Text
'
\\)lD LO
'
a
.
JUl. 31 19 "
,
&
,g-1
,WLl %-
,
.
n.
Mississippi Power and Light Company
"gg 3 1193) > _@,
ATTN: Mr. N. L. Stampley
c
Vice President of Production
(
-
p '-
- T anen
P. O. Box 1640
-
.
h
'
Jackson, MS 39205
Gentlemen:
[
Subject: Report No. 50-416/81-25
This refers to the routine safety inspection conducted by Mr. P. A. Taylor and
G. L. Paulk of this office on June 25-26, July 6-10 and July 13-17, 1981, of
activities authorized by NRC Construction Permit No. CPPR-116 for the Grand Gulf
facility and to the discussion of our findings held with Mr. C. K. McCoy, Plant
Manager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
~
Within the scope of this inspection, no violations or deviations were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be e<amined during subsequent inspections.
l
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Documor.t Room.
If the report contains any information that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this office
by telephone within ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written appli::ation to this office to withhold such informa-
tion.
If your receipt of this letter has been delayed such that less than seven
days are available for your review, please notify this office promptly so that a
new due date may be established. Consistent with section 2.790(b)(1), such
application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as po sible into a separate part of the affidavit.
If we do not hear from
'
you in this regard within the specified periods noted above, the report will be
placed in the Fub1;c Document Room,
e
fp'#!
8109010369 810731'
PDR ADOCK 05000416
&s
G
PDR.
$ '
'. -
JUL 311981
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
J]
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report No. 50-416/81-25
cc w/ encl:
C. K. ficCoy, Plant !!anager
bcc w/ encl:
NRC Resident Inspector
Document fianagement Branch
State of !!ississippi
RII
RA1,{v
.
RII
(fat
GeU~
PTaylor:dt/gr
FSCantrell
RCL w1s
7/Ti/81
7/3//81
7/p/81