Forwards IE Insp Rept 50-416/81-25 on 810625-26,0706-10 & 13-17.No Noncompliance Noted
ML20030D420
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/31/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20030D421 List:
References
NUDOCS 8109010369
Download: ML20030D420 (2)


See also: IR 05000416/1981025

Text

'

\\)lD LO

'

a

.

JUl. 31 19 "

,

&

,g-1

,WLl %-

,

.

n.

Mississippi Power and Light Company

"gg 3 1193) > _@,

ATTN: Mr. N. L. Stampley

c

Vice President of Production

(

-

p '-

  • T anen

P. O. Box 1640

-

.

h

'

Jackson, MS 39205

Gentlemen:

[

Subject: Report No. 50-416/81-25

This refers to the routine safety inspection conducted by Mr. P. A. Taylor and

G. L. Paulk of this office on June 25-26, July 6-10 and July 13-17, 1981, of

activities authorized by NRC Construction Permit No. CPPR-116 for the Grand Gulf

facility and to the discussion of our findings held with Mr. C. K. McCoy, Plant

Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

~

Within the scope of this inspection, no violations or deviations were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be e<amined during subsequent inspections.

l

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Documor.t Room.

If the report contains any information that you believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this office

by telephone within ten days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five days from the

date of this letter a written appli::ation to this office to withhold such informa-

tion.

If your receipt of this letter has been delayed such that less than seven

days are available for your review, please notify this office promptly so that a

new due date may be established. Consistent with section 2.790(b)(1), such

application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

as far as po sible into a separate part of the affidavit.

If we do not hear from

'

you in this regard within the specified periods noted above, the report will be

placed in the Fub1;c Document Room,

e

fp'#!

8109010369 810731'

PDR ADOCK 05000416

&s

G

PDR.

$ '

'. -

JUL 311981

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

J]

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report No. 50-416/81-25

cc w/ encl:

C. K. ficCoy, Plant !!anager

bcc w/ encl:

NRC Resident Inspector

Document fianagement Branch

State of !!ississippi

RII

RA1,{v

.

RII

(fat

GeU~

PTaylor:dt/gr

FSCantrell

RCL w1s

7/Ti/81

7/3//81

7/p/81