September 2, 1981
?
/A
$r TI
g*
6'
N
ll-)
~
Docket No. 50-454
Docket No. 50-455
. E_. SEP 1 11981 m 79
NW.
Commonwealth Edison Company
.\\
l
ATTN:
Mr. Cordell Reed
@
Vice President
s
,
Post Office Box 767
g,
l
Chicago, IL 60590
'
!
Gentlemen:
This refers to the routine safety inspection conducted by Mr. J. H. Neisler
of this office on August 12-13, 1981, of activities at Byron Nuclear Power
Station, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-130
!
and No. CPPR-131 and to the discussion of our findings with Mr. G. Sorensen
and other members of yrur staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
j
the inspection. Within these areas, the inspection concisted of a selective
l
examination of procedures and representative records, observations, and in-
'
terviews with personnel.
l
During this inspection, certain of your activities appeared to be in non-
!
compliance with NRC requirements, as specified in enclosed Appendix A.
A
written response, submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter, the enclosures, and your response to this letter will be
,
!
placed in the NRC's Public Document Room.
If the enclosures contain any
i
information that you or your contractors believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this
office by telephone within seven (7) days from the date of this letter of
l
your intention to file a request for withholding; and (b) submit within
twenty-five (25) days from the date of this letter a written application
to this office to withhold such information. Section 2.790(b)(1) requires
!
l
l
s,.
8109150556 810902
PDR ADOCK 05000454
G
.
-
!
l
Commonwealth Edison Company
-2-
September 2, 1981
that any.such application must be accompanied by an affidavit executed by
the owner of the information which . tentifies the document or part sought
i
to be withheld, and which contains a full statement of the reasons which
are the bases for the claim that the information should be withheld from
public disclosure. This section further requires the statement to address
l-
with specificity the considerations listed in 10 CFR 2.790(b)(4). The.
information sought to be withheld shall be incorporated as far as possible
!
into a separate part of the affidavit.
If we do not hear from you in this
j
regard within the specified periods noted above, a copy of this letter,
l
the enclosures, and your response to this letter will be placed in the
l
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
I
Sincerely,
l
t
'
.
l
R. L. Spes,ard
ector
Division of Resident and
i
Project Inspection
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Reports
l
No. 50-454/81-12 and
j
No. 50-455/81-10
cc w/encls:
J. S. Abel, Director
of Nuclear Licensing
Gunner Sorensen, Site
Project Superintendent
'
V. I. Schlosser,
Project Manager.
l
R. E. Querio, Station
l
Superintendent
DMB/ Document Control Desk (RIDS)
Mary Jo Murray, Office of
Assistant Attorney General
Myron M. Cherry
,
RIII
RIII
III
RIII
RIIJ
,
'
hai
p
inds
a es
Kno
_ S/ s ard
8/2 /81
/, yj