ML20030D090

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-295/81-18 & 50-304/81-14 on 810730.No Noncompliance Noted
ML20030D090
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 08/14/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20030D091 List:
References
NUDOCS 8108310376
Download: ML20030D090 (2)


See also: IR 05000295/1981018

Text

.

.

.

.

AUG 1 41081

[*

y ,8G{ f

Docket No. 50-295

g

Docket No. 50-304

y

  • >UG 31 gggg -8

j 4 ses,%

Commonwealth Edison Conpr..;y

ATTN:

Mr. Cordell Reed

\\

%=nen N

Vice President

\\

Post Office Box 767

%

Chicago, IL 60690

iQi.

Gentlemen:

This refers to the routine safety inspection conducted by Mr. W. J. Key

of this office on July 30, 1981, of activities at Zion Station, Units 1

and 2, authorized by NRC Operating Licenses No. OPR-39 and No. DPR-48 and

to the discussion of our findings with Mr. R. Shannon at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

j

this letter and the enclosed inspection report will be placed in the NPC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold sech infor-

mation. Section 2.790(b)(1) requires that any such application must be

,

l

accompanied by an affidavit executed by the owner of the information which

identifies the document or part cought to be withheld, and which contains

i

a full statement of the reasons which are the bases for the claim that the

l

information should be withheld from public disclosure. This section further

i

requires the statement to address with cpecificity the considerations listed

!

1

I

$5'Of

Sij

l

1

8108310376 810814'~

,

gDRADOCK 03000295

l

PDR

_ - _ _ _ ~

- _ _ .

_ . _ _ . . - _ _ . _

_ _ _ _

-

~ . - . - _

.

_

A

!

.

.

.

.

!

Commonwealth Edison Company

-2-

lAUG 14198)

'

i

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection , report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/}Ll/ h 'J W

Y'.

C. E. Norelf.:s, Director

Division of Engineering and Technical

Inspection

Enclosure:

IE Inspection

Reports No. 50-295/81-18

and No. 50-304/81-14

,

cc w/ enc 1:

Louis 0. De1 George

Director of Nuclear

i

Licensing

K. Graesser, Station

i

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

!

!

!

,

!

RIII

RIII

RIJI

RIII

/R/

E

-

/

6th

(k )

V

y

/vfd5

en

Williams

Nore us

ey so

Danje

8/12/81

f//3//}/

gg 9)2(/

'l

_ . .

-.l.

_

__ -

. _ _ ,

- -

. . .

. _ _ _ _ . _ _ . _ . . . _ . _ . _ . _ . _ . . - . _ , . . - . _ . _ _ . . _ . _ _ - _

.