1 Docket No. 50-293 06 0CT 1981 Boston Edison Company M/C Nuclear lYi. 4 s
uci$rbpra ns Support Manager ff
/
N A 'C \\
800 Boylston Street
.c Ocn 0 u
Boston, Massachusetts 02199 g
'2 1987w -
t n,s,kf,75
{6 Gentlemen:
y J
Subject:
Meeting Summary
.x
- v This refers to the meeting held at your office in Boston, ' as e tf on M
September 11, 1981. This meeting was related to environmental monitoring ac-tivities to be conducted by the Commonwealth of Massachusetts at your Pilgrim Nuclear Power Station under a Nuclear Regulatory Commission contract.
A list of attendees and the subject discussed'at this meeting are included in the Office of Inspection and Enforcement Meeting Summary which is enclosed with this letter.
In our opinion this meeting was beneficial ano provided useful information to all parties.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed report will be placed in the NRC's Public Document Room.
No reply to this letter is required; however, should you have any questions concerning this matter, we will be pleased to discuss them with you.
Sincerely, Original Signed By:
Ronald C. Haynes Director h(
4
Enclosure:
As Stated y
cc w/ encl:
/ [
R. D. Machon, Nuclear Operations Manager - Pilgrim Station Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Massachusetts (2)
L. Cohen, IE:HO R. Hallisey, Massachusetts Dept. of Public Health I:DEPOS
- DEPOS RI:DEP -
- OS P
RI:
D}Q
' nSrtar, RD{
Sn I,t x
ttan:hh
/) ores ostecki All rvHavnes go 1/
///
1 o/(
M/
9/30/81 F110200150 911006 0FFICL ECORD COPY PDR ADOCK 05000293 P
,__.._.__PDR
o Boston Edison Company M/C Nuclear 2
0 6 0CT 1981 bec w/ enc 1:
Region I Docket Room (with concurrences)
OFFICIAL RECORD COPY
4 A
License No. DPR-35 Docket No. 50-293 Licensee:
Boston Edison Company Facility:
Pilgrim Nuclear Power Station
SUMMARY
OF THE INDEPENDENT MEASUREMENTS CONTRACT MEETING WITH THE COMMONWEALTH OF MASSACHUSETTS AND BOSTON EDISON COMPANY On September 11, 1981, representatives of the Radiation Control Program of the Commonwealth of Massachusetts Department of Public Health, the NRC, and Bc> ton Edison Company who are responsible for the environmental monitoring program at the Pilgrim facility met at the Boston Edison Company office in Boston, Mass-achusetts. The attendance list is attached as Aopendix A to this summary. The purpose of the meeting, called at the NRC's request, was to review the imple-mentation of the NRC's contract with the Commonwealth of Massachusetts that provides for the independent measurement of radioactivity in the environment around selected NRC licensed facilities.
Boston Edison Company's facility at Plymouth, Massachusetts is included under the terms of this contract.
After stating the purpose of the meeting, a copy of the contract sampling and analysis program was given to the Caston Edison Company representatives.
The provisions of the contract were reviewed and discussed. The,e provisions include:
independent verification measurements and their place in the WRC inspection program; the role of the State and the NRC Regional Office in the program; and the use of the Department of Energy Radiological and Environmental Services Laboratory to perform the analyses until the state laboratory is operational. The availability of the data to the public was noted, and reporting requirements wers revievad.
The specific details of the sampling program will be discussed and resolved by the state and the licensee.
In addition the state and the licensee will make provisions for the routine exchange of data.
Q.s M/aA J. J. Kottan Radiation Laboratory Specialist P
.t J
APPENDIX A Attendance at the Condonwealth of Massachusetts, Boston Edison Company and NRC meeting in Boston, Massachusetts on September 11, 1981.
Commonwealth of Massachusetts Department of Public Health, Radiation Control Program R. M. Hallisey, Radiation Control Program Director G. Swible, Radiation Scientist Division of Marine Fisheries C. Sheehan, Marine Fisheries Biologist
(
Boston Edison Comoany E. Casali, Engineer D. Staubor, Technician i
J. Keyes, Senior Licensing Engineer C. Bowman, Senior Radiological Engineer R. A. Mellor, Senior Radiochemist (Yankee Atomic Electric Company, Environmental Laboratory)
Nuclear Regulatory Commission J. C. Jang, Radiation Specialist
- J. J. Kottan, Radiation Laboratory Specialist i
?
l
{
i l
i t
i i
1 e
as.-e-
=ve
.-+=-w w.#,--wr.w,.
sw*
w~-
e-e-
, w e w,-
r-ew - w
-n
-,-w,v~.
,me....,-es-sr-,,
e--e - -rm -e,w w w
. w w+ w=.