i
f's l ps
8
V,,,
..
JUL 311981
A
{:
AUG 311981 * ~E
=ama .O
-' u,
w =ess
e'*
Georgia Power Company
'
ATTN: Mr. J. H. Miller, Jr.
'1.
Executive Vice President
p).
'
270 Peachtree Street
m
Atlanta, GA 30303
Gentlemen:
T
i
Subject: Report Nos.60-321/81 iband 50-366/P1-17
This refers to the routine safety inspection conducted by Mr. G. A. Belisle anu
,
'
others of this office on June 29 - July 2,1981, of activities authorized by NRC
Operating License No. DPR-57 and License No. NPF-5 for the Hatch facility and to
the discussion of our findings held with Mr. C. F. Whitmer, Vice President, and
Mr. T. V. Greene, Assistant Plant Manager, at the conclusion of the inspet. tion.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
W't in these areas, the inspection consisted of
selective examinations of prccedures and representative records, interviews with
personnel, and observations oy the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
l
in the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Fublic Document Room.
If the report contains any information that you believe to be exempt from disclo-
I
sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by
telephone within ten days from the date of this letter of your intention to file
l
a request for withholding; and (b) submit within twer.t.y-five days from the date
i
of this letter a written application to this office to withhold such information.
l
If your receipt of this letter has been delayed such that less than seven days
l
are available for your review, please notify this office promptly so that a new
l
due date may be established. Consistent with section 2.790(b)(1), such applica-
tion must be accompanied by an affidavit executed by the owner of the information
which identifies the document or part thereof sought to be withheld, and a full
l
statement of the reasons on the basis of wh;ch it is claimed that the information
l
should oe withheld from public disclosure.
This section further requires the
statement to address with specificity the considerations listed in 10 CFR 2.790-
(b)(4). The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
!f we do not hear from you in
this regard within the specified periods noted above, the report will be placed
in the Public Document Room.
gRADOCK09010174 810731
i
05000321
4g
$
O
l
-
- -.
- .
.
- --. -
.
--
.-
--.
-
.
.
.
,
Georgia Power Company
2
DOL 0 I 1981
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
N
P. J. Kellogg, Acting Chief
Reactor Projects Branch #2
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report Nos. 50-321/81-17
and 50-366/81-17
cc w/ encl:
J. T. Beckham, Vice President and
General Manager-Nuclear Generation
M. Manry, Plant Manager
C. E. Belflower, Site QA Supervisor
bcc w/ enc 1:
NRC Resident Inspector
Hugh S. Jordan, Executive Secretary
Central Files
Local Public Document Room
Washington Public Document Rocm
Nuclear Safety Information Center
Technical Information Center
Document Management Branch
State of Georgia
!
,
,
, GABelisle:ht
right
RMurp.y
AFGi: son
VBrownlee
PJK
ogg
4
7/n/81
7
81