ML20030C160
| ML20030C160 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/10/1981 |
| From: | Parker W DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| RO-270-81-7, NUDOCS 8108250447 | |
| Download: ML20030C160 (1) | |
Text
07 )..,
< r, ]f U
y.-
DUKE PowE[
OMPANY
~ Cb,
f Powra Dun.Diwo g
422 Socin Cucacu Srazer, CnAamth(N.',C. sa4a th9is WIL LI AM O. Pammtp,Jm, TELtpsvoht* Asta 704 WCC Patsectut April 10, 1981 373..o.3 set - p.oowCrio.
\\5 4,'/%
/
Mr. James P. O'Reilly, Director E!
'/
U.S. Nuclear hegulatory Commission D,, g 50 g3 L3; Region II
[.2 W,lE C1 101 Mariatta Street, Suite 3100
\\g, y g
i 8
W i; Atlanta, Georgia 30303 t
a.
/, z::
/-
s
<g s
%gv s#
Re: Oconee Nuclear Station ioJ Docket No. 50-270
Dear Mr. O'Reilly:
On March 27, 1981, your office was informed that the standby bus breaker transfer switches were inadvertently left in manual mode, thus causing the emergency power path from Keowee to be inoperable. This is in violation of Technical Specifi-cation 3.7.2(a).
Reportable Occurrence Report R0-270/81-07, providing details of this incident, was to have been submitted to you by April 10, 1981, pursuant to Technical Specification 6.6.2.1.a(2).
As a result of other NRC regulations on the investigating personnel, this report is being delayed.
It is expected that the investigation and report will be completed, reviewed, and submitted to you no later than April 24, 1981.
Very truly yours, n,q h,
It l,yk'AH William O. Parker, Jr.