ML20031D214
| ML20031D214 | |
| Person / Time | |
|---|---|
| Site: | Marble Hill |
| Issue date: | 09/24/1981 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Shields S PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA |
| Shared Package | |
| ML20031D216 | List: |
| References | |
| NUDOCS 8110130131 | |
| Download: ML20031D214 (2) | |
See also: IR 05000546/1981016
Text
h tl H/;n ns
'
-
/
.
.
SEP 2 41981
TI I $
s
sO
'
P
'A
Docket No. 50-546
9
K
Docket No. 50-547
w
ggB1w
'.
p rest .
-
,
c, _
.
u s.[* ecd A(18f
Public Service of Indiana
ATTN:
Mr. S. W. Shields
Senior Vice President
%
y
'g g
Nuclear Division
Post Office Box 190
New Washington, IN 47162
Gentlemen:
This refers to the routine safety inspection conducted by Mr. J. J. Harrison
of this office on August 1-31, 1981, of activities at Marble Hill Nuclear
Generating Station, Units 1 and 2, authorized by NRC Construction Permits
No. CPPR-170 and No. CPPR-171 and to the discussion of our findings with
Messrs. Petro, Ramsett, and others of your staff at the conclusion of the
inspection.
The enclosed copy of our insnection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures ar"! representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection tiport will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
$
Cy
0110130131 010924
PDR ADOCK 05000546
G
- _ - _ _ _ _ _ _ _
_ _ _
f.
_ _ _ .
-
.
.
.
Public Service of Indiana
-2-
SEP 2 41961
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
mation. Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies th<. document or part sought to be withheld, and which contains
a full statem-at of the reasons which are the bases for the claim that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
in
~.0 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear from you in this regard within the specified periods noted
above, a copy of this letter and the enclosed inspection report will be
placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
&,,
wr-> dW
<
R. L. Spessard, Director
Division of Resident and
Project Inspection
Enclosure:
IE Inspection
Reports No. 50-546/81-16
and No. 50-547/81-16
cc w/ encl:
W. M. Petro, Executive Director
Nuclear Project Management
C. Kammerer, CA
J. H. Sniezek, IE
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
LeBoeuf,-Lamb, Leiby & MacRae
Dave Martin, Office of
Attorney General
John R. Galloway, Staff Director,
Environment, Energy and Natural
Resources Subcommittee
E. P. Martin, Wabash Valley
Power Association
RII
RII
C [I
RIII
I
ONd
1
J
s
rison/jp
Schweibinz
e
K
Spe's ard
a
A/23/81
7 ,P/Jf (
JTRCeTC4
y
%
'
.