ML20030B456
| ML20030B456 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 08/04/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Long J GENERAL ELECTRIC CO. |
| References | |
| NUDOCS 8108180138 | |
| Download: ML20030B456 (2) | |
Text
_
i 0
, g.%., y w,m ny, CONTAINS 2.790% SAFEGUAftDS ltJ0Fb'ATl0N AUG 4 1981 cf A P
s General Electric Company g
h ATTN: Mr. J. A. Long, General Manager
-91 Wilmington Manufacturing Department T
m
$ 1981 > '--
AUG1 P. O. Box 780 g4 m8 Wilmington, NC 28402 sommsm Gentlemen:
Subject:
Report No. 70-1113/81-06 This refers to the routine safeguards inspection conducted by Mr. E. L. Clay of this office on May 18-22, 1981, of activities authorized by NRC License No.
SNM-1097 at General Electric Wilmington Manufacturing Department facility and to the discussions of our findings held with J. S. Bergman, Manager, Fuel Manufac-turing, and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection included your program for nuclear material control and accountability under the applicable provisions of Title 10, Code of Federal Regulations, Part 70, "Special Nuclear Material," and specific license conditions. Within these areas, the inspection consisted of selective examina-tions of orocedures and representative records, interviews with personnel, performance tests, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, activities involving safeguards and security measures are exempt from public disclosure; therefore, tne enclosed report with the exception of the cover page, which is an inspection summary, will not be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, h
R. C. Lewis, Acting Director Division of Resident and Reactor Project Inspection
Enclosures:
See Page 2
[ 61 /
Ob?o058??l; con $N I
WTER!AL TRANSMiiTED HERG!iTil CONTAlMS 2.700@ SAFEGUARDS I!! FORMAT 10N General Electric Company 2
Enclosures:
1.
Inspection Report No. 70-1113/L1-06 (Exempt from Disclosure) 2.
Inspection Summary (Not Exempt) cc w/ enc 1:
G. R. Mallett, Acting Manager Nuclear Materials Management C. M. Vaughan, Acting Manager Licensir.g and Compliance Audits bec w/o encl:
License Fee Management Branch bcc w/ Inspection Summary:
Local Public Document Room Washington Public Document Room Nuclear Safety Information Center Technical Information Center State of North Carolina bcc w/ encl:
Central Files Document Management Branch Chief of Safeguards Branch, DSRSI Chief, MC&A, Licensing Branch, NMSS RII RII RII RIL L)
RII e
Ehhht E h M ne AFGibson G oryeil RCLwil 7 /38/ 8 1 F/#/81 7/gV81 8/z//81 fg/81 nmRnt runsso m?H condus 2300M SAFECUARDS INF0rw.1103