Forwards IE Insp Repts 50-329/81-17 & 50-330/81-17 on 810701-31.No Noncompliance Noted
ML20030D259
Person / Time
Site: Midland
Issue date: 08/19/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20030D260 List:
References
NUDOCS 8109010083
Download: ML20030D259 (2)


See also: IR 05000329/1981017

Text

l

[ps Eco #o

e

UNITED STATES

8'

I,t

NUCLEAR REGULATORY COMMISSION

.

$

aE

REGION 111

,

o,

% . .b/

g*g*

799 ROOSEVELT ROAD

GLEN ELLYN,lLLINOIS 60137

...

August 19, 1981

Docket No. 50-329

Q\\ g 7/ ,/

Docket No. 50-330

Consumers Power Company

dy

h

ATTN:

Mr. James W. Cook

v

\\

Vice President

g. $

,g

Midland Project

4v

-

-

-

'

1945 West Parnall Road

N

Jackson, MI 49201

4

/

A

Gentlemen:

D

l}i \\

This refers to the routine safety inspection conducted by Mr. R. J. Cock of

this office on July 1-31, 1981, of activities at the Midland Nuclear Power

Plant Construction Site authorized by NRC Construction Permits No. CPPR-81

and No. CPPR-82 and to the discussion of our findings with Mr. D. M. Turnbull

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspetrion. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified-during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the hTC's

Public Document Room.

If this report contains any infonnation that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify th.s office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

i

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

l

a full statement of the reasons which are the bases for the claim that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

N

s

Il

.

8109010083 810819

PDR ADOCK 05000329

O

PDR

_

__

,

._

. . .

s

_.

_

.s

p.'

g-

g

()

.Q. . .

Q

Q

Q~

4~.-

-

. ' . , , .

..4

Constaaers Power Company

-2-

August 19, 1981

in 10 CFR 2.790(b)(4) . The information sought to % withheld shall be

'

incorporated as far as possible into a separate part of the affidavit. If

ue do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report vill be

pisced in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/

w).w V

R. L. Spessar

Director

Division of Re ident and

Project Inspection

Enclosua : IE Inspection

Report Nos. 50-329/81-17

and No. 50-330/81-17

cc w/ enc 1:

IMB/ Document Control Desk (RIDS)

Resident Iu pector, RIII

Ronald Callen, Michigan

Public Service Comunission

Myron M. Cherry, Chicago

h

omet )

KIII

1

RIII

RIII,

,

, JII

,,,

,,

,

,

, ,, , , ,, ,

,

$ " '"*> . . . .C,vpkJ

Boyd,'

cf

,Kggp,

, Spfha

,,

,

,

,, . ,

, , ,

,

""4 od.WW.

.

$\\. .

,

.. . . . . .

.

.. .. -

..

. ..

. .. ...

" 'u- 29 824

fJRC FORM 31H ito 60l NRCM O240

OFFICIAL RECORD L OPY