CG8E 5-M 11-81 Est.
50%
7-81Est 11-81 Est.
3%
l 0
8525 RCIC Actuation and Partial' Flow Test
=
7-81Est 11-81 Est 10%
a 0
8530 RHR System Actuation and Flow Test 10-79 3-82 Est.
40%
0 8535 Stand-by Liquid Control System Actuation Flow Test
=
0 8540 Rect'rculation Pump Cold Flow and Vibration Test 4-81 1-82 Est.
40%
=
4-82Est 5-82 Est.
29%
0 8545 Integrated Diesel Generator Synchronizing Test 10-78 3-82 Est.
46%
0 8550 Service Water System and Closed Wate'r Systems Test 11-78 10-79 Comp 1.
=
0 8555 Battery Capacity Test 10-80 4 82 Est.
81%
l
=
0 8570 DC Inverter / Diverter System Test 4-79 4-81 Compl.
0 8575 Control Rod Drive Hydraulic System Test
=
10-79 3-82 Est.
75%
0 8580 Feedwater and Condensate System Test (2 Elements)
=
7-79 2-81 Comp 1.
0 8585 Instrument Air System Test
=
i 6-79 4.82 Est.
75%
li 0 8590 Fire Protection System Test l
0 8595 Flasunbility Control System (HG)12-81Est 4-82 Est.
0%
0 i
t i
.~
l.*
/
i e
b y
^
(.
V, t_
Fag: 3 I-J Numb'rs (Description & Account Numbers)
Activity Activity Est.
Started _
Completed Status 0
8510. Reactor Building Vent System Test CGAE 9-80 5-81 Est.
73%
0 8730 Speical Nuclear Material License Issued CG&E 4-77 7-78 Comp 1.
0 8735 Applicant Sumbits Emergency Plan CGAE 9-75 11-77 Compl.
0 8740 Applicant Submits Security Plan CG4E 9-75 5-77 Compl.
0 8745 Applicant Submits Quality Assurance ogram for Operations CG&E 9-75 12-77 Compl.
0 8750 Applicant's Review and Approval of Test Results CG&E 7-82 Est.
7-82 Est.
0%
0 8755 Applicant's Preparation of Power Ascension Test Program CG8E 4-77 7-82 Est.
25%
O _8805 Install Control Room Consoles and Equipment (2475)(2471) 8-75 2-82 Es t.
90%
l 0
8810 Accumulation of Environmental Data (One (1) or Two (2) Years)
Compi.
0 8820 Install.and Calibrate Nuclear Instrumentation (2474) 12-75 5-80 Comp 1.
0 8900 Install Primary Switchyard CG8E 8-75 8-78 Comp 1.
0 8905 Install Off-Gas Systems (2685) (2462) 4-74 6-81 Compi.
0 8240 Install Condensate Suction Header to RCIC System (2642) (2634) 5-75 2-77 Comp 1.
8005 8015 Prepare Site (l'n'))
5-71 6-71 Comp 1.
8015 C050 Install Reactor Building Foundation' (1211) 6-73 10-73 Comp 1.
l 8050 8200 Install Drywell and Suppression Chamber and Reactor Pressure Vessel Pedestal (2213) (2411) 10-73 2 -8 2 Est.
90%
8055 8325 Construct Reactor Bulding and Integral Structures (1210) 10-73 9-79 Compl.
8050 8145 Construct Turbine / Generator Foundation (3514) 10-73 6-78 Compl.
8065 8915 Install Off-Gas Stack (2466-3610) 8-76 7-78 Compl.
8075 8920 Install < Secondary Heat Sinks (Cooling Towers)(3571) ~
9-73 5-76 Compl.
12-73 11-74 Compl.
8115-8120 InstallContainmentPenetrations(SleevesinLiner)(2213-3770) n-O s
- a t
e f'
..g.
r.,a ~
Activity Activity Est.
I-J Nu-bers (Description 5 Account Numbers)
Started Complet7 Status 3140 8275 Install Service Water intake Structures (1280) 8-74 10-78 Compl.
E145 8910 Install Condenser. Turbine Generator and Piping (Exclusive of Condensate and Feedwater Piping) (3531) (3511) 8-75 12-80 Comp 1.
B150 8285 Install Feedwater and Condensate Water System (2623) (2634) 1-75 5-79 Compi 6
3155 8445 Install Diesel Generator (2487-5160) 5-76 8-78 Compl.
-9165 8430 Install Drywell Air Cooler System (2624) 7-76 1-82 Est.
92%
3175 8180 Install Containment Biological Shielding (2213-3750,2740.2720.2730) 2-75 11-77 Comp 1 9200 8300 Install Reactor Pressure Vessel (00 Site) (2411-5310) 11-75 1-76 Comp 1.
l" 8205 8230 Install Recirculating Pump (2412-5110) 9-75 12-78 Comp 1.
8210 8325 Install Main Steam Lines to MSIV 9-75 3-77 Compl.
l 8215 8465 Install Control Rod Drive System (2414)(2684) 7-75 4-79 Comp 1.
8220 8440 Install Reactor Internals (2411-5610) 10-75 4-79 Comp 1.
8245 8335 Install Reactor Clean-Up System _ Pipe, Fittings & Valves (2643-6540,6640) 2-76 10-78 Compl.
8270 8360 Install RHR Pipe, Fittings and Valves (2646-6540) 10-75 10-78 Compl.
B275 8470 Install Cooling Water Pipes and Controls (2621) (WS SYS) 11-72 1-81 Comp 1, l
9200 C605 Install Radioactive Waste System and Radiation Monitoring System (2682)(2686)(2683)(2387)(2685) 11-75 3-81 Compl.
l B300 8450 Install Piping Conne'cted to Primary System Components (2640) 10-75 5-79 Compl.
l B305 8475 InstallPipdHangersandRestraintsAllSystems(XXXX-6550,6450.6650.6750,2213.3910) 3-75 6-8 2 Est.
92%
f B310 8315 Install Main Steam Pipe to Turbine Stop Valve (2631) L8 Pipe 4-75 5-1-77 Compl.
l B450 8500 Initial Flush of Systems (XXXX.6890) 12-76 6-81 Comp 1.
B500 8515 Perform Reactor Cold Hydrostatic Test 5-78 7-78 Comp 1.
B515 8600 Complete Base Line Inspections CG&E 3-78 7-8 2 Est.
95%
i p
/
t
.3 6
refs O, p Activity Activity Est.
t-J Nurb7rs (Description & Acc:unt Numb",rs)
Started
'Compitte Status.
I 8600 8700 Perform Lean Rate Test CG&E 3-32 Est.
3 -12 Est.
0%
6-82 Est.
6-82 Est.
07 a
8605 8615 Test Radioactive System and Radiation Monitoring System 5-82 Est.
5-82 Est.
0%
f 8700 8800 Integrated System Test 8-79 9-79 Compt.
8740 8815 Special Nuclear Material Delivered 7-82 Est.
7-82 Est.
0%
a 8800 8950 Applicant Suomits Test Results 7-82 Est.
11-82 Est.
01 8950 8990 Power Ascension 0