Forwards IE Insp Rept 50-483/81-17 on 810727-31.No Noncompliance Noted
ML20030D543
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/20/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
Shared Package
ML20030D544 List:
References
NUDOCS 8109010512
Download: ML20030D543 (2)


See also: IR 05000483/1981017

Text

- ____

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

/'+.* * * c%'

.

,

.

o

UNITED STATES

!"*,

-- .t'

1,

NUCLEAR REGULATORY COMMISSION

$

, [ [E

REGION 111

p

799 ROOSEVELT ROAD

j"

GLEN ELLYN,ILLINots 60137

  • ....

August 20, 1981

Docket No. 50-483

Union Electric Company

ATTN:

Mr. John K. Bryan

Vice President - Nuclear

Post Office Box 149

St. Louis, MO '3166

Gentlemen:

This refers to t'ae routine safety inspection conducted by hr. J. H. Neisler

of this office on July 27-31, 1981, of ctivities at Callaway, Unit 1,

Construction Site, authorized by NRC Construction Permit No. CPPR-139 and

to the discussion of our findings with Messrs. Weber, Powers and others

of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection :onsisted of a selective

examination of procedures end representative records, observations, and

interviews with personnel.

No items of noncompliance with hTC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 V the Commission's regulations, a copy

of this lettv and the enclosed inspection report will be placed in the

NRC's Public Jocument Rcom.

If this report contains any information that

you or your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you fa) notify this office by telephone

within seven (7) days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information. Section 2.790(b)(1) requires that any such

,

application must be accompanied by an affidavit executed by the owner of

the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons which are the bases

for the claim that the information should be withheld from public disclosure.

60

!

pv

  1. }c

%$ '

9

ili

4 '}

12

9-

n

0

-

r

4

  • P

AI

8109010512 810820

-

M

4 Th f t*

PDR ADOCK 05000483

/

G

PDR

W

,

...

)

, - - _ _

. . - _ .

_ - - _ - .

.

.

.

1

Union Electric Company

-2-

AUS 2 0 hrdt.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

'

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

i

inspection report will be placed in the Public Document Room.

.

l

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

O -l

v

& n. dr*m

R. L. Spessar'd, Director

Division of Resident and

7f-ject Inspection

Enclosure:

IE Inspection

Report No. 50-483/81-17

cc w/ encl:

W. H. Weber, Manager

Nuclear Construction

DMB/ Document Control Desk (RIDS)

'

Resident Inspector, RIII

,

Region IV

!

K. Drey

Ronald Fluegge, Utility

Division, Missouri Public

Service Commission

I

,

!

i

RIII

RII

RIII IS

RII

ei

1

b

o

in

Kno

Spe ard

g/(J/ffI-

gp3[8f

l/81

g

-

-

-

-

-

-

- - -

-

--