OPERATING DATA REPORT DOCKET NO. 50-155 DATE 2/7/80 COMPLETED BY NHimebauch TELEPHONE ^16 m ^537 x 180 I
OPERATING STATUS Notn
- 1. Unit Name:
Bic Rock Pnin e-we.t ow o1-n, Correction of l'.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />
- 2. Reporting Period: Januarv 1080 made on scheduled outage
- 3. Licensed Thermal Power (MWt):
240 75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br /> for December 1975
- 4. Nameplate Rating (Gross MWe):
72
- 5. Design Electrical Rating (Net MWe):
per conversation with 67 PRoss.
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable O --ity (Net MWe):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
MDC decreased from 65 MWE to 63 MWF on 1/23/80 due to fuel thermal hydraulic limit margins.
63
- 9. Power Level To which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
Fuel Thermal Hydraulic Limits This Month Yr to.Date Cumulative 744.0 744.0 147677.0 1
- 11. Hours In Reporting Period 422.2 422.2 100555.2
- 12. Number Of Hours Reactor Was Critical 0
0 0
'13. Reactor Reserve Shutdown Hours 409.5 409.5 98408.4
- 14. Hours Generator on Line 0
0 0
- 15. Unit Reserve Shutdown Hours 81035.2 81035.2 lo196966.4
- 16. Gross Thermal Energy Generated (MWH) 24714.0 24714.0 5760631.0 j
- 17. Gross Electrical Energy Generated (MWH) 23268.0 23268.0 5451607.2
- 18. Net Electrical Energy Generated (MWH) 55.0%
55.0%
66.6%
- 19. Unit Service Factor 55.0%
55.0%
66.6%
- 20. Unit Availability Factor 05*55 00*5A 50 5A
- 21. Unit Capacity Factor (Using MDC Net) 43.4%
43.4%
51.3%
- 22. Unit Capacity Factor (Using DER Net) 8.7%
8.7%
25.7%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each1:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status IPrior to Commercial Operationi:
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIA L OPER ATION
(
(9/77)
DR k gK 05000155 36 800208 R
\\
i i
- 19. UNIT SERVICE FACTOR. Compute by dividing hours the generator was on line titem 14) by the gross hours in the reportmg penod (item 11). ' Express as percent to the nearest tenth of a percent. Do not include reserve shut-down hoursin the calculation.
i l
- 20. UNIT AVAILABILITY FACTOR. Compute by dividing the unit available hours (item 14 plus item 15) by the gross hours in the reporting penod (item I!). Express as percent to the nearest tenth of a percent.
- 21. UNIT CAPACITY FACTOR (USING MDC NET). Com-pute by dividing net electncal energy generated (item IS) by the product of maximum dependable capacity (item
- 7) times the grcss hours in the reporting penod (item i1).
Express as percent to the nearest tenth of a percent.
- 20. UNIT CAPACITY FACTOR (USING DER NET). Com-pute as in item 21. substituting design electrical rating (item 5) for maximum dependable capacity.
- 23. UNIT FORCED OUTAGE RATE. Compute by dividing the total forced outage hours (from the table in Unit Shutdowns and Power Reductions) by the sum of hours generator on line (item 14) plus total forced octage hours (from the table in Unit Shutdowns and Power Reductions).
Express as percent to the nearest tenth of a percent.
- 24. SHLTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH). Include typ (refueling. maintenance, other), proposed date of start of shutdown and proposed length of shutdown.
It :s recognized that shutdowns may be schedu!ed between repotts and that this item may not be allinclusive. Be as accurate as possible as of the date the report is prepared.
This item is to be prepared each month and updated if appropnate until the actual shutdown occurs.
- 25. Self<xplanatory.
!6. Self. explanatory. Note, however, that this information is requested for all units m startup and power ascension test status and is not required for umts already in com-mercial operation.
TEST STATUS is defined as that pened following mi-tial enticality dunng which the unit is tested at succes-sively higher outputs, eu!mmatmg with operation at full power for a sustamed pened and completion of war-ranty suns. Fol!owmg this phase, the umt is generally considered by the utility to be available for commercial operation.
Date ot' COMMERCIAL OPERATION is defined as the date that the unit was declared by the utility owner to be available for the regular production of electneity, usually reisted to.the satisfactory completion of quali.
rication tests as specified in the purchase contract and to the accountmg policies and practices of the utility.
i 6
s
AVERAGE DAILY UNIT POWER LEVEL t
DOCKET NO.
50-155 UNIT - Big Rock Point 2/7/80 DATE GHimebauch t
COMPLETED SY 616-547-6537 x180 TELEPHONE MONTH January 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Nec1 0
58 1
la IS 55 3
19 60 61 20 60 I
- )
1 61 6
22 61 7
23 61 8
,4 61 9
25 61 26 10 61 II
~'
t 61 28
~
60 13 0
29 61 I4 30 24 61 15 3
30 16 INSTRUCTIONS On this format. list the 2serage daily umt power lesel an MWe Net for each day m the reporting month. Compute to the nearest whole megawatt.
(4817 7 6 a
)
p w
,,,.-.-,--e
,.e
,y
,e,
--ore,
,,e
,e
~,
,.v,e y,
e 50-155 DOCKET NO.
UNIT SilUIDOWNS AND POWER REI)UC110NS UNIT NAME Ble Rock Point Plant -
DATE 2/7/80 COMPLETED BY Gilimehauch REPORT MON fig January 1980 TELEPilONE 616-547-65'17 x 180 m
t l
E E
) s$5
$3 h
Liccusee
[4, Cause & Corrective f
5 Event p
pV Attism to N...
Date g
3g
(
Pievent Recunence 35 5
jgg Repostsa mu r-g 6
1 12/31/79-1/.13/80 S
295.7 0
1 NA IB INSTRU Regulatory Shutdown to' implement SD XXXXXX requirements of NUREG-0578.
BA INSTRU A
1/13/80 F
3.7 A
3 NA IB INSTRU A failure of intermediate. power range monitor - shutdown B
1/13/80 F
4.5 A
3 NA IB INSTRU B failure of intermediate power range monitor - shutdown 15.2 C
1/13/80 -
F 11 3
UA IA INST'atU C intermediate power range monitor 1/14/80 trip on period due to prompt ef fect shutdown 15.4 2.
1/15/80 -
F A
3 NA CC INSTRU
- 2. Intermediate pressure regulator 1 allure 1/16/80 shutdown 3.
1/18/80
- 3. Intermediate pressure renulator t est -
l power reduction l
I 2
3 4
1: I ori ed Reason:
Method:
Exhibit G - Instructiims S: Sc heduled A 1:quipment Fatime(Lxplain) 1 -Manual for Pieparation of Data B Mainte:unce or Test 2-Manual Seeam.
I:nuy Sheets for Licensee C-Refueling 3 Autunutic Scram.
Event Repost ILL R) Fde INURI G-D Regulatiny liestriction 4 Other (Explain) 0161)
- 1. Opciator Tsaining A IJcense Examination F-AJnunistratr.e 5
1%lubit I - Same Souice G Operauonal Ensur IExplain) 19/77) lI Onher i1% plain) l
e I
UNIT SHUTDOWNS AND FOWER REDUCTIONS LNSTRUCTIONS L
This report should desenbe all plant shutdowns durmg the in accordance with the table appearms on the report form.
report penod. In addition,it should be the source of explan.
If category 4 must be used, supply bnef comments.
ation of sigmficant dips m average power levels. Each signi-LICENSEE EVENT REPORT *. Reference the applicable q
ficant reducuon m power level (greater than 20", reduction in average daily power level for the preceding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) reportable occurrence pertammg to the outage or power
{
should be noted, even though the urut may not have been reduction. Enter the first four parts (event year, sequennal shut down completely. For such reductions in power level, reprt number, occurrence code and report type) of the five i
l the duration should be listed as zero,the method of reduction part designation as descnbed in item 17 of Instructions for j
should be listed as 4 (Other), and the Cause and Correcuve Preparation of Data Entry Sheets for Licensee Event Report g
Action to Prevent Recurrence column should explain. The (LER) File (NUREG-0161). This information may not be l
Cause and Corrective Action to Prevent Recurrence column iramediately evident for all such shutdowns, of course, smce i
should be used to provide any needed explanation to fully further investigation may be required to ascertam whether ur desenbe the circumstances of the outage or power reduction.
not a reportable occurrence was involved.) If the outage or power reduction will not result in a reportable occurrence.
NUMBER. This column should indicate the sequential num, the positive indication of this lack of correlation should be ber assigned to each shutdown or significant reductionin power noted as not applicable (N/A).
for that calendar year. When a shutdown or sigmficant power SYSTE31 CODE. The system in which the outage or power reduction begms in one report penod and ends in another, rduction onginated sh'ould be noted by the tw'o digit code of an entry should be made for both report penods to be sure Exhibit G. Instructions for Preparation of Data Entry Sheets all snutdowns or sigmficant power reductions are reported.
or licensee Event Report (LER) File (NUREG4161).
Until a unit has ashieved its first power generation, no num-ber should be assigned to each entry.
Systems that do not fit any existing code should be designa-ted XX. The code ZZ should be used for those events where DATE. Dus column should indicate the date of the start a system is not applicable.
of each shutdown or sigmficant power reduction. Report as year. month, and day. August 14.1977 would be reported COMPONEFT CODE. Select the most appropnate component as 770814. When a shutdown or significant power reduction from Exhibit I - Instructions for Preparation of Data Entr>
begms m one report period and ends a another, an entry should Sheets for Licensee Event Report (LER) Fue (NUREG.0161).
be made for both report penods to 60 sure all shu: downs using the following critieria:
or s:gmficant power reductions are reported.
I TYPE. Use "F" or "S" to mdicate either " Forced" or " Sche-duled." respectively, for each shutdown or significant power. B.
If not a component failure, use the related component:
reduction. Forced shutdowns mclude those required to be e 8.. wrong valve operated through error: list valve ts initiated by no later than the weekend following discovery component.
of an off-normal condition. It is recognized that some judg.
ment is required in categonzing shn.: downs in this way. In C. If a cham of failures occurs, the first component to mal-general, a forced shutdown is one that would not have been function should be listed. The sequence of events,includ-completed in the absence of the condition for which corrective mg the other components wtdch fail, should be desenbed action was take't.
under the Cause and Corrective Action to Prevent Recut-tence column.
DURATION. Self-explanatory. When a shutdown extends Components that do not fit any existing code should be de-beyond the ead of a report penod, count only the time to the signated XXXXXX. The code 777777 should be used for end of the report penod and pick up the ensumg down time designation is not applicable.
,yents where a component m the fullowing report penods. Report duration of outages rounded to the nearest tenth of an hour to facilitate summation.
CAUSE & CORRECTIVE ACTION TO PREVENT RECUR-The sum of the tutal outage hours plus the hours the genera-RENCE. Use the column in a narrative fashion to amplif> or tor was on line should equal the gross hours m the reportmg explam the circumstances of the shutdown or power reduction.
pe nod.
The column should include the specific cause for each shut.
'""""*"'P
REASON. Categonze b) letter desnmation in accordance contemplated long term corrective action taken. if appropn-with the table appearmg on the report iorm. If category H ate. This column snould also be used for a description of the must be used. supply bnef eomments.
safety re!ated corrective mamtenann performed dunna the outage or power reduction including an identificat:on of METHOD OF SHUTTING nowN THE REACTOR OR the entical path activity and a report af any smgle release or REDUCING POhER. Categonee r> number designation radioactmty or ungle radiation exposure specifically associ.
INote that this ditters from the Edison E!ectric Institute ated with the outage which aceounts for more than 10 persen-t EEll derinitions of " Forced Parnal Outase" and "Sehe.
of the alluwable annual values.
duled Pattai Outaae." For thew ictms. LE! uses shange or For long textual reports contmue narrative on separate paper a0 MW as the creak pomi. For :arger power reactors. 30 MW 2nd rer :rer.se the shutdown or power redu,non no th,
- s mi smail a shange to wanant opianahou narranve.
{q:**
1 k
s-l January 1980 Refueling Information Rcquest_
F r
I 1.
Facility name:
BIG ROCK POINT PLANT
. p*- ).
Scheduled date for next refueling shutdown:
- J% - -~..2.
-l'. ;.
OCTOBER 1980 Scheduled date for restart following shutdown:
~
r
~3.
,. :;y
-+.
UOVEttBER 1980 Uill refueling or resumption of operation thereaf ter require a technical
.: - s
', Ji~ I4.
specification change or other liccas'e amendeent?
i NO If yes, explain.
the reload f uel design and core configuration been revicued by Plant Safety Review Committee to determine whethe If no, has NO scheduled?
If no review has taken place, uhen is it JULY 1980 Scheduled date(s) for-submittal of proposed licensing action and 5.
supporting information:
NONE Important licensing considerations associated uith refueling, e.g.. neu or different fuci design or supplier, unrevieved design or performance ana-6.
lysis =ctbods, signifierust changes in fuel design, new operating procedures:
NONE 88
- spent fuel storage pool 7.
Number of fuel assem.blies in:
core 84 licensed spent fuel storage capacity:
193 8.
Present Size of any increase in licensed storage capacity that has been requested or I
is planned (in number of fuel assemblics):
248 can be discharged to spent fuel Projceted dare of the last refueling that 9.
licensed capacity:
pool assuming the present 1983 re k