ML20030D572
| ML20030D572 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/09/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20030D562 | List: |
| References | |
| NUDOCS 8109010541 | |
| Download: ML20030D572 (2) | |
See also: IR 05000348/1981011
Text
.
OFFICIAL COPY
4
UNITED STATES
MM
e
NUCLEAR REGULATORY COMMISSION
[
,
REGION 11
-
- r
101 MARIETTA ST N.W SUITE 3100
o
ATLANTA, GEORGIA 30303
- p*
.....
JUL 0 91981
Alabama Power Company
AiTN: Mr. R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
.
Gentlemen:
Subject: Report Nos. 50-348/81-11 and 50-364/81-14
This refers to the routine safety inspection conducted by Mr. W. H. Bradford of
this office on May 13 through June 15, 1981, of activities authorized by NRC
Operating License Nos. NPF-2 and NPF-8 for the Farley 1 and 2 facility. Our
preliminary findings were discussed with Mr. W. G. Hairston, Plant Mar.ager at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790 of the Commis'sion's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a)
9tify this
,
office by telephone within ten days from thi date of this letter
your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information. If your receipt of this letter has been delayed such
that less than seven day, are available for your review, please notify this
'
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is. claimed that the information should be withheld from public
~
disclosure.
This section further requires the statement to address wi s.i
specificity the considerations listed in 10 CFR 2.790(b)(4). The information
.
8109010541 810814~
PDR ADOCK 05000348
0
_ _ _
.
~'
l,
JUL 0 91981
.
Alabama Power Company
2
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
aul J. Kellg , Acting Ckief
Project Bra (ch{2, Division of Resident
and Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-348/81-11
and 50-364/81-14
cc w/ encl:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr. , Senior Vice President
H. O. Thrash, Manager-Nuclear Generation
0. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-Operations
Quality Assurance
W. G. Hairston, III, Plant Manager
W. C. Petty, Manager-Quality Assurance
(Design and Construction)
R. E. Hollands, Jr. , QA Supervisor
.
9