ML20030D404

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-373/81-27 on 810805-07.No Noncompliance Noted
ML20030D404
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 08/19/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20030D405 List:
References
NUDOCS 8109010357
Download: ML20030D404 (2)


See also: IR 05000373/1981027

Text

.

,

.

Apq * 9 mRf

ip&.*rIr -

. \\

r

Docket No. 50-373

4

\\

Commonwealth Edison Company

4

o)

ATTN:

Mr. Cordell Reed

e*

-

Vice President

by

//

,

Chicago, IL 60690

.

4

,K

Post Office Box 767

.\\.y

-

Gentlemen:

This refers to the routine safety inspection conducted by Mr. D. E. Miller

of this office on August 5-7, 1981, of activities at LaSalle County

Nuclear Station, Unit 1, authorized by NRC Construction Permit No. CPPR-99

and to the discussion of our findings with Mr. Bishop and others at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

int e rviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Fublic Document Room.

If this report contains any information that

ycu or your contractors believe to be exempt from disclosure un Jer 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within seven (7) days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

l

withhold such information.

Section 2.790(b)(1) requires that any such

applicat. ion must be accompanied by an affidavit executed by the owner of

the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons which are the bases

for the clain that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

3 s

//

l

l

l

0109010357 81ogg9 ~

DR ADOCK 05000373

-

.

ECL

.

7

)

.

Commonwealth Edison Company

-2-

AUG 191981

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

{ i. Marb

C. E. Norclius, Director

Division of Engineering and

Technical Inspection

Enclosure:

IE Inspection

Report No. 50-373/81-27

cc w/ encl:

Louis 0. DelGeorge

Director of Nuclear

Licensing

L. J. Burke, Site

Construction Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Supetictendent

B. B. St.ephenson

Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

R

RIII

RI/I

RITI

hru

y

Mi

r/db

reger

eimann

. O eliu-

8/17/81

'g//7

g,Jg

-_-

- - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _