Forwards IE Insp Rept 50-333/81-18 on 810801-31 & Notice of Violation
ML20031D138
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/24/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Leonard J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20011A406 List:
References
NUDOCS 8110090391
Download: ML20031D138 (3)


See also: IR 05000333/1981018

Text

n

,

m

w

-

.

.

.

-

-

'-

,

"-

-[ [k *

-y ;,

_

,

.

3-

,

.'

L

' f.

s

,

,

..-

.m

,

' '

'.

<>

g.

,

-

A

Y .;

'y-

,

, g.

,

,,

-

a.

,

y

.9*,

-

tw

.

.

-

.

-

.

'

'

~

'

s

-

,

,

,

'&

'

, ~

,

u

'

&

'

'

e

, , . ,

\\

r

'

' s

+

~

SEP 2 4.1% -

ep.jj'g

.

D

~

~'

'

? ocket No. 50-333

9

.

-

l"

'

. f[

,'

'

,

$ Power [ Authority of the State.of New York

'

g.

  • ' James A.' FitzPatrick Nuclear Power Plant

M 0CT 819816 El

'

'

ATTN: Mr. J. D. Leonard, Jr..

N $5 'L%7%'*" f'

Resident Manager

D

u yyp

^

. ..

P.-OL Box 41-

1.

%

Q,

, N

Lycoming, New York

13093.

1

Gentlemen:

o

1

-

,

Subject: -Inspection 50-333/81-18

This mfers to the routine, safety inspection' conducted by Mr. J. Linville of

,

.

this office on: August 1-31, 1981 of activities authorized by MRC License.No.

DPR-59 'a~nd to the discussions of our findings held by Mr. Linville with

,

i

yourself and other members of your staff at the. conclusion of the . inspection.-

Areas examined during this inspection are described in the Office of Inspection

-

and Enforcement Inspection Report which is enclosed.with this letter. Within

' these areas, the' inspection consisted of selective examinations of procedures

'

~ and representative records, interviews with personnel, and observations by the

,

insnector.

-

.

Cur' inspector also verified the steps you have taken to correct the items of

P

noncompliance brought to your attention in r letter dated April 8,.1981. We

<

have no. further questjons regarding your action' at this time.

'

Based on the results of this inspection, it appears that' certain of your-

activities were not conducted in full compliance with HRC requirements, as

,

!

set forth in the Notice of Violation, enclosed herewith as Appendix A.

These

{

items of noncompliance have been cate

Federal Register Notice (45 FR 66754)gorized into the levels describe 4 in the

'

-

i

dated October 7,1980. You are required

,

i

to respond to-this letter and in preparing your response, you should follow

l.

the instructions in Appendix A.

,

Item 8 in the Notice of Violation endlosed with this letter was identified

during a previous inspection of ycur licensed activities on May 18, 1981,

'

and was documented in the enclog,ure to our letter dated July 6,1981. Your

c,.

.

letter to'this office dcted July 31, 1981 stated that in addition to routine

,

radiation protection training given to radi'ation worker.: to ensure high

radiation area gates are closed and locked, Radiological and Environne'ntal

i

Services' Technicians conduct routine rounds to inspect these gates twice

'

-

t

@

.

-

-

%

9t

-

[1RI:JCL:DRPI

RI:HBK:DRPI

RI:

B:DRPI,

g; Col

T

d'

S

di

1

.

.

,

&

8110090391 810924

j

PDR ADOCK 05000333

.

i

G

pop

-

.

-.

s.

.

- - - . - . -

-

.

- .. . -- - - .

__

-

.

-

.

SEP 2 41981

, Power Authority of the State

2

-

,

.

.of New York-

i%~ ~

,

,

p

daily and report problems.to the Shift Supervisor. From our August 1981

9

N oection it appears that the stated corrective actions were not effective

!"

  • his item has recurred. Recurrent and uncorrected items of noncompliance

J

Hditional weight in the consideration and selection of appropriate

J

Mon.' Therefore, in your response to this letter, you should

i

4r, attention to those actions taken or planned to ensure that

ams of noncompliance will be completely corrected and will not

a with 10 CFR 2.790 of the Cormiission's regulations, a copy of

and_ the enclosures will be placed in the ftDC s Public Document

iis report contains any_information that you or your contractors)

.

se exempt from disclosere under 10 CFR 9.5(a) 4), it is necessary

-

) notify this office by telephone within ten 10) days fror,the

s letter of your intention to file a request for withholding; and

within 25 days from the date of this letter a written application

ice to withhold such information. Consistentwithsection2.790(b)(1),

plication must be accompanied by an affidav$t executed by the owner -

rmation which identifies the document or part sought to be withheldf

ontains a full statement of the reasons on the basis which it is

.t the infonnation should be withheld from public disclosure. This

ther requires the statement to address with specificity the consid-

,

stedin10CFR2.790(b)(4). The information sought to be withheld

teorporated as far as possible into a separate part of the affidavit.

>t hear from you in this regard within the specified periods noted

i

report will be placed in the Public Document Ronm. The telephone

n of your intent to request withholding, or any request for an

f the 1,0 day period which you believe necessary, should be nade to

s .. . _

the Supervisor, Files, Ifail and Records, US!;RC Region I, at (215) 337-0223.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

-

Sincerely,

,

original signedDIM k

/dP "M

Eldon J. Brunner, Chief, Projects

Branch 41, Division of Resident

and Project Inspection

Enclosures:

1.

Appendix A,llotice of Violation

",

2.

Office of Inspection and Enforcement

a

Inspection Report IJumber 81-18

e

-

r

-- ., --

-_

,c._

- ,-

.

- - - ..- .

'-

,

.

.

.

,

.

c,

(,

"

,

,

'

E

SEP 2 41981

'

Power Authority of tne State

3-

_ .,

of New York ~

,

F

cc'w/ enc 1:

George T. Berry, President' and Chief Operating Officer

s

-

'J. P..Dayne,-Senior Vice President-Nuclear Generation

~

A. Klausmann,- Director, Quality Assurance

- M. C. Cosgrove, Site Quality Assurance Engineer

1

.J..F. Davis, Chairman, Safety Review Committee

y

C. H. Pratt, Assistant General- Counsel

G. M. Wilverding,' Manager-Nuclear Licensing -

PublicDocumentRoom(PDR)

-

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

""

State of New. York

.

bec w/ enc 1:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

..

?

@

s

&

+

5