ML20031F618

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1981
ML20031F618
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/06/1981
From: Culver M
FLORIDA POWER CORP.
To:
Shared Package
ML20031F616 List:
References
NUDOCS 8110200222
Download: ML20031F618 (4)


Text

-

OPERATING DATA REPORT 50-302 l

DOCKET NO.

DATE 10/6/81 CONIPLETED llY M. W. Culver TELEP110NE (904) 795-6486 OPERATING STATUS I

Crystal River Unit 3 Notes

1. Unit Name:

9/1/81-9/30/81

2. Reporting Period:
3. Licensed 1hennal Power (SIWI):

2452 890

4. Nameplate Rating (Gross alWel:
5. Design Electrical Rating (Net SIWE):

825 l

6. Stasimum Dependable Capacity (Gross 31We): 821 70
7. Alasimum Dependable Capacity (Net SIWE):

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise' Reasons:

N/A l

l

9. Power Lesel To Which Restricted,if Ani(Net.\\1We): None

' N/A

10. Reasons For Restrictions.lf Any:

l I

Tl is.\\lonth Yr.. o.Date Cumulatise iI. Ilours la Reporting Period 720 6551 39911

12. Number Of liours Reaoor has Critical 653.6 5079.05 24963.56 0

80.0 1209.22

13. Reactor Resene Shutdown flours
14. Ilours Generator On-Line 6TO.6 5023.1 24388.48
15. Unit Resene Shutdown lioun 0

0 0

16. Gross Thermal Energy Generated (51Will 1581611 11782893.3 54461303
17. Gross Electrical Energy Generated (SihlD 535335 3984489.2 18488420
n. Net Electrical Energy Generated IN1Will 509477 378 869 17534439 l
19. Unit Senice Factor 90.36%

7 6.68%

61.11%

20. Unit Asailability ractor 90.36%

76.68%

61.11%

I

21. Unit Capacity I actor (Using.\\lDC Neti 90.49%

.73.96%

56.18%

22. Unit Capacity I' actor iUsing DER Neti 85.77%

70.10%

53.25%

23. Unit forced Outage Rate 0.0%

17.29%

26.85%

24. Shuulowns Scheduled Oser Nest h Slonths iI.s pe. Date.and Duration of Each1:

Refueling outage that started 9/28/81 and estimated to last 11 weeks.

25. If Shut Down At I:nd Of Report Period. Intimated Date of Startup:

12/7/81

26. L*mts in f est Status iPrior to Cun.mercial Operation L Iorecast Achiesed INill st o nillCAtIn 1/14/77 INIII \\l. I:LI C I RIrli Y 1/30/77 CO\\l%II Rcl \\ L OPI R \\ llON 3/13/77 8110200222 81101dI p,f 77 3 PDR ADOCK 05000302 R

PDR.

t

m.

4 AVERAGE DTILY UNIT POWER LEVEL i

DOCKET No.

50-302 UNIT FLCRP-3 10/6/81 DATE CO\\lPLETED BY M.W. Culver o

TELEPHONE (904)795-6486 September 1981 Sf0NT){

DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL l.\\lWe-Net i IMWe-Net i I

797 790 1

37 2_

756 18 743 3

697 19 793 i

j 790 4

20 790 788 800 5

yg 4

6 788 22 746 7

788 23 793 8

785 2-1 797 9

7R9 25 704 10 781 26 805 784 27 786 j

12 779 2s 28 l

13 787 0

29 i

I 14 788 30 0

i 15 783 3;

16 737 INSTRUCTIONS i

On th:s tornnt. !nt the serage daily urut p,wer lesel in MWe-Net l'or each day in the repmting inonth. Onnpute to the nearest whole mepwat:

i.

("'77 )

t I

t

,,e-m -, - - _. _,

.c.

..,,,,-r,,-.,-.

,,.v.,,,,,.y.,

_,--.___,,_._..,..,.~.-m v.

.~

+

O A

i UNIT SlilliDOWNS AND POWER REDUCilONS DOCK ET NO.

50-302 I,

UNIINAME FLCRP-3 DATE _1016181 l

COMPLETED 11Y M,u_

rnivm-

}

REPOR T MONTil _lep tem 1.cr_.1981 1ELEPilONE _(904)795-6486 i

1 E

E 6

[ ?.

" [:

4 E5 I icensee

,g-r, y~t Cause & Cor reciive b

ible ti ?

4 iE$

ikent 77

! 'j c

Attnin to 4

M Report #

vT 0

~hy:2 Psesent Res ursem e u

81-50 810902 S

0 B

9 N/A HC HTEXCH Reduced power to clean waterboxes i

B and D.

81-51 810928 S

69.4 C

1 N/A 33 33333B Scheduled refueling outage, i

4 l

I 2

3 4

4 I: Forced Reason:

Method:

Exhibit G - Instructions i

S: Sthe, aled A Equipment Failure (Explain) 1 Manual for Picparation of Data It Maintenance of Test 2 Manual Scram.

Entr> Sheets for Licemee C Refueling 3 Automat.c Seram.

Event Report (LER) Eile (NllRI G-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination I' Admin..:rative 5

G-Operational Eirar (Explain)

Exhibit I Same Source Pl/77) 11-01her ( E splain )

o MONTHLY OPERATIONAL SU> DIARY STATEMENT DOCKET NO.

50-302 UNIT FLCRP-3 DATF 10/6/81 COMPLETED BY M.W. Culver TELEPHONE (904)795-6486 MONTH September 1981 SU1D!ARY STATEMENT:

The unit operated with only one power reduction until the 28th, at which time it shutdown for refueling.

l 9

-_ _