AO-1-74:on 740301,Channel 3 Neutron Flux Level Instrumentation Failed.Caused by Amplifier Failure Due to Defective Series Regulator Tube.Personnel Instructed on How to Put Monitor in Trip Position
ML20031C233
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 03/12/1974
From: Sowell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20031C230 List:
References
AO-1-74, NUDOCS 8110060656
Download: ML20031C233 (3)


Text

,-

1 i

CORSum8f5 Power Company 0

I i

U c

a...e ome..: ein w.u u.ca.o.a 4..~

s.c ac. u.ca.e.a aosoi. 4<.eco. sn ree-osso

,*.c

[gd]%

j *M$. $,

po

.v.@.. //

m.

v Mr. John F. O' Leary, Director

//;f M d Re: Docket No 50-155 Directorate of Licensing License No DPR-6 United States Atomic Energy Commission Big Rock Point Washington, DC 205h5

Dear Mr. O' Leary:

This letter is written to report an abnormal occurrence (AO.-1-Th) which occurred at the Big Rock Point Plant on March 1,1974.

'Ihis abnomal occurrence involved the failure of the Channel 3 neutron flux level instrumentation.

At the time this instrument failure occurred, the plant was operating st a steady power level of 166 MW. The Channel 3 neutron t

flux level dropped to zero and imediately returned to a slightly higher indication, 101 percent. (The present 100 percent setting corresponds to 180 IN ')

t Troublesheating revealed that the instrunent channel vould not respond to either high-voltage changes on the chcmber or to input changes. The spare picon==eter was installed, tested and the instru-cent channel was returned to service. The instrument channel was out of cervice for a total of one hour and eleven minutes.

The failure of this instru=ent channel did not result in a loss of any protective function in the reactor protection system.

Three neutron flux instru=ent channels provide a reactor protection system tripping function with two out of three logic. With Channel 3 failed, the ot.her two channels were btill capble of performing the required protective function.

I This is the first known nenfail-safe failure of the a=plifier's function of the picon==eters at Big Rock Point. As bench testing of the faulty unit has failed to detect the esuse, the manufacturer has l

been requested to analyze and provide correcti e measures in an effort i

1 4

2115 J

8110060656 740312 PDR ADOCK 05000155

~

S PDR

O Mr. John F. 0%ary, Direct:r 2

Docket No 50-155-License No DPR-6 Big Rock Point March 12, 1974 gQ to prevent recurrence. In addition, instructions have been issued to plant operations personnel explaining how to put the monitor in a trip condition if the problem recurs.

Yours very truly, Ralph B. Sewell (Signed)

RBS/ sam Ralph B. Sewell Nuclear Licensing Administrator CC: JCKeppler, USAEC l

l l

d L

i i

1 I

i s

l l

l t

f 1

e I

_.. ~... _. _.... _ -,, _..,.. _

ABNORMAL OCCURRENCE RtPORT

  • 7N CONTROL BLOJ: :OiOf O1 1

1 6*

FACILITY:

CATFCORT: REPORT TYPE:

SOURCE: DOCKET #3 ETEAT DATE:

REPORT DATE:

Ot_8 'DiSCRiPTiON cr HrMiM.@ i _ i g 'C L.i

-QsQ.0155 03017f D3 /174 t

5 a

at 68 6'

75 8

_0_2_

C H a s v e.L-1 U p Orto,>

F L (> >c L>

vet 7

89 80 s

un s n u n t x>

w>

wew r e-rn o ntra

/ OO b r:_ O

t. s / P [ '

fl 6 E

'To

/bl 9o vi u E

_0 4__

t w (td. 7I im eu s w2 n - / (gG n v(EQ.go 7

89 a

{ (% o - I - 74)

A 80 SYS b NO.:

PR0XIMATE COMPONENT CACSE CODE A-PERSONNEL ERROR D-PROCD URES DEFECTIVE NUMB r.R 6,

c DESICN ERROR B-E-COMPONEi(T FAILERE

/, Oi

~

O rx' m a' c^e'r r-'*"'

12

, 13 CRIPTIOf.OFCAUSk!

A ME Fht5 % P L i F e C l.-

Ab A D 6 F fEc71 UE. S /: E i ES 7

89 80

'A' '

N t_ A Q.

-- V E E.

Don W M SutTF * > le)

(ot,P d bc_

Loss w-Mioas /E o Vour ).C, b et$;ptL v

,0 7-89 30 STATUS OF A-W% h a 105 t-LW C.nANt5 Wuw D

A-OFEAATIONAL DENT RE!.CTOR CODE:

B-PREOP! RATIONAL. INITIAL ROUTINE POWER OPERATION OF 8-ROUT 1h1 TEST /1RSPEC.

STARTUP AND POWER ASCENSION G-SHUTDOWN (HOT OR COLD.

DISCOVERT C-SPECIAL TES;/INSPFC.

TESTS EXCEPT RETVELLING) 0-EXTTRNAL SOURCE (DISC.):

C-ROUTINE STARTUP OPERATION H-REFUELL1hc D-ROUTINE SHUTTING DO.'N OPERATION I-01HER. INCLUDING SPECIAL E-STEADT STATE OPERATION AT E

TESTS (DESCRIBE)

POWTR STATUS:

2 OIRER STATUS:

DISC.:

DESCRIPTION:

11 l

l g

l i

l 9

10 12 13 44 4 46 4

7 8 l-PORM OF L: LIQJID CONTENT

h hv&LE GAS

' ACTIVITY 5: SOLID OF 1: RALOGEN RELEASED:

C: CAS RELEASE:

Pt PARTICrIATT AMOUNT OF ACTIVITY:

LOCATION OF RELEASE:

12 t

l t

e i

f 7

8 9

10 11 44 45 4

PERSONNEL EXPOSURES :

NUMBER:

DESCRIPTION:

13

,., a 80 7

8 9 11 12 PERSONNEL IN Wg!ES:

NUMBER:

DESCRIPTION:

14 I i,l OFFSITEh0NSEhENCES:

15 60 DAMAGE TO FACILITY:

f 16 80

' PUBLICITY:

17 7

8 9

H n,vi I4-m=r r,rn ADDIT 4OMALFACTOR$s ww, m,=

o cn eno.,.rs m,a

,28-bM b. b G ( bC, 19 g

7 8

9 g

PIV. 8/21/73 l

l an

h J

J 4

e M

, _ _ -..,