, ..- - _- . ... .. .,

1 i

0FERATINB DATA REFORT DOCKET NO 50-369 +

DATE MaY 13. 1994 0FERATING STATUS COMPLETED BY R.A. Willians TELEPHONE 704-382-5346

1. Unit Naae McGuire 1
2. Reporting Period: April 1, 1994-April 30, 1994
3. Licensed Thersal Power (MWt): 3411
4. Naseplate Rating (Bross MWe): 1305* Notes
  • Nameplate Rating
5. Design Electrical Rating (Net MWel: 1180 (Bross MWe) calculated as
6. Maxieus Deper.dable Capacity (Gross MWe): 1171 1450.000 MVA x .90 power
7. Maxisua Dependable Capacity (Net MWe): 1129 factor per Page iii,
9. If Changes Occur in Capactly Ratings (Items Nusber 3 Through 7) Since Last NUREB-0020.

Report, Give F.easonst

9. Fewer level To Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, If any:

This Month Yr.-to-Date Cumulative

!!. Hcurs in Repcrting Period 719.0 2879 0 .108815.0 ,

12. Wuaber Of Hours Reactor Was Critical 719.0 2092.8 76113.3
13. Reactor Reserve Shutdown Hours --0-- --0-- --0--
14. Hours Benerator On-Line 719.0 2089.8 75309.3
15. Unit Reserve Shutdown Hours --0-- --0-- --0--
16. Gross.Thersal Energy Generated (MWH) 2437007. 6957800 233682716
17. Gross Electrical Energy Generated (MWH) 834047 2395479 60357634
16. Net Electrical-Energy Generated (MWH) 802373 2289823 76723973'
19. Unit Service fatter 100.0 72.6._ 69.2-
20. Unit Availability Factor 100.0 72.6 - 69.2 21.. Unit Capacity factor (Using MDC Neti 98.8 70.5 61.4
22. Un:t Capacity f actor lusing DER Net) 94.6 67.4 59.8
23. Unit Forced Outage Rate 0,0 27.4 14.7
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refuelinn - Aunust 19. 1994 - 62 davn

25. If Shut Down At End Of Report Period. Estiaated Date of Startup:
26. Units in Test Status (Prior to Coesercial Operatir,n) Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMERCIAL OFERATION 9405180363 940513 PDR ADOCK 05000369 R PDR

4 i

i 4

4 OPERATING DATA REPORT 4

1

- DOCKET ND 50-369 UNIT McGuire 1

[ DATE May 13, 1994

, COMPLETED BY - R. A. Williams

) IELEPHONE 704-382-5346 2 RONTH April,1994 l' DAY AVERASE LAILY POWER LEVEL DAY AVERABE DAILY POWER LEVEL l (MWe-Net) (NWe-Net) i 1 1120 17 1101 i.

I 2 1124 1B 1095 l

x l 3 1128 19 1101 l
j. 4 JR1 20 1107 i 5 1120 21 1120 6 1120 22 1119 j 7 1115 23 1119 l

8 1111 24  !!?6-

! 9 1113 2$  !!26 I

i- 10 1!!7 26 1128 j 11 1109 27 1120 l-l 12 1101 28 1124 l

13 1116 29  !!26 l 14 till 30 1128 i.

15 1107 5

16  !!0E i

i i

i a,-----,_...-.,u--,,---..n---..,..-.-,.._.-,.~..-..-.,....-.--~.,......,-----.-....--,--...-.-----.--,,,...---:--:=.------ -

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. __50-369 UNIT NAME nuuvint 1

, DATE unfla/94 REPORT MONTH April 1994 COMPLETED BY x. a. w1LLland TELEPHONE (/u4J-J62-334u (1) 2) _

(4) (S) ,

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S Forced eason- ethod: xhibit G - Instructions S Scheduled A-Equihment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of, Data 2-Manual Scram Entry Sneets For Licensee C-Refueling 3-Automatic Scram (LER D-Regulatory Restriction 4-Other (Explain) Event Report (NUREG-0161))

File E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

i 1

DOCKET: 50-369 i 1

UNIT: McGuire 1 Date: 05/13/94 NARRATIVE

SUMMARY

FDtTIH: April 1994 McCuire Unit 1 began the month of April operating at 100% full power. The unit operated at or near 100% full power for the entire month.

l Prepared by: R. A. Williams Telephone: (704)-382-5346 i

,I

MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: McGuire, Unit 1
2. Scheduled next refueling shutdown: August 1994 1
3. Scheduled restart following refueling: October 1994 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF

.ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4. Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 583
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DUKE POWER COMPANY DATE: _May 13, 1994 Name of

Contact:

R. A. Williams Phone: (7 C o. )-3 8 2-53 4 6 1

l 1

I i

l i

i

\

-i 1

OPERATINB DATA FEPORT DOCKET ND 50-370 DATE May 13. 1994 0FERATING STATUS COMPLETED BY R.A. Williams ,

TELEPHONE 704-382-5346

l. Unit Name: McGuire 2
2. Reporting Period: April 1, 1994-April 30, 1994
3. Licensed Thermal Power (MWt): 3411  :
4. Raseplate Rating (Gross MWe): 13051 Notes *Naseplate Rating
5. Design Electrical nating (Net MWe): 1180 (Bross MWel calculated as  !
6. Maxists Dependable Capacity (Bross MWe): 1171 1450.000 MVA : .90 power ,
7. tianisce Dependable Capacity (Net MWe): 1129 factor per Page iii;
9. If Changes Occur in Capacity Batirigs (!tess Nue,ber 3 Through 7) Since Last NURES-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, if Any (Net MWel
10. Reason for Restrictions, If any:
  • This Month .Yr.-to-Date Cueulative
11. Hours in Reporting Pericd 719.0 2979.0 89111.0
12. Number Of Heurs Reactor Was Critical 719.0 2736.4 68578.4
13. Reacter Reserve Shutdown Hours -+- --0-- -+-
14. Hsurs Generater On-Line 719.0 2734.1 67610.3
15. Unit Reserve Shutdewn H:urs - --0-- --0--
16. Gross Thermal Energy Generated (MW) 2445941 9282141 221154120
17. Brass Electrital Energy Generated (MWH) 85SH7 3258623 77307558
18. Net Electrical Energy Generated (MW) 827830 31399 % 74106064 19.UnitServiceFactor 100.0 95.0 75.9 ,
20. Unit Availability Factor 100.0 95.0 75.9
21. Unit Capacity factor (Using MDC Net) 102.0 96.6 72.8
22. Unit Capacity Factor (Using EER Net) 97.6 92.4 70.5
23. Unit forced Outage Rate 0.0 5.0 7.1
24. Shutdcan Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Stut Down At End Of Report Period. Estieated Date of Startup:
26. Units In Test Status (Prict to Consercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY '

COMERCIAL GFERAllCh l

1

, , . . . . . - .- . . ~ . . . . - - . . . . . . ... ..

t P

4 OPERATING DATA REFORT DOCKET NO 50-370 UNIT McGuire 2 DATE May 13, 1994 R.A. Willians COMPLETED BY

.IELEPHONE 704-382-5346 MONTH 4ril,1994 pg AVERAGE DAILY FCWER LEVEL E D AVEFASE DAILY F0WER LEVEL (MWe-Net 1 (MWe-Net) 1 1154 17 1152 2 1156 18 1151 3 1159 19 1153 4  !!57 20 1151 5 1156 21 1147 6 1156 22 1143 7 1153 23 1144 8  !!51 24  !!48 9 1153 25 1149 10  !!55 26 1149 11 1152 27 1148 12 1t51 29 1146 13 1155 29 1145 14 1154 30 1148 15 1153 ,

i 16 . '  !!$3

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME nwulut e DATE unfla/34 REPORT MONTH April 1994 COMPLETED BY x. a. winbland TELEPHONE t/u4J-auz-oJ46 (1) 2) _

(4) (5) ,

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DUPATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)

F Forced Reason

  • Method: Exhibit G - Instructions S Scheduled A-Equipment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of Data 2-Manual Scram Entry Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161))

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

a i

DOCKET: 50-370 UNIT: McGuire 2 Date: 05/13/94 NARRATIVE SUME RY M0lmI: April 1994 McGuire Unit 2 began the month of April operating at 100% full power. 'Ihe unit I operated at or near 100% full power for the entire month.

I

~l, 1

i I

1 l

)

Prepared by: R. A. Williams Telephone: (704)-382-5346

t MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: McGuire, Unit 2
2. Scheduled next. refueling shutdown: November 1994
3. Scheduled restart following refueling: January 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS '4

-THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4. Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regar' ding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or.

supplier,- unreviewed design or performance analysis methods, significant changes-in design or new operating procedures).

7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 817
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: December 2003 DUKE POWER COMPANY DATE: May 13, 1994 Name of

Contact: