Forwards Evaluation of Interim Measures Taken at Facility Re TMI Action Plan Item II.K.3.22.Reactor Core Isolation Cooling Sys Suction Manual Switchover to Suppression Pool Acceptable
ML20030D733
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/04/1981
From: Ippolito T
Office of Nuclear Reactor Regulation
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.22, TASK-TM NUDOCS 8109160016
Download: ML20030D733 (4)


Text

_

g.

3 SEP 4 19 81 Docket flos. 50-325 and 324 f",

,;d

/hg A

Mr. J. A. Jones

's' Senior Executive Vice President D/

hp TO7 pp Carolina Power & Light Corpany y

J 336 Fayetteville Street

(-

g j

Raleigh, North Carolina 27602 g

?

RE: BRUNSWICK STEA'i ELECTRIC PLANT UNITS 1 AND 2 s

Dear Mr. Jones:

Item II.K.3.22 of the THI Action Plan (NUREG-0737) required the automatic switchover of Reactor Core Isolation Cooling (RCIC) Systen suction to the suppression pool when condensate storage tank level is icw. As an interin reasure until automatic switchover modifications are accomplished licensees should verify that clear and cogent procedures exist for manual switchover.

Enclosed is an evaluation of the intertia measures taken at your facilities.

This evaluation concludes that the ranual switchoter procedures have been reviewed and found acceptable.

Based upon the above, Item II.K.3.22a has been satisfactorily completed for ycur facilities.

Item II.K.3.22b, actual plant modifications, remains unresolved and will be the subject of future correspondence.

Sincerely, Original Sianed by

'T. A. Ip;mlito Thomas A. Ippolito, Chief Operating Reactors Branch #2 Division of Lict.nsing

Enclosure:

As stated cc w/ enclosure See next par-Di ibution:

cket File NSIC J. Heltemes, AE0D D. Verre111 NRC PDR TERA T. Ippolito R. Emch Local PDR GRAY (1)

S.' Norris P.. Polk ORB #2 Reading ACRS (10)

J. Van Vliet E. Jordan D. Eisenhut J. 01shinski OI8E(3)

OELD

' UMUf2 UMB Z UMDF4 7 UKDF4 omert...PPolk........

.. s...

J.VanV.11et....T.Ippal.i.ta..

. - *:t>... 8/f../.81,.... g/,f./8,1.,,,, y,(,1,/8,1,,,,,,,, 8(,,gt,8i,,,,

.ff.

..,..w DAf g} Q9 $ fQQ g f g RQ9Q4 4.

...,.......w.

.. - ~.....

PDR ADOCK 05000324 Nac ron%P PDR OFFICIAL RECORD COPY

. usam. o-ax,eo w

E Mr. J.'A. Jones cc:

- Richard E. Jones, Esquire Carolina Power & Light Company 336 Fayetteville Street

~

Raleigh, North Carolina 27602 George F. Trowbridge, Esquire Shaw, Pittman, Potts & Trowbridge 1800 M Street, N. W.

Washington,. D. C.

20036 John J. Burney, Jr., Esquire.

Eurney. Burney, Sperry & Barefoot 110 North-Fifth Avenue Wilmington, North Carolina 28401 Fesident Inspector U. S. Nuclear Regulatory Commission

' P. O. Box 1057 Southport, North Carolina 28461 Southport - Brunswick County Library 109 W. Moore Street Southport, North Carolina 28461

!'r. Charles R. Dietz Plant Manager P. O. Box 458 Southport, North Carolina 28461

~

3

3 TITLE: IE REVIEW AND EVALUATION OF LICENSEE CONFORMANCE WITH TMI ACTION PLAN REQUIREMENTS ACTION PLAN ITEM NO: II.K.3 22 TITLE: AUTOMATIC SWITCHOVER OF REACTOR CORE ISOLATION COOLING SYSTEM SUCTION U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT l

UTILITY: CP&L FACILITY: BRUNSWICK UNIT NOS. I and 2 DOCKET N05. 50-324 and 50-325 Signature:

. [-

, Acting Director, Division of Resident and Project inspection, Ril Date:

JUN 1 2 1931 PARENT REGION CONTACT:

F. Jape i

1'9

o.-

II,K.3.22 AUTOMATIC SWITCHOVER OF REACTOR CORE ISOLATION COOLING S SUCTION--VERIFY PROCEDURES AND MODIFY DESIGN Position The reactor core isolation cooling (RCIC) system takes suction from the conden-switchobver to the suppression pool when, the sate storage, tank with. manual This swit: hover should be made auto-is low.

condensate storage tank levelUntil the automatic switchover is implemnted,. licensees s for the manual swithcover of the RCIC

-.matica11y.

that clear and-cogent procedures exist system suction from the condensate storage tank to the suppression pool.

Discussion and Conclusions _

In a.1dtter to Eisenhut, submitted on December 15, 1980, the licensee stated that modifying RCIC to provide for auto-switchover of pump suction from the condensate tank to the suppression pool, will require RCIC to be removed from service.

The licensee has elected to perform this modification during the following scheduled outages:

Unit 2 - Cate 1981 Unit 1 - Early 1982 The licensee presently has 'a plant operating procedure, OP-16 "RCIC System" This procedure has been reviewed and for manual switchover of RCIC suction.

found acceptable for use until the automatic switchover modifications are accomplished.