l Enclosure to Serial: RSEP/81-1363 Page 1 of 4 i
OPERATING DATA REPORT i.
l DOCKET No: DPR-23 DATE: 810804 w
COMPLETED BY: M. Watford TELEP110NE: 803-383-4524 l
l 0P_ERATING STATUS Notes:
- 1. Unit Name:
H. B. Robinson Unit Two There are presently 113 spent fuel l
- 2. Reporting Period: 810701, 0000/810731. 2400 assemblies in the spent fuel pit.
i
- 3. Licensed Thermal Power (1ut): 2300 j
- 4. Nameplate Rating (Cross Mue): 739 i
- 5. Design Electrical Rating (Net INe):.]00 i
- 6. Maximum Dependable Capacity (Cross IMe): 700 l
- 7. Maximum Dependable Capacity (Net FMe):
665 j
- 8. If Changes occur in capacity Ratings (Item Number 3 through 7) Since Last Report, Give l
Reasons: No change.
I i
- 9. Power Level to Ubich Rentricted, If Any (Net IMe): 2200 l'Mt
- 10. Reasons For Restrictions, If Any: Although the unit is not restricted by any outside agency, the power level is presently reduced to 2200 FMt due to steam generator j
considerations.
l This Month Yr.-to-Date Cumulative 11.11ours in Reporting Period 744 5087 91.253 __
- 12. Number of Hours Reactor Was Critical 711.30 4301.24 70.06,6d2
- 13. Reactor Reserve Shutdown Hours 0.00 107.42 1.085.30
- 14. Ilours Generator on-Line 707.51 4216.41 68.375_.2_3 i
- 15. Unit Reserve Shutdown Hours 0.00 0.00 23.2_0
- 16. Cross Thermal Energy Generated (13G1)
_1,523,327 9,083,339 140,295.713 l
- 17. Cross Electrical Energy Cencrated (?MH) 458,831
_2,883,158 45,221,925
- 18. Net Electrical Energy Generated (?nal) 434,244 2,732,210 4J,848,662 l
- 19. Unit Service Factor 95.10 82.89 74.93 l
- 20. Unit Availability Factor 95.10 82.89 7_4.95
- 21. Unit Capacity Factor (Using MDC Net) 87.77 80.77 70.61
- 22. Unit Capacity Factor (Using DER Net) 83.38 76.73 67.08
- 23. Unit Forced Outage Rate 4.90 5.21 13.38
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling / Maintenance - November,1981 - 3 Months.
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
September 1, 1981 l
l
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8108280200 810824~
DR ADOCK 050002y6 (9777)
Sg
~
Page 2 of 4 AVERAGE DAl!.Y UNIT POhER LEVEL DOCKET NO. _DPR-23 UNIT H. B. Robitwon Two DATE _810804 COMPLETED BY M. "atford 1ELErl!ONE 803-383-4524 MONT11 -
J"lY DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY power LEVEL
(.sD i,.w t )
(MWe Net s i
598 17 628 525 626 3
gg 3
434 39 608 4
639 20 628 5
638 21 631 6
638 22 629 637 7
23 623 g
636 2-1 627 9
643 25 629 10 640 26 618 gg 620 27 634 12 631 28 633 13 631 29 633 1.g 627 30 364 15 621 33 0
16 625 INSIT'.UCTIONS On this forraa',li:t the sc ag.' d:Cy unit power lese:in MWe Net for each d:y in the repeating nwnth. Compute to the n:are>t v. hole mqn.sti, (9/771 sg
Page 3 of 4 DPR-23 DOCKETNO.
UNIT SitUTDOWNS AND POWER REDUCTIONS UNIT NAME ti. B. Robinson Two DATE 810804 COMPLETED BY M. Watford REPORT MONTil July TELEPl!ONE 803-383-4524 l
E E
j7 3
4 EQ Lisemcc
[-r, "g'o causc & Corrective e
N...
Date
- 2 4
i E5 Event s?
eE Action to S
j@
d
}83 -
Repor t 20 j'
Prevent Recurrence x
07-01 810702 F
A 4
101 MOTORX Load reduction due to short in "A" condensate punp motor. The short occurred in the weatherhead to ground connection. The la::iicoid was re-placed.
07-02 810710 F
3.52 A
1 CJ INSTRU Reactor coolant system pressure trans-mitter sensing _line parted from trans-mitter. Sensing line was repaire'd.
07-03 810730 F
32.97 A
1 CJ HTEXCH Shutdown for steam generator tube inspection and repair.
~
I 2
3 4
F: Forced Reawn:
Method:
Eshibit G - Instructions 5: Scheduled A l~ iuipment F.n!ure(Explain) 1-Manual for Preparatt.m of Data Il M iinier. ant e oi Test 2 Manual Scram.
Entry She:is for Licensee C Refuelint 3-Autonptic Scram.
Esent Rep.nt iLLR) Fde tNUREG-D-Reputatov> Restriction 4-Oiher (Explam) 0161) 1: Operator Training i Liceme Examination F.AJ numst r.itive 5
G Operational Error (Explain)
Eshibit I - Same Source
- C8/77) llihher (Esp!am)
O sg u
.1 i
Page 4 of 4 DOCKETNO.
DPR-23 UNIT S!!UIDOWNS AND POWER REDUCTIONS UNIT NAME H. B. Robinson Two
" Corrected Copy DATE Rin7no COMPLETED BY v L htSd REPOlt r MONTil T" "
TELEPIIONE 80'l-1 Al m'1 E
E
{7 3
4 E5 Licensee
,h
['?
1, Cause & Coercesive EE livent 7?
9 Atteon so j ;f,5 E
4 N...
Date Report n 40 8L Prevent Recurrence 4.'
- { d y
v
- s
~'
05-01 810516 S
257.07 D
1 CC HTEXCH Continuation from last month. Shut-down for S/G tube inspectiot} and plugging as required,per inspection.
06-01 810619 F
11.58 H
2 HA GENERA Turbine run-back due to lightning hitting unit, resulting in operator manually tripping the unit as a precautionary safety measure.
06-02 810620 F
7.67 H
3 IB CKTBRK Unit trip due to instrument buss spike caused while I&C personnel were replacing safeguard test switch.
06-03 810620 F
A 4
HH CKTBRK Load reduction. Condensate pump micro switch failed preventing start" function.
Switch was replaced.
I 2
3 4
Method:
Exlubit G Instructions F: Forced Reawn.
S: Schedided A l'.guipment Failure (Explain) 1 Manual for Preparatam of Data il-Mais.ter.ance of Test 2-Manual Scram.
Entr> Sheets for Licensee C Refueling 3-Automatic Scram.
Esent Report iLLR) Fde iNUREG-D-IteFulato > Resteitison 4-Oiher'(Explain) 0161) 1 Opesato: Training & License Examination 5
F-Adnumst rative Exhibii I Same Source G-Operational Essor (Explain)