Forwards IE Insp Rept 50-206/81-27 on 810702-31.No Noncompliance Noted
ML20031A528
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 09/01/1981
From: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20031A529 List:
References
NUDOCS 8109230635
Download: ML20031A528 (2)


See also: IR 05000206/1981027

Text

i

m

-

ss

1

-

'$

t

o

g

"4

i

'$

.

.

i

SEP 1

l'3M

Docket No. 50-206

9

=3

s

f

/SlU($m

. } 'O

Q

/

h

,

.

I

Ll

L

L

~4

ljl

Southern California Edison Company

2244 Walnut Grove Avenue

-

bg g gggja- g

p'

P. O. Box 800

c

J

Rosemead, California 91770

~

u.5 $ f M y m C-

-

%

y

?

Attention:

Dr. L. T. Papay, Vice President

%

-M

Advanced Engineering

Tyr j/

f-

Gentlemen:

p

_

h

Subject:

NRC Inspection - San Onofre Unit I

P

This refers to the inspection conducted by Mr. L. M113cv of this

t

office on July 2 - 31, 1981 of activities authorize.d by NRC license

!

No. DPR-12, and to the discussions of his findings held by Mr. Miller

1

with Mr. Morgan and other representatives of the Southern California

i

Edison Company at the conclusion of the inspection.

1[

Areas examined during this inspection are described in the enclosed

4

inspection report.

Within these areas, the inspection consisted of

'g

selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

R

Ib

No items of noncompliance with NRC requirements were identified

within the scope of this inspection.

3

>

In accordance with 10 CFR 2.790 of the Commission's regulations, a

j

copy of this letter and the enclosed inspection report will be placed

1

in the NRC's Public Document Room.

If this report contains any

d

information that you believe to be exempt from disclosure under

9

10 CFR 9.5 (a)(4), it is necessary that you (a) notify this office by

y

telephone within ten (10) days from the date of this letter of your

y

intention to file a request for withholding; and (b) submit within

N

25 days from the date of this latter a written application to this

j

office to withhold such information.

If your receipt of this letter

a

has been delayed such that less than seven (7) days are available

sj

for your review, please notify this office promptly so that a newConsistent with section 2.790(b)(

y

I

due date may be established.

5

any such application must be accompanied by an affidavit executed

j

by the owner of the information which identifies the document or

/

W

part sought to be withheld, and which contains a full statement of

%

the reasons on the basis which it is claimed that the information

j

should be withheld from public disclosure.

This section further

requires the statement to address with specificity the considerations

g]

RV.:...e9h

.M .

.

!

"'c4

.

.

..........

. . .. .... ....

.

.. ,,. .. .

. ... , . . ,

'u a - > .L ,,,M,j ,1f,,er,,,,, G, ,, , ,y,q ,, g.i.g , , ),,. .S.t.Rr.0b. erg .

phD0

o! ooh 06 * "" " *

  • "

' '

""""

,

"> 8G.I./8.1.... .

8(3/,a.1...

8/,, ,/8,1.,

,,, ,,, , ,,,, ,,,,,,, ,,,,,,,,,,, o a,, , ,,,,,,

3

P

, , , ,

, , , , , , , , , , , , , , ,

,,,

NRCF RM 318 H& 8W NRCM O240

OFFICIAL RECORD COPY

wsm iseo-32ee24

3

__

.

.

..

.

.

.

.

,

.

j.

v>81

Soutnern California Loiaon Company

- 2-

listed in 10 CFR 2.790(b)(4).

Tne information sought to be withheld

'

sitell be incorporated as far as possible into a separate part of the

affidavit.

If we co not hear from you in this regard within the

specified periods noted above, the report will be placec in the

i aLlic Doc wi c nt Koom.

.--

we will be

Should you have any questions concerning this inspection,

glad to ciscuss t her. with you .

Sincerely,

M

Sternberg, Chief

..

Reactor Operations Projects branch

mnclosares:

IL Inspection xeport

o

5 0 - 2 0 t; / e l- 2 7

cc w/o enclosure

1.

c.:

uietch, sice i r e s i t. e n t

.s

,uclear Engineering 6 Ugeraticas, iCr

!;1

h

r.

Rey,

at

Sont to DNB for 4bt3 DCs c'rocessing

Distributed by RV:

State of CA (Hahn/Inhnson)

RV PDR

Rosident lospector

f noelkon (1tr)

Bob Pato (60-206/Pl-2/)

..

.

.

g

.

.