Discusses Review of Util Response to Generic Ltr 81-04 Re Emergency Procedures & Training for Station Blackout Events. Implementation Schedule Acceptable
ML20030E011
Person / Time
Site: Calvert Cliffs  
Issue date: 08/28/1981
From: Clark R
Office of Nuclear Reactor Regulation
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
References
GL-81-04, GL-81-4, NUDOCS 8109170283
Download: ML20030E011 (2)


Text

'

?..A -

5~

7)c3_,;3_g

~

AUG 2 81981 Docket Hos.

and 0

IPf s dh e

Mr. A. E. Lundvall, Jr.

S Vice President - Supply S EP O 21981

  • Baltimore Gas & Electric Company 9" v.s.g7 P. O. Box 1475 ealtimore, Maryland 21203 e

g RE: CALVERT CLIFFS UtilTS 1 AND 2 A

G

Dear Mr. Lundvall:

We have reviewed ynur response to generic letter 81-04 recarding emergency procedures end training for station blackout events, Our review was to confim that the subject procedures and training either. currently exist or will be implemented on an acceptable schedule at Calvert Cliffs Units 1 and 2.

Our review did not include an evaluation of the details provided in your response beyond that necessary to confim the above.

You indicated that procedures and training for station blackout will bc l

implenented at Calvert Cliffs Units 1 and 2 by the end of Hovember 1981.

We find this frplementation schedule acceptable. The NRC's Office of Inspection and Enforcement will review the subject procedures and training l

progran during a future plant inspection.

l Sincerely, origir.at og 4 Yirh]ian 0 IDlT!/ g,,

Robert A. Clark, Chief Operating Reactors Branch #3 l

Division of Licensing cc: See next page DISTRIBUTION:

Docket File DEisenhut NRC PDR OELD L PDR 18E-3 NSIC

' &S-10 TERA JHeltemes ORBf3 Rdg Gray File PM CNelson PMKreutzer-3 e109170283 810828 RAClart fDRADOCK 05000317

(.0824d.....PDR omer >

dlk:......0BE

.0Bp DL.....

...$....a;r.k........

6UCzer DJa Cf on R

sunura >

8/Q pl,,,,,8/ M 1,,,,,,, 8., 81.,,,,,,,,,8 $'8,1,,,,,,,,,

om) unc ronu m ossoi nacu cm.

OFFICIAL RECORD COPY esom=-mm]

, l' r

Saltimore Gas and ' Electric Company cC*

James A. Biddison, Jr.

Ms. Mary Harr' son, President General Counsel Calvert County Doard of County Commissioners Baltimore Gas and Electric Company Prince Frederick, MD 20768 P. O. Box 1475 Baltimore, MD 21203 U. S. Environmental Protection Agency Region III Office George F. Trewbridge, Esquire Attn: EIS Coordinator Shaw, Pi',tman, Potts and Trowbridge Curtis Building (Sixth Floor) 1800 M Street, N. W.

Sixth and Walnut Streets Washington, D. C.

20036 Philadelphia, PA 19106 Mr. R. C. L. Olson, Principal Engineer Mr. Ralph E. Architzel Nuclear Licensing Analysis Unit Resident Reactor Inspector Baltimore Gas and Electric Company NRC Inspection and Enforcement Room 922 - G&E Building P. O. Bos 437 P4 0. Box 1475 Lusby, MD 20657 B&1timore, MD 21203 Mr. Charles B. Brinkman Mr. Leon B. Russell Manager - Washington Nuclear Operations Plant Superintendent Combustion Engi1eering, Inc.

Calvert Cliffs Nuclear Power Plant 4853 Cordell Av enue, Suite A-1 Maryland Routes 2 & 4 Bethesda, MD 20014 Lusby, MD 20657 Mr. J. A. Tieman, Manager Bechtel Power Corporation Nuclear Power Department Attn Mr. J. C. Judd Calvert Cliffs Nuclear Power Plant Chief Nuclear Engineer Maryland Routes 2 & 4 15740 Shady Grove Road Lusby, MD 20657 Gaithersburg, MD 20760 Mr. W. J. Lippold, Supervisor Combustion Engineering, Inc.

Nuclear Fuel Management Attn: Mr. P. W. Kruse, Manager Baltimore Gas and Electric Co.npany Engineering Services Calvert Cliffs Nuclear Power Plant P. O. Box 500 P. O. Box 1475 Windsor, CT 06095 Baltimore, Maryland 21203 Public Document Room Mr. R. E. Denton, General Supervisor Calvert Coun'ty Library i'*aining & Technical Services Frince Frederick, MD 20678 Calvert Cliffs Nuclear Power Plant Maryland Routes 2 & 4 Director, Department of State Planning Lusby, MD 20657 301 West Preston Street

~

Baltimore, MD 21201 Mr. R. M. Douglass, Manager Quality Assurance Department Administrator,' Power Plant Siting Program Fort Smallwood Road Complex Energy and Coastal Zone Administration P. O. Box 1475 Department of Natural Resources Baltimore, MD 21203 Tawes State Office Building Annapolis, MD 21204 Mr. T. L. Syndor, General Supervisor Operations Quality Assurance Calvert Cliffs Nuclear Power Plant Maryland Routes 2 & 4 Lusby, MD 20657