ML20030D636
| ML20030D636 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 08/27/1981 |
| From: | Perch R Office of Nuclear Reactor Regulation |
| To: | Draper W GULF STATES UTILITIES CO. |
| References | |
| NUDOCS 8109140078 | |
| Download: ML20030D636 (4) | |
Text
f-a l
1 AUS 2 7 1981
/#/1e Occket Plos. 50-458 N
and 50-48io Q.
D
'Q h
6 V*
Dr. E. Linn Draner, JR.~
Vice President-Muclear Technolony N
A.
Gulf States Utilities Company-4f J [ 1/.o, P. D. Box 2051
~ '
Reaumont, Texas 77704
Dear Dr. Draper:
Subiect: Decuest for Additional infomation - River Bend Station t' nits 1 and 2 The Ifuman Factors Engineerinq Branch has identified a need for the control roon preliminary desion assessment, including drawings by June 1, 1932. This infomation is required to meet a tentatively planned three-day site visit by HFEB during July 1982.
By June 1, 1992, we also need to be informed on which of the attached criteria have been or will be met by the date of our site visit. Should you have any nuestions, please contact me.
Sincerely, Robert Perch, Project Manager Licensinq Branch rio. 2 nivision of Licensing
Attachment:
as stated Distribution:
nocket File LR32 nELO nEisenhut/R. Purple RTedesco ASchwencer RPerch
" Service IAE (1) hcc:
NRC Pnp Local DDR
'4S II.
gio9140078 810827 TERA PDRADocK05000Q ArRS (16)
A n
OFF8CE >........Y.'.
......N
-*. * * " =
DPerch '..do ASc w er sununue>
... /w/n1 R/ /n1 9
oan y Mc ronu ata oo-an meu em OFFICIAL RECORD COPY usam im-meo
f i
Docket Nos.
Sq-458 and Sn 459 Dr. E. Linn Draper, JR.
Vice President-fluclear Technology Culf States !!tilities Company P. O. Box 2n51 Reaumont, Texas 77704
Dear Dr. Draper:
Sub,iect: Request for Additional Infomation - River Bend Station linits 1 and 2 The lluman Factors Engineering Branch has identified a need for the control room preliminary desiqn assessment, including drawings by June 1, 199. This infomation is required to meet a tentatively planned three-day site visit by llFEB during July 1982.
By June 1, 1%2, we also need to be infomed on which of the attached criteria have been or will be met by the date of our site visit. Should you have any ouestions, please contact our-Project 1anagerenc e
Sincerely, w
Ro rt L.r odesco,< Assistant Director (Divi jon of -ice'nsin(7 f
Lice ing /
/
g
Attachment:
As stated nistribution:
nocument Control Desk LBF2 OELn nEisenhut/R. purnle R. Tedesco A. Schwencer RPerch MService IAE (3) hCCs:
NRC pnrt 3i Local pnq
., p g 1,
NSTC
'D TFDA
< f.< c g
AcnS onggy
... g. 2..
32.. /
LB8 orncry
......L..B...A sunucur >..REerch..dn.
...4.ch.we n,ce r,
,.R,T,e, f...cg,,,
e om)...8/M/81.........W.)bf.S.L.......;81 I nne ronu ais oow sacu ono OFFICIAL RECORD COPY usam wo-m m
- q...n.
. Dr. E. Linn Draper, Jr.
Vice President - Nuclear Technology Gulf States Utilitics Company
~~~
P. O. Box 2951 Beaumont, Texas 77704 cc: Troy B. Conner, Jr., Attorney Conner andWetterhahn Suite 1050 1747 Pennsylvania Avenue, N. W.
Washington, D. C.
20006 Mr. J. E. Booker Manager - Technical Programs Gulf States Utilities Company P. O. Box 2951 Beaumont, Texas 77704 Stanley Plettman, Attorney Orgain, Bell & Tucker Beaumont Savings Building Beaumont, Texas 77701 Karin P. Sheldon, Esq.
Sheldon; Harmon & Weiss 1725 I Street, N. W.
Washington, D. C. 20006 William J. Guste, Jr., Esq.
Attorney General State of Louisiana Post Office Box 44005 State Capitol Baton Rouge, Louisiana 70804
\\
Richard M. Troy, Jr., Eso.
Assistant Attorney Ger.eral in Charge State of Louisiana Department of Justice 234 Loyola Avenue New Orleans, Louisiana 70112
~
h,....
3/*
"TTACH.EUT( 1
- .e
~
CRITERIA FOR DETEP.".!!:I!:G WHETHEP. A PLrW IS F.EADY FOR 071 NT0L CP.IR (5 DAY) 1.
Overall CR construction and checkout is 85 to 90 percent complete,
-~-
except that installation and checkout of ESF system controls and dis-plays are 100 percent cer.plete.
2.
At least 80 percent of all systems, (including 100 percent of ESF systems) have been turned. over to the operating staff.
3.
Normal and emergency lighting systems are operational.
4.
Air conditicaing and ventilation system is operational.
5.
Control boards and display panel installation is ap' proximately 100 percent canplete with essentially na holes in panels due to missing chassis or components.and with power to illuminate controls and dis-pl ays.
- 6. -
Emergency operating procedures (EOPs) are complete to permit a H. F.
evaluation of the E0P using trained and licensed operators.
7.
Applicant should have available as a minimum, of 3 (three) licensed operators to assist NRC during the CRDR.
All* annunciators should bel operational to pennit evaluation of 8.
a'nd sequential operation, readibility of alarm windows, and measure-ment of all individual alarm sound levels.
9.
Remote shutdown panel should be 80 to 90 percent 'omplete and available c
for Human Factors review.
10.*
Incore t_hermocouple displays and subcooling monitor displays shduld be available~ for NRC review in the control room.
11.
Applicant's preliminary control room assessment must be submitted to the NRC at least one month prior to our visit.
12.
Control room layout drawings included with. item 11 above.
13.
Emergency oper'ating procedures (EOPs) must be submitted to the NRC (PTRB) at least sie (6). weeks prior to our visit. This schedule must be met to permit joint' HFEB/PTRB review of E0Ps. Failure to meet this criterit cou7d delay visits and SER inputs.
Aoplies to PWRs only.
b
r-gg.
. 2-
~
14.
Process computer and all peripherals are operational and cecilable.
for Human Factor Review.
15.
Operator workspace and environment are similhr to what will be when operating and can be Human Factor reviewed.
O e
s
/
i
'f 4
8 b
i e
.M O'
e a
.5 4*.
$=
eh i
~
d l
1 i
~ ~..
i i
i 4
0 4
l t*
i e
6 9
-- -