Forwards IE Insp Rept 50-346/81-12 on 810601-30 & Notice of Violation
ML20030D430
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/20/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20030D431 List:
References
NUDOCS 8109010385
Download: ML20030D430 (2)


See also: IR 05000346/1981012

Text

-_

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_

_.

__

' *

.

.

AUG 2 0 bol.

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. Richard P. Crouse

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, Oil 43652

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. L. A. Reyes

and W. G. Rogers of this office on June 1-30, 1981, of activities at Davis-Besse

Nuclear Power Station, Unit 1, auti.orized by NRC Operating License No. NPF-3 and

to the discussion of our findings with Mr. T. Murray at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

The inspection showed that action had been taken to correct the identified

noncompliance and to prevent recurrence. Consequently, no reply to this

noncompliance is required and we have no further questions regarding this

matter at this time.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room. If this report contains any ini.irmation that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this 1:.tter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

S'f'Yll,#

-

-

e, y& ' *

fGol

y

//

'

r.

-

r

k

O'

l

gN

8109010385 810820

'

'

gDRADOCK05000

..G Qf fb

)

.

.

.

.

Toledo Edison Company

-2-

August 20, 1981

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the considerations iisted

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be in-

corporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

(3 /

'

.l$.// jct;).v/N

R. L. Spess rd, Director

Division of Resident and Project

Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspecthn Report

No. 50-346/81-12

cc w/encls:

T. D. Murray, Station

Superintendent

DMB/ Document Control Desk (RIDS)

,

Resident Inspector, RIII

l

Harold W. Kohn, Power

l

Siting Commission

Helen W. Evans, State of Ohio

l

l

l

RIII

RIII

RJII

RIII

RII

A ' h p f^l

/krr&lcv,

A7nfby

h(

l'

Rogers /so

Reyes

McGregor

Knop

S/ebard

[j cp

7/27/81

-

- - - - - ------

- ----- -

-

- - - - - - -