ML20030D709

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-454/81-12 & 50-455/81-10 on 810812-13 & Notice of Violation
ML20030D709
Person / Time
Site: Byron  
Issue date: 09/02/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20030D710 List:
References
NUDOCS 8109150556
Download: ML20030D709 (2)


See also: IR 05000454/1981012

Text

.

September 2, 1981

?

/A

$r TI

g*

6'

N

ll-)

LI

~

Docket No. 50-454

Docket No. 50-455

. E_. SEP 1 11981 m 79

NW.

Commonwealth Edison Company

.\\

l

ATTN:

Mr. Cordell Reed

@

Vice President

s

,

Post Office Box 767

g,

l

Chicago, IL 60590

'

!

Gentlemen:

This refers to the routine safety inspection conducted by Mr. J. H. Neisler

of this office on August 12-13, 1981, of activities at Byron Nuclear Power

Station, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-130

!

and No. CPPR-131 and to the discussion of our findings with Mr. G. Sorensen

and other members of yrur staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

j

the inspection. Within these areas, the inspection concisted of a selective

l

examination of procedures and representative records, observations, and in-

'

terviews with personnel.

l

During this inspection, certain of your activities appeared to be in non-

!

compliance with NRC requirements, as specified in enclosed Appendix A.

A

written response, submitted under oath or affirmation, is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter, the enclosures, and your response to this letter will be

,

!

placed in the NRC's Public Document Room.

If the enclosures contain any

i

information that you or your contractors believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this

office by telephone within seven (7) days from the date of this letter of

l

your intention to file a request for withholding; and (b) submit within

twenty-five (25) days from the date of this letter a written application

to this office to withhold such information. Section 2.790(b)(1) requires

!

l

l

s,.

8109150556 810902

PDR ADOCK 05000454

G

PDR

.

-

!

l

Commonwealth Edison Company

-2-

September 2, 1981

that any.such application must be accompanied by an affidavit executed by

the owner of the information which . tentifies the document or part sought

i

to be withheld, and which contains a full statement of the reasons which

are the bases for the claim that the information should be withheld from

public disclosure. This section further requires the statement to address

l-

with specificity the considerations listed in 10 CFR 2.790(b)(4). The.

information sought to be withheld shall be incorporated as far as possible

!

into a separate part of the affidavit.

If we do not hear from you in this

j

regard within the specified periods noted above, a copy of this letter,

l

the enclosures, and your response to this letter will be placed in the

l

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

I

Sincerely,

l

t

'

.

l

R. L. Spes,ard

ector

Division of Resident and

i

Project Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

l

No. 50-454/81-12 and

j

No. 50-455/81-10

cc w/encls:

J. S. Abel, Director

of Nuclear Licensing

Gunner Sorensen, Site

Project Superintendent

'

V. I. Schlosser,

Project Manager.

l

R. E. Querio, Station

l

Superintendent

DMB/ Document Control Desk (RIDS)

Mary Jo Murray, Office of

Assistant Attorney General

Myron M. Cherry

,

RIII

RIII

III

RIII

RIIJ

,

'

hai

p

inds

a es

Kno

_ S/ s ard

8/2 /81

/, yj