Forwards IE Insp Repts 50-348/81-11 & 50-364/81-14 on 810513-0615 & Notice of Violation
ML20030D572
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/09/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20030D562 List:
References
NUDOCS 8109010541
Download: ML20030D572 (2)


See also: IR 05000348/1981011

Text

.

OFFICIAL COPY

4

UNITED STATES

MM

e

NUCLEAR REGULATORY COMMISSION

[

,

REGION 11

-

r

101 MARIETTA ST N.W SUITE 3100

o

ATLANTA, GEORGIA 30303

  • p*

.....

JUL 0 91981

Alabama Power Company

AiTN: Mr. R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

.

Gentlemen:

Subject: Report Nos. 50-348/81-11 and 50-364/81-14

This refers to the routine safety inspection conducted by Mr. W. H. Bradford of

this office on May 13 through June 15, 1981, of activities authorized by NRC

Operating License Nos. NPF-2 and NPF-8 for the Farley 1 and 2 facility. Our

preliminary findings were discussed with Mr. W. G. Hairston, Plant Mar.ager at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790 of the Commis'sion's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a)

9tify this

,

office by telephone within ten days from thi date of this letter

your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such information. If your receipt of this letter has been delayed such

that less than seven day, are available for your review, please notify this

'

office promptly so that a new due date may be established.

Consistent with

section 2.790(b)(1), such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is. claimed that the information should be withheld from public

~

disclosure.

This section further requires the statement to address wi s.i

specificity the considerations listed in 10 CFR 2.790(b)(4). The information

.

8109010541 810814~

PDR ADOCK 05000348

0

PDR

_ _ _

.

~'

l,

JUL 0 91981

.

Alabama Power Company

2

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

aul J. Kellg , Acting Ckief

Project Bra (ch{2, Division of Resident

and Reactor Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-348/81-11

and 50-364/81-14

cc w/ encl:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr. , Senior Vice President

H. O. Thrash, Manager-Nuclear Generation

0. D. Kingsley, Jr. , Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Operations

Quality Assurance

W. G. Hairston, III, Plant Manager

W. C. Petty, Manager-Quality Assurance

(Design and Construction)

R. E. Hollands, Jr. , QA Supervisor

.

9

_-____