ML20030D430
| ML20030D430 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/20/1981 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Crouse R TOLEDO EDISON CO. |
| Shared Package | |
| ML20030D431 | List: |
| References | |
| NUDOCS 8109010385 | |
| Download: ML20030D430 (2) | |
See also: IR 05000346/1981012
Text
-_
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_
_.
__
' *
.
.
AUG 2 0 bol.
Docket No. 50-346
Toledo Edison Company
ATTN:
Mr. Richard P. Crouse
Vice President
Nuclear
Edison Plaza
300 Madison Avenue
Toledo, Oil 43652
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. L. A. Reyes
and W. G. Rogers of this office on June 1-30, 1981, of activities at Davis-Besse
Nuclear Power Station, Unit 1, auti.orized by NRC Operating License No. NPF-3 and
to the discussion of our findings with Mr. T. Murray at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A.
The inspection showed that action had been taken to correct the identified
noncompliance and to prevent recurrence. Consequently, no reply to this
noncompliance is required and we have no further questions regarding this
matter at this time.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room. If this report contains any ini.irmation that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this 1:.tter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
mation. Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
S'f'Yll,#
-
-
e, y& ' *
fGol
y
//
'
r.
-
r
k
O'
l
gN
8109010385 810820
'
'
gDRADOCK05000
..G Qf fb
)
.
.
.
.
Toledo Edison Company
-2-
August 20, 1981
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons on the basis which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations iisted
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be in-
corporated as far as possible into a separate part of the affidavit.
If
we do not hear from you in this regard within the specified periods noted
above, a copy of this letter and the enclosed inspection report will be
placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
(3 /
'
.l$.// jct;).v/N
R. L. Spess rd, Director
Division of Resident and Project
Inspection
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspecthn Report
No. 50-346/81-12
cc w/encls:
T. D. Murray, Station
Superintendent
DMB/ Document Control Desk (RIDS)
,
Resident Inspector, RIII
l
Harold W. Kohn, Power
l
Siting Commission
Helen W. Evans, State of Ohio
l
l
l
RIII
RIII
RJII
RIII
RII
A ' h p f^l
/krr&lcv,
A7nfby
h(
l'
Rogers /so
Reyes
McGregor
Knop
S/ebard
[j cp
7/27/81
-
- - - - - ------
- ----- -
-
- - - - - - -