Text
l
e
,
i 's
<
%
2
%-
ip
Q
%
h
A
1
,
AUG 21 1981
Docket No. 50-508, 50-509
%
=7
-
d
3.)
?
EtW1190lw
Washington Public Power Supply System
i
,
P. O. Box 1223
Elma, Washington 98541
%
g
Attention: Mr. R. S. Leddick
Program Director, WNP-3/5
Gentlemen:
Subject: NRC Inspection at Washington Nuclear Projects Noc. 3 and 5 (WNP-3/5)
This refeis to the inspection conducted by Mr. T. W. Bishop of this office
on June 3-26, 1981 of activities authorized by HRC Construction Pennit
Nos. CPPR 154 and CPPR 155, and to the discussion of our findings with
you and other members of your staff at the conclusion of the inspection.
Areas examined during this in?pection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and respresentative records, interviews with personnel, and
observations by the inspector.
No items of noncompliance with PRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790 of the Corrnission's regulations, a copy
of this letter and the enclosed inspection report will te placed in the
NRC's Public Document Room.
If this report ccntains any infonnation that
you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone
within ten (10) days frcm the dEte of this letter of your intention to
file a request for withholding; and (b) submit within 25 days from the date
of this letter a written application to this office to withold such infomation.
If your receipt of this letter has been delayed such that less than seven
d
-
8109180318 810821
[ / [,
PDR ADOCK 05000308
s
O
..DQD.D. p. ..
.9..g,.
-4
. . R.v.qw.
.
.
..
.. .
. . .
.
. .. .
. ...
.
" " "' "' I . . 6.IShQP/.dh..
FAL%..E.NBER.Ry, ,, ,
, ,,,
. . .,
.... ,, ,
" ' > Yb.
.
.
. . . . .
.
...
.. .
. . ... ...
.. .
. . . ..
.
. ..
.. .
' " ' *-32"24
' NRC FORM 318 10s00l NRCM O240
OFFICIAL RECORD COPY
_
_
,
'
f
e
.
I
w
Aug g y
uasnington uenc rower suppiy system
-c-
(7) days are available for your review, please notify this office promptly
so that a new due date may be established. Consistent with section 2.790
(b)(1), any such appitcation must be accorpanied by an affidavit evocuted
by the oner of the infomation which identifies the document or part sought
to be withheld, and which contains a full statenent of the basis on which
,.
it is clained that the infomation should be withheld from public disclosure.
l
This section further requires the s+atenent to address with specificity
i
theconsiderationslistedin10CFR2.790(b)(1). The infomat6cn sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, the report will be placed in the Public
r.
Document Roon.
[
i
Should you have any quettions concerning this inspection, we will be glad
to discuss them with you.
Sincerely,
i
B. Faulkenberry, Chief
f
Reactor Construction projects Branch
Enclosure:
IE Inspection Report
tio. E0-508/509/81-11
cc w/o enclosure:
RR.D. Glasscock, Quality Assurance Director
D. E. Dobson, proj+.:t Manager