ML20030D259
| ML20030D259 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 08/19/1981 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML20030D260 | List: |
| References | |
| NUDOCS 8109010083 | |
| Download: ML20030D259 (2) | |
See also: IR 05000329/1981017
Text
l
[ps Eco #o
e
UNITED STATES
8'
I,t
NUCLEAR REGULATORY COMMISSION
.
$
aE
REGION 111
,
o,
% . .b/
g*g*
799 ROOSEVELT ROAD
GLEN ELLYN,lLLINOIS 60137
...
August 19, 1981
Docket No. 50-329
Q\\ g 7/ ,/
Docket No. 50-330
Consumers Power Company
dy
h
ATTN:
Mr. James W. Cook
v
\\
Vice President
g. $
,g
Midland Project
4v
-
-
-
'
1945 West Parnall Road
N
Jackson, MI 49201
4
/
A
Gentlemen:
D
l}i \\
This refers to the routine safety inspection conducted by Mr. R. J. Cock of
this office on July 1-31, 1981, of activities at the Midland Nuclear Power
Plant Construction Site authorized by NRC Construction Permits No. CPPR-81
and No. CPPR-82 and to the discussion of our findings with Mr. D. M. Turnbull
and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspetrion. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified-during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the hTC's
Public Document Room.
If this report contains any infonnation that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify th.s office by telephone within seven (7)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
i
this letter a written application to this office to withhold such infor-
mation. Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
l
a full statement of the reasons which are the bases for the claim that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
N
s
Il
.
8109010083 810819
PDR ADOCK 05000329
O
_
__
,
._
. . .
s
_.
_
.s
p.'
g-
g
()
.Q. . .
Q
Q
Q~
4~.-
-
. ' . , , .
..4
Constaaers Power Company
-2-
August 19, 1981
in 10 CFR 2.790(b)(4) . The information sought to % withheld shall be
'
incorporated as far as possible into a separate part of the affidavit. If
ue do not hear from you in this regard within the specified periods noted
above, a copy of this letter and the enclosed inspection report vill be
pisced in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
/
w).w V
R. L. Spessar
Director
Division of Re ident and
Project Inspection
Enclosua : IE Inspection
Report Nos. 50-329/81-17
and No. 50-330/81-17
cc w/ enc 1:
IMB/ Document Control Desk (RIDS)
Resident Iu pector, RIII
Ronald Callen, Michigan
Public Service Comunission
Myron M. Cherry, Chicago
h
omet )
KIII
1
RIII
RIII,
,
, JII
,,,
,,
,
,
, ,, , , ,, ,
,
$ " '"*> . . . .C,vpkJ
Boyd,'
cf
,Kggp,
, Spfha
,,
,
,
,, . ,
, , ,
,
""4 od.WW.
.
$\\. .
,
.. . . . . .
.
.. .. -
..
. ..
. .. ...
" 'u- 29 824
fJRC FORM 31H ito 60l NRCM O240
OFFICIAL RECORD L OPY