Forwards IE Insp Repts 50-413/80-33 & 50-414/80-33 on 801027-31 & Notice of Violation
ML20030B684
Person / Time
Site: Catawba  
Issue date: 12/10/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20030B685 List:
References
NUDOCS 8108180462
Download: ML20030B684 (2)


See also: IR 05000413/1980033

Text

l

8

S

3g

o,

UNITED STATES

OFFICIAL COPY

,

K;7

,

NUCLEAR REGULATORY COMMISSION

gg

!

_$

REGION 11

2

101 MARIETTA sT., N.W., SUITE 3100

o

5,

8

ATLANTA, GEORGIA 30303

.....

In Reply Refer To:

RII:JRl!

P

50-413/80-33

50-414/80-33

p

f

H

w

g

0)

Duke Power Company

V

'

'

AUG 17 l98] w $

ATTN:

W. O. Parker, Jr.

- ?

Vice President, Steam Production

u.s. mcun mewon

-

P. O. Box 2178

'\\

C *osson

y

b

8

Cha-lotte, NC 28242

r

&

Gentlemen:

-

This refers to the inspection conducted by J. R. Harris of this office on

October 27-31, 1980, of activities authorized by NRC Construction Permit Nos.

CPPR-116 and CPPR-117 for the Catawba facility, and to the discussion of our

findings held uith D. G. Beam at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Doctment Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include a full statement of the reasons on the basis of whien

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from ycu in this regard within

the specified period, the report will be placed in the Public Document Room.

i

8108190462 801210

l

gDRADOCK 05000413

h I

PDR

I

.

[

DEC t o heaa

1

'

,<

-

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

./ tyd

C. E. Murphy. Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-413/80-33

and 50-414/80-33