ML20031F618
| ML20031F618 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/06/1981 |
| From: | Culver M FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20031F616 | List: |
| References | |
| NUDOCS 8110200222 | |
| Download: ML20031F618 (4) | |
Text
-
OPERATING DATA REPORT 50-302 l
DOCKET NO.
DATE 10/6/81 CONIPLETED llY M. W. Culver TELEP110NE (904) 795-6486 OPERATING STATUS I
Crystal River Unit 3 Notes
- 1. Unit Name:
9/1/81-9/30/81
- 2. Reporting Period:
- 3. Licensed 1hennal Power (SIWI):
2452 890
- 4. Nameplate Rating (Gross alWel:
- 5. Design Electrical Rating (Net SIWE):
825 l
- 6. Stasimum Dependable Capacity (Gross 31We): 821 70
- 7. Alasimum Dependable Capacity (Net SIWE):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise' Reasons:
N/A l
l
- 9. Power Lesel To Which Restricted,if Ani(Net.\\1We): None
' N/A
- 10. Reasons For Restrictions.lf Any:
l I
Tl is.\\lonth Yr.. o.Date Cumulatise iI. Ilours la Reporting Period 720 6551 39911
- 12. Number Of liours Reaoor has Critical 653.6 5079.05 24963.56 0
80.0 1209.22
- 13. Reactor Resene Shutdown flours
- 14. Ilours Generator On-Line 6TO.6 5023.1 24388.48
- 15. Unit Resene Shutdown lioun 0
0 0
- 16. Gross Thermal Energy Generated (51Will 1581611 11782893.3 54461303
- 17. Gross Electrical Energy Generated (SihlD 535335 3984489.2 18488420
- n. Net Electrical Energy Generated IN1Will 509477 378 869 17534439 l
- 19. Unit Senice Factor 90.36%
7 6.68%
61.11%
- 20. Unit Asailability ractor 90.36%
76.68%
61.11%
I
- 21. Unit Capacity I actor (Using.\\lDC Neti 90.49%
.73.96%
56.18%
- 22. Unit Capacity I' actor iUsing DER Neti 85.77%
70.10%
53.25%
- 23. Unit forced Outage Rate 0.0%
17.29%
26.85%
- 24. Shuulowns Scheduled Oser Nest h Slonths iI.s pe. Date.and Duration of Each1:
Refueling outage that started 9/28/81 and estimated to last 11 weeks.
- 25. If Shut Down At I:nd Of Report Period. Intimated Date of Startup:
12/7/81
- 26. L*mts in f est Status iPrior to Cun.mercial Operation L Iorecast Achiesed INill st o nillCAtIn 1/14/77 INIII \\l. I:LI C I RIrli Y 1/30/77 CO\\l%II Rcl \\ L OPI R \\ llON 3/13/77 8110200222 81101dI p,f 77 3 PDR ADOCK 05000302 R
PDR.
t
m.
4 AVERAGE DTILY UNIT POWER LEVEL i
DOCKET No.
50-302 UNIT FLCRP-3 10/6/81 DATE CO\\lPLETED BY M.W. Culver o
TELEPHONE (904)795-6486 September 1981 Sf0NT){
DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL l.\\lWe-Net i IMWe-Net i I
797 790 1
37 2_
756 18 743 3
697 19 793 i
j 790 4
20 790 788 800 5
yg 4
6 788 22 746 7
788 23 793 8
785 2-1 797 9
7R9 25 704 10 781 26 805 784 27 786 j
12 779 2s 28 l
13 787 0
29 i
I 14 788 30 0
i 15 783 3;
16 737 INSTRUCTIONS i
On th:s tornnt. !nt the serage daily urut p,wer lesel in MWe-Net l'or each day in the repmting inonth. Onnpute to the nearest whole mepwat:
i.
("'77 )
t I
t
,,e-m -, - - _. _,
.c.
..,,,,-r,,-.,-.
,,.v.,,,,,.y.,
_,--.___,,_._..,..,.~.-m v.
.~
+
O A
i UNIT SlilliDOWNS AND POWER REDUCilONS DOCK ET NO.
50-302 I,
UNIINAME FLCRP-3 DATE _1016181 l
COMPLETED 11Y M,u_
rnivm-
}
REPOR T MONTil _lep tem 1.cr_.1981 1ELEPilONE _(904)795-6486 i
1 E
E 6
[ ?.
" [:
4 E5 I icensee
,g-r, y~t Cause & Cor reciive b
ible ti ?
4 iE$
ikent 77
! 'j c
Attnin to 4
M Report #
vT 0
~hy:2 Psesent Res ursem e u
81-50 810902 S
0 B
9 N/A HC HTEXCH Reduced power to clean waterboxes i
B and D.
81-51 810928 S
69.4 C
1 N/A 33 33333B Scheduled refueling outage, i
4 l
I 2
3 4
4 I: Forced Reason:
Method:
Exhibit G - Instructions i
S: Sthe, aled A Equipment Failure (Explain) 1 Manual for Picparation of Data It Maintenance of Test 2 Manual Scram.
Entr> Sheets for Licemee C Refueling 3 Automat.c Seram.
Event Report (LER) Eile (NllRI G-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination I' Admin..:rative 5
G-Operational Eirar (Explain)
Exhibit I Same Source Pl/77) 11-01her ( E splain )
o MONTHLY OPERATIONAL SU> DIARY STATEMENT DOCKET NO.
50-302 UNIT FLCRP-3 DATF 10/6/81 COMPLETED BY M.W. Culver TELEPHONE (904)795-6486 MONTH September 1981 SU1D!ARY STATEMENT:
The unit operated with only one power reduction until the 28th, at which time it shutdown for refueling.
l 9
-_ _