ML20031A035

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-508/81-11 & 50-509/81-11 on 810603-26.No Noncompliance Noted
ML20031A035
Person / Time
Site: Satsop
Issue date: 08/21/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20031A036 List:
References
NUDOCS 8109180318
Download: ML20031A035 (2)


See also: IR 05000508/1981011

Text

l

e

,

i 's

<

%

2

%-

ip

Q

%

h

A

1

,

AUG 21 1981

Docket No. 50-508, 50-509

%

=7

-

d

3.)

?

EtW1190lw

Washington Public Power Supply System

i

,

P. O. Box 1223

Elma, Washington 98541

%

g

Attention: Mr. R. S. Leddick

Program Director, WNP-3/5

Gentlemen:

Subject: NRC Inspection at Washington Nuclear Projects Noc. 3 and 5 (WNP-3/5)

This refeis to the inspection conducted by Mr. T. W. Bishop of this office

on June 3-26, 1981 of activities authorized by HRC Construction Pennit

Nos. CPPR 154 and CPPR 155, and to the discussion of our findings with

you and other members of your staff at the conclusion of the inspection.

Areas examined during this in?pection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and respresentative records, interviews with personnel, and

observations by the inspector.

No items of noncompliance with PRC requirements were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790 of the Corrnission's regulations, a copy

of this letter and the enclosed inspection report will te placed in the

NRC's Public Document Room.

If this report ccntains any infonnation that

you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within ten (10) days frcm the dEte of this letter of your intention to

file a request for withholding; and (b) submit within 25 days from the date

of this letter a written application to this office to withold such infomation.

If your receipt of this letter has been delayed such that less than seven

d

-

8109180318 810821

[ / [,

PDR ADOCK 05000308

s

O

PDR

..DQD.D. p. ..

.9..g,.

-4

. . R.v.qw.

.

.

..

.. .

. . .

.

. .. .

. ...

.

" " "' "' I . . 6.IShQP/.dh..

FAL%..E.NBER.Ry, ,, ,

, ,,,

. . .,

.... ,, ,

" ' > Yb.

.

.

. . . . .

.

...

.. .

. . ... ...

.. .

. . . ..

.

. ..

.. .

' " ' *-32"24

' NRC FORM 318 10s00l NRCM O240

OFFICIAL RECORD COPY

_

_

,

'

f

e

.

I

w

Aug g y

uasnington uenc rower suppiy system

-c-

(7) days are available for your review, please notify this office promptly

so that a new due date may be established. Consistent with section 2.790

(b)(1), any such appitcation must be accorpanied by an affidavit evocuted

by the oner of the infomation which identifies the document or part sought

to be withheld, and which contains a full statenent of the basis on which

,.

it is clained that the infomation should be withheld from public disclosure.

l

This section further requires the s+atenent to address with specificity

i

theconsiderationslistedin10CFR2.790(b)(1). The infomat6cn sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, the report will be placed in the Public

r.

Document Roon.

[

i

Should you have any quettions concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

i

B. Faulkenberry, Chief

f

Reactor Construction projects Branch

Enclosure:

IE Inspection Report

tio. E0-508/509/81-11

cc w/o enclosure:

RR.D. Glasscock, Quality Assurance Director

D. E. Dobson, proj+.:t Manager

' tnt to DitB for DCS Processing

.

Distributed by RV:

!

State of WA (Lewis)

Resident Inspector

!!

.

J

,

, n

-w

--

--,e.,-,nn.,.m,-

.,_..w..,,_n_.,,____,_,____

__

_

.