Forwards IE Insp Repts 50-508/81-13 & 50-509/81-13 on 810727-31.No Noncompliance Noted
ML20031A522
Person / Time
Site: Satsop
Issue date: 09/04/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20031A523 List:
References
NUDOCS 8109230619
Download: ML20031A522 (2)


See also: IR 05000508/1981013

Text

-

-

_ _ _ _ _ _ _ _ _ _ _ _ .

__

i

"5

O

R

e

O

V

9

g

i

o

o-

'

- SEP 4

1981

Docket No. 50-508, 50-509

I!?>'/

s

Ip-

kh %

I$A'.'.

tU

-

Washington Public Power Supply System

E

P. O. Box 1223

SEP 2 21981

11

Elma, Washington 98541

(\\ " 5 W "@" " ;

Attention: Mr. R. S. Leddick

D

Program Director, WNP 3/5

/ig gL

Gentlemen:

Subject: NRC Inspection of Washington Nuclear Projects Units 3 and 5 (WNP-3/5)

This refers to the inspection conducted by Messrs. T. F. Bishop and W. G. Albert

of this office on July 27-31, 1981 of activities authorized by NRC Construction

'

Permit Nos. CPPR 154 and 155, and to the discussion of- our findings held by

Mr. Albert with you and other members of your staff at the conclusion of the

,

inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

This report does not address our concurrent investigation of certain

allegations arising from activities under your 224 contract.

This subject

will be reported upon in separate correspondence.

No items of noncompliance with NRC requirements were identified within the p o/

scope of this inspection.

3

/!/

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of

this letter and the enclosed inspection (or investigation) report will be

placed in the NRC's Public Document Room.

If this report contains any

under 10 CFR 9.5(you (or your contractors) believe to be exempt from disclosure

infomation that a)(4), it is necessary that you (a) notify this office by

telephone within ten (10) days froin the date of this letter of your intention

to file a request for withholding; and (b) submit within 25 days from the date

of this letter a written application to this office to withhold such

infomation.

If your receipt of this letter has been delayed such that less

8109230619 810904 T

PDR ADOCK 05000500:

G

PDR

I . Y.. .......

h . ..

"'C'>

.....

.

.... .

..

. . .. .

..

.. ................

. ... .. ...........

sua-c)

B R /,jk

BISHOP

D0D

FAULi1NBERRY

" * >

.... .. . . .. .

..... .

. . ....

....

. .. ...

.. . . .. . ... .

. .. . . ... . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . .

NRC FORM 318 410,801 NRCM O240

OFFICIAL RECO_RD COPY

' - aso-32+82 j

-

_

.

_ . .

,

'

SEP 4

1981

Washington Public Power Supply System

-2-

than seven '7) days are available for your review, please notify this office

promptly so inat a new due date may_be established. Consistent with section

2.790(b)(1), any such application must be accompanied by an affidavit executed

by the owner of the information which identifies the document or part sought

to be withheld, and which contains a full statement of the basis on which it

is claimed that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity the

considerations listed in 10 CFR 2.790(b)(4). The infonnation sought to be

withheld shall be incorpora'.d as far as possible into a separate part of

the affidavit.

If we do not hear from you in this regard within the specified

periods noted above, the report will be placed in the Public Document Room.

Should you have any questions.concerning this inspection, we will be glad-

to discuss them with you.

Sincerely,

B. H. Faulkenberry

Chief, Reactor Construction Projects

Branch

Enclosure:

IE Inspection Report

No. 50-508/509/81-13

cc w/o enclosure:

R. B. Glasscock, Quality Assurance Director, WPPSS

Dale Dobson, Project Manager

Sent to DMB for DCS Processing

Distributed by RV:

State of WA (Lewis)

Resident Inspector ~