ML20030D397

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-295/81-19 & 50-304/81-15 on 810812.No Noncompliance Noted
ML20030D397
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 08/19/1981
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20030D398 List:
References
NUDOCS 8109010351
Download: ML20030D397 (2)


See also: IR 05000295/1981019

Text

W .

l

9L

-

.

1

August 19, 1981

$ \\).

. ,

Docket No. 50-2

4

[9

Docket No.

\\

Commonwealth Edison Company

-

W, \\

9-

.

g

'

,,

ATTN:

Mr. Cordell Reed

A

Vice President

Ci

//

Post Office Box 767

fkg g.O

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. M. P. Phillips

of this office on August 12, 1981, of activities at Zion Nuclear Generating

Station, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-39 and

No. DPR-48 and to the discussion of our findings with Mr. G. Plim1 and others

of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies the area examined

during the inspection. Within this area, the inspection consisted of a

selective examination of procedures and representative records, observa-

tions, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the hTC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

[c,07

s

/I

8109010351 810819

PDR ADOCK 05000295

C

PDR

_

v

,

I

Commonwealth Edison Company

2-

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons which are the bases for the claim that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

i t. 10 CFR 2.s90(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning titis inspection.

Sincerely,

'

VL

u

7

o t,

J. A. Hind, Director

^

/

Division of Emergency Prepardness

and Operational Support

Enclosure:

IE Inspection

Reports No. 50-295/81-19

and No. 50-304/81-15

cc w/ encl:

Louis 0. DelGeorge

Director of Nuclear

Licensing

K. Graesser, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

RIII

RII

S

l:

RIII l

09[

,

I

III

w'

<v

.

\\>'-M /

/'ello

Hayes

d

s

  • p') ips/jp

on

Pf

,I J

,

,

8/18/81

/

F/

f//9h/