ML20031A057

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-508/81-12 & 50-509/81-12 on 810713-17.No Noncompliance Noted
ML20031A057
Person / Time
Site: Satsop
Issue date: 08/21/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20031A058 List:
References
NUDOCS 8109180337
Download: ML20031A057 (2)


See also: IR 05000508/1981012

Text

--

y

~Q

s

.

9

I

(

AUG 21399;

Docket No. 50-508, 50-509

j

,

&,Y,f

h,,0b

i b

-

Washington Public Power Supply System

d $d' N

P. O. Box 1223

(6

.

,

Elma, Washington 98541

Attention: Mr. R. S. Leddick

%

N

Program tirector, WNP-3/5

Gentlemen:

Subject:

NRC Inspection at Washington Nuclear Project Nos. 3 and 5

This refers to the inspection conducted by Messrs. D. P. Haist and

A. J. D' Angelo of this office on July 13-17, 1981 of activities authorized

by NRC ,onstruction Permit Nos. CPPR-154 and CPPR-155, and to the

discussion of our findings with you and other members of your staff at

the conc 1?sion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

No items of noncompliance with NRC cequirements were identified within the

scope of this inspection.

i

l

In accordance with 10 CFR 2.790 of the Conunission's regulations, a copy of

this letter and the enclosed insrection report will be plac2d in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within ten (1) days from the date of this letter of your intention to file

a request for withholding; and (b) sutnit dhin 25 days from the date of

this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven (7)

days are available for your review, please notify this office promptly so

that a new due date pay be ottablished. Consistent with section 2.790(b)(1),

any such application must be accompanied by an affidavit executed by the owner

60

8109100337 810821

PDR ADOCK 05000500

ffg

g

G

PDR

\\i

. . y,gg(,, ,

,

,g

R

j,,,,, .

"'">

,f,

..

BERRY

.

'

-

.

FAUL

D0DDS

""*>

HA,I,S,i/J,k ,

,D, , ,Ang. ?. o

.

Omp

8g0/81

8/ 881 ' " ' '8/yf/B1 '

'8/20/81"

..

-

-

-

-

.

.....

. . . .

.... .. . ..

. .

. .

,,

,

,

, ,, ,,

,

, ,, ,

,

,, , ,

,

,,

, ,

, , ,

NRC FORu 318 :10 80i N H C M O2 4 0

OFFICIAL RECORD COPY

j " *"32"2'

s

.

.

~--- s

Pashington Public Power Supply System

-2-

fyp;p,,....

of the information which identifies the document or part scught to be withheld,

and which contains a full statenent of the reasons on the basis which it

is claimed that the information should be withheld fron public disclosure.

This section further reouires the statement to address with specificity the

considerations listed in 10 CFR 2.790(b)(4). The information sought to be

withheld shall be incorporated as far as possible into a separate part of

the affidavit.

If we do not hear from you in this regard within the specified

periods noted above, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be glad

to discuss then with you.

Sincerely,

, na sasu LI

a 1.ce925

B. H. Faulkenberry, Chief

Reactor Construction Projects Branch

Enclosure:

IE Inspection Report

Nos. 50-508/81-12

50-509/81-12

cc w/e enclosure:

W. C. Bibb, Project fianager

R. B. Glasscock, Quality Assurance Director

v ,. , ;;

Sent to DMB for DCS Procdssing

Distributed by RV:

-

,'s

s

State of WA (Lewis)

,

RV PDR

Engtlken (ltr)

l

' ~ .

-

l

-

I

o

s/

w