Forwards IE Insp Rept 50-334/81-20 on 810804-0907 & Notice of Violation
ML20031G024
Person / Time
Site: Beaver Valley
Issue date: 10/02/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20031G025 List:
References
NUDOCS 8110200656
Download: ML20031G024 (2)


See also: IR 05000334/1981020

Text

_ _ _ _ _ _ _ _ .

._

_-

_ _ _ _ _ _ _ _ _ _ _ _ - - _ -

i

OCT 2

1981

Docket No. 50-334

$ '\\ $ d 4

\\

Duodesne Light Company

ATTN: Mr. J. J. Carey

h

(

N

l

Vice President

$

OL

Nuclear Division

d

g "0CIl 6 Jggyg

2

.

Post Office Eox 4

7

d. g pw

C

Shippingport, Pennsylvania

15077

i

A

/-3

Gentlemen:

V'

'

Subject:

Inspection 50-334/81-20

f

This refers to the routiae safety inspection conducted by Mr. D. A. Beckman of

this office on August. 4 - September 7,1981 at the Beaver Valley Power Station,

Unit 1, Shippingport, Pennsylvania of activities authorized by NRC License No.

DPR-66 and to the discussions of our findings held by Mr. Beckman with Messrs.

'

W. S. Lacey and K. D. Grada of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Based on the results of this inspection, it appears that certain of your activi-

ties were not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed barewith as Appendix A.

These items of

noncompliance have been cateqorized into the levels described in the Federal

Register Notice (45 FR 66754) dated October 7,1980.

You are required to

respond to this letter and in preparing your response, you should follow the

instructions in Appendix A.

In accordance with 10 CFR 2.790 of the Conaission's regulations, a copy of this

letter and the enclosures will be placed in the NRC's Public Document Room.

If

this report contains any information that you (or your contractors) believe to

be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a)

notify this office by telephone within ten (10) days from the date of this let-

ter of your intention to file a request for withholding; and (b) submit within

25 days from the date of this letter a written application to this office to

withhold such information. Consistent with Section 2.790(b)(1), any such appli-

cr' ion nust be accompanied by an affidavit executed by the owner of the informa-

twn which identifies the document or part sought to be withheld, and which con-

tains a full statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section further

RI:DRPI

RI:DRPI

RI:D

P. P

e,k

Beckman/meo

Greenman

-K

m

0;[

9fE9/81

gh

./

wis in

~.

.

0FFICIAL RECORD COPY

I

8110200656 811002

5i

'

PDR ADOCK 05000334

O

PDR

4~

i

'

-

-

_ _ _ _ _ _ . _ _ _ _ _ _ _ _ _

__

_

'

i; .

1.,

Duquesne Light Company

2

requires the statement to address with specificity the considerations listed in

10CFR2.790(b)(4). The infomation sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not hear from

^

. you in this regard within the specified periods noted above, the report will be

placed in the Public Document Room. The telephone notification of your intent

to request withholding, or any request for an extension of the 10 day period

which you believe necessary, should be made to the Supervisor, Files Hail and

Records, USiiRC Region I, at (215) 337-5223.

Should you have any questions concerning this inspection, we will be cleased to

discuss them with you.

Sincerely,

Original sigued By:

j

,

bbbWg

R. R. Keimig, Chief

Projects Branch #2, Division of

Resident and Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

.

2.

Office of Inspection and Enforcement Inspection

Report Number 50-334/81-20

cc w/encls:

F. Bissert, Manager, Nuclear Support Services

R. Washabaugh, QA Manager

Station Superintendent

General Superintendent, Power Stations Department

P,. Martin, Nuclear Engineer

J. Sieber, Manager, Nuclear Safety and Licensing

T. D. Jones, flanager, iluclear. Operations

R. M. Hafrice, Nuclear Engineer

H. R. Tonet, Manager, Nuclear Engineering

PublicDocumentRoom(PDR)

Local Public Document Room (LPDR)

Huclear Safety Infomation Center (NSIC)

NRC Resident Inspector

Comonwealth of Pennsylvania