Forwards IE Insp Repts 50-338/81-17,50-339/81-14 & 50-404/81-01 on 810720-24.No Noncompliance Noted.New Unresolved Item Re Svc Water Reservoir Will Be Examined During Subsequent Insp
ML20030D279
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 08/07/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20030D280 List:
References
NUDOCS 8109010112
Download: ML20030D279 (2)


See also: IR 05000338/1981017

Text

.

.

,

AUG 0 71981

-

,O

N d* *'V3 9(@

g

Virginia Electric and Power Company

ATTN:

Mr. R. H. Leasburg, Vice President

g

,quG 311981 >

Nuclear Operations

g

uisas 7

P. O. Box 26666

s=*'***

-

-

Richmcnd, VA 23261

%A

h

Gentlemen:

ps

Subject: Report Nos. M, 50-339/81-14 and 50-404/81-01

This refers to the routine safety inspection conducted by Mr. J. R. Harris of

this office on July 20-24, 1981, of activities authorized by NRC License No.

NPF-4 and Construction Permit Nos. CPPR-78 and CPPR-114 for the No th Anna Power

Station facility and to the discussion of our findings held witi. Mr. P. G. Perry,

Site Manager, at the conclusion of the inspection.

.

Areas examined during the inspection and our findings are discussed in tFe

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviess with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

encicsed report. This item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the encicsed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from disclo-

sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by

telephone within ten days from the date of this letter of your intention to file

a request for withholding; and (b) submit within twenty-five days from the date

of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven days

are available for your review, please notify this office promptly so that a new

due date may be established. Consistent with section 2.790(b)(1), such applica-

tion must be accompanied by an affidavit executed by the owner of the information

which identifies the document or part thereof sought to be withheld, and a full

statement of the reasons on the basis of which it is claimed that the information

should be withheld from public disclosure.

This section further requires the

statement to address with specificity the considerations listed in 10 CFR 2.790-

(b)(4).

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit. If we do not hear from you in

this regard within the specified periods noted above, the report will be placed

in the Public Document Room.

.

8109010112 810007

PDR ADOCK 05000338

i( l

G

PDR

L t

.-.

~

_

.

. _ _ _ _ _

, _ _ _

- - _

- - . _

,

_ _ _ .

'

'

.

,

Virginia Electric and Power Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

5/

P. J. Kellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspect 'on

Enclosure:

Inspection Report Nos. 50-338/81-17,

50-339/81-14 and 50-404/81-01

cc w/ encl:

J. H. Ferguson, Executive

Vice President

W. R. Cartwright, Station Manager

bec w/ encl:

Document Management Branch

Commonwealth of Virginia

l

RI

RI

R

RII

RII

RII

J

d ar is:ht

TECon1 n

CEMurphy

AfG

n

MSh

q ,' DJ

ogg

@/(< /81

1/(g/81

f'/L/81

f/$ /81

'7] /81

7/ /81