ML20031D292

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-266/81-15 & 50-301/81-17 on 810803-31.No Noncompliance Noted
ML20031D292
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/25/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20031D293 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8110130218
Download: ML20031D292 (2)


See also: IR 05000266/1981015

Text

- -

-

---. -_

- _ -

.

.

= _ _ _

-

-

--

d

I

.

1

i

SEP 9 5 M.

I

a

e

t- J% /,b

4

Docket No. 50-266

\\

y

Docket No. 50-301

f/

'

I

Wisconsin Electric Power Company

~

I

T

-

ATTN:

Mr. Sol Burstein

t

0 0T 9 iga; m 11

'

,

Executive Vice President

a v.sh ruam .

i

. , a,

" ' " "

~

Power Plants

p,

r

[,N8/

231 West Michigan

Milwaukee, WI 53201

Gentlemen:

This refers to the routine safety insrection conducted by Messrs. P. G. Guldemond

i

and R. L. Hague of this office on August 3-31, 1981, of activities at Point Beach

I

Nuclear Plant, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-24 and

No.DPR-27 and tc the discussion of our findings with Mr. G. A. Reed at the con-

'

clusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during the

inspect ion. Within these areas, the inspection consisted of a selective examina-

tion of procedures and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requiremente were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

.

,

Public Document Room.

If this report contains any information that you or

)

your contractors beliue to be exempt from disclosure under 10 CFR 9.5(a)(4),

1

it is necessary that you (a) notify this office by telephone within seven (7)

i-

days from the date of this letter of your intention to file a request for

!

withholding; and (b) submit within twenty-five (25) days from the date of this

letter a written application to this office to withhold such information.

Section 2.790(b)(1) requires that any such application must be accompanied by

'

an affidavit executed by the owner of the information which identifies the

document or part sought to be withheld, and which contains a full statement of

the reasons which are the bares for the claim that the information should be

withheld from public discloaure. This section further requires the statement

I

V

'

6t l

8110130218 810925

L

PDR ADOCK 05000266

G

PDR.

.

. , - ~ - , - -

. - . - - - - . - - , . - - . - - _ _ . . - -.

. - , - . . - - - - -

. - ,

. . -

.

.

Wisconsin Electric Power

-2-

September 25, 1981

Company

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, a copy cf this letter and the

enclosed inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

rO /

)

n

m.

-qps.. % - L

R. L. Spessard, Director

Division of Resident and Project

Inspection

Enclosure:

IE Inspection

Reports No. 50-266/81-15

and No. 50-301/81-17

cc w/ enc 1:

G. A. Reed, Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Inspector

Peter Anderson, Wisconsin's

Environmental Decade

Stanley York, Chairman

Public Service Commission

l

l

i

l

RIII

RIII

RIII

RII:I

ARW

DA%-//

/

t

Sheosp/

d

!

Culdemond/so

' ,s/Konklin

S petgr

9/21/81

/24/S!

y/1

-

-

- - -

-

- -

- - - -

- -

- -

-

- -

-

- - - -

- -

- - -

-