Proposed Tech Specs Reflecting Relocation of Response Time Limit Tables
ML20029D535
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/26/1994
From:
DETROIT EDISON CO.
To:
Shared Package
ML20029D530 List:
References
NUDOCS 9405060084
Download: ML20029D535 (10)


Text

_ _ .

ATTACIIMEN"I' 2 PROPOSED TECIINICAL SPECIFICATION CII,tNGFE 9405060084 940426 PDR ADOCK 05000341 P PDR

i ItLDf2 LIST OF TABLES TABLE PEif 1.1 SURVEILLANCE FREQUENCY NOTATION.................. 1-9 1.2 OPU!ATIONAL C0NDaTIONS. . . . . . . . . . . . . . . . . . . . . . . . . . . 1-10 2.2.1-1 D. ACTOR PROTECTION SYSTEM INSTRUMENTATION SETP0lNTS........................................ 2-4 3.3.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION........ 3/4 3-2 3.3.1-2 DELETED.......................................... 3/4 3-6 l 4.3.1.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS........................ 3/4 3-7 3.3.2-1 ISOLATION A N ATION INSTRUMENTATION.............. 3/4 3-11 3.3.2-2 ISOLATION ACTUATION INSTRUMENTATION SETPOINTS.... 3/4 3-15 3.3.2-3 DELETED.......................................... 3/4 3-18 l 4.3.2.1-1 ISOLATION ACTUATION INSTRUMENTATION SURVEILLANCE REQUIREMENTS........................ 3/4 3-20 3.3.3-1 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION.................................. 3/4 3-24 3.3.3-2 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION.SETPOINTS........................ 3/4 3-27 3.3.3-3 DELETED.......................................... 3/4 3-29 l 4.3.3.1-1 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUNtN'4..A SURVEILLANCE REQUIREMENTS........ 3/4 3-30 3.3.4-1 ATWS RECIRLbun. ION PUMP TRIP SYSTEM INSTRUMENTATION.................................. 3/4 3-33 3.3.4-2 ATWS RECIRCULATION PUMP TRIP SYSTEM INSTRUMENTATION SETP0lNTS........................ 3/4 3-34 FERMI - UNIT 2 xxii Amendment No. A2 l

t - - - - -

1 l

l 3'/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTION SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION i 3.3.1 As a minimum, the reactor protection system instrumentation channels l shown in Table 3.3.1-1 shall be OPERABLE. l APPLICABILITY: As shown in Table 3.3.1-1.

ACTION:

a. With the number of OPERABLE channels less than required by the Minimum OPERABLE channels per Trip System requirement for one trip system:
1. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, verify that each Functional Unit within the affected trip system contains no more than one inoperable channel or place the inoperable channel (s) and/or that trip system in the tripped condition *.

i

2. If placing the inoperable channel (s) in the tripped condition would cause a scram, the inoperable channel (s) shall be restored to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or the ACTION required by Table 3.3.1-1 for the affected Functional Unit shall be taken.
3. If placing the inoperable channel (s) in the tripped condition would not cause a scram, place the inoperable channel (s) and/or that trip system in the tripped condition within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
b. With the number of OPERABLE channels less than required by the Minimum 0PERABLE Channels per Trip System requirement for both trip systems, place at least one trip system ** in the tripped condition within I hour and take the ACTION required by Table 3.3.1-1.
  • An inoperable channel need not be placed in the tripped condition where this would cause a scram to occur. In these cases, the inoperable channel shall be restored to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after the channel was first determined to be inoperable or the ACTION required by Table 3.3.1-1 for that Functional Unit shall be taken.
    • The trip system need not ba placed in the tripped condition if this would I cause a scram to occur. When a trip system can be placed in the tripped condition without causing a scram to occur, place the trip system with the most inoperable channels in the tripped condition; if both systems have the ,

same number of inoperable channels, place either trip system in the tripped 1 condition.

1 FERMI - UNIT 2 3/4 3-1 Amendment No. 7E, #

i

l 3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS 4.3.1.1 Each reactor protection system instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST, and CHANNEL CALIBRATION operations for the OPERATIONAL i,

CONDITIONS and at the frequencies shown in Table 4.3.1.1-1.

4.3.1.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed at least once per 18 months.

4.3.1.3 The REACTOR PROTECTION SYSTEM RESPONSE TIME of each reactor trip functional unit shall be demonstrated to be within its limit at least once per 18 months. Neutron detectors are exempt from response time testing. Each l test shall include at least one channel per trip system such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific reactor trip system.

l i

l FERMI - UNIT 2 3/4 3-la Amendment No. /E, i

)

I l

Table 3.3.1-2 has been deleted.

l l

l I

1 I

I FERMI - UNIT 2 3/4 3-6 Amendment Ho, 77, 79

) INSTRUMENTATION 3/4.3.2 ISOLATION ACTUATION INSTRUMENTATION LIMITING CONDITION FOR OPERATION i

3.3.2 The isolation actuation instrumentation channels shown in Table 3.3.2-1 I shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3.2-2. l APPLICABILITY: As shown in Table 3.3.2-1.

ACTION:

a. With an isolation actuation instrumentation channel trip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3.2-2, declare the channel inoperable until the channel is restored to OPERABLE status with its trip setpoint adjusted consistent with the Trip Setpoint value.
b. With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip System requirement for one trip system:
1. If placing the inoperable channel (s) in the tripped condition would cause an isolation, the inoperable channel (s) shall be restored to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or the ACTION required by Table 3.3.2-1 for the affected trip function shall be taken.
2. If placing the inoperable channel (s) in the tripped condition would not cause an isolation, the inoperable channel (s) and/or that trip system shall be placed in the tripped condition within:

a) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for trip functions common to RPS Instrumentation; and b) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for trip functions not common to RPS Instrumentation.

c. With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip System requirement for both trip systems, place at least one trip system
  • in the tripped condition within one hour and take the ACTION required by Table 3.3.2-1.
  • Place nne trip system (with the most inoperable channels) in the tripped condition. The trip system need not be placed in the tripped condition when this would cause the isolation to occur.

FERMI - UNIT 2 3/4 3-9 Amendment No. /J, /5, EJ

INSTRUMENTATION SURVEILLANCE RE0VIREMENTS 4.3.2.1 Each isolation :ctuation instrumentation channel shall be e demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION operations for the OPERATIONAL CONDITIONS and at the frequencies shown in Table 4.3.2.1

  • 4.3.2.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated aut ,matic operation of all channels shall be performed at least once per 18 r .iths.

4.3.2.3 The ISOLATION SYSTEM RESPONSE TIME of each isolation trip function shall be demonstrated to be within its limit at least once per 18 months.

Radiation detectors are exempt from response time testing. Each test shall l include at least one channel per trip system such that all channels are tested at least once every N times 18 months, where N is the total number of redundant channels in a specific isolation trip system.

FERMI - UNIT 2 3/4 3-10 Amendment No.

Table 3.3.2-3 has been deleted.

l 4

l l

l l

1 I

1 l

l 1

1 1

4 s

FERMI - UNIT 2 3/4 3-18 Amendment No. /J, //

INSTRUMENTATION 3/4.3.3 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3 The emergency core cooling system (ECCS) actuation instrumentation

. channels shown in Table 3.3.3-1 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3.3-2. l f

APPLICABILITY: As shown in Table 3.3.3-1.

ACTION:

a. With an ECCS actuation instrumentation channel trip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3.3-2, declare the channel inoperable until the channel is restored to CPERABLE status with its trip setpoint adjusted consistent with the Trip Setpoint value.
b. With one or more ECCS actuation instrumentation channels inoperable, take the ACTION required by Table 3.3.3-1.
c. With either ADS trip system "A" or "B" inoperable, restore the inoperable trip system to OPERABLE status within:
1. 7 days, provided that the HPCI and RCIC systems are OPERABLE, otherwise,
2. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

Otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and reduce reactor steam dome pressure to less than or equal to 150 psig within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

SURVEILLANCE RE0VIREMENTS 4.3.3.1 Each ECCS actuation instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION operations for the OPERATIONAL CONDITIONS and at the frequencies shown in Table 4.3.3.1-1.

4.3.3.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed at least once per 18 months.

4.3.3.3 The ECCS RESPONSE TIME of each ECCS trip function shall be demonstrated to be within the limit at least once per 18 months. Each test shall include at least one channel per trip system such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific ECCS trip system.

I FERMI - UNIT 2 3/43-23 Amendment No.

Table 3.3.3-3 has been deleted.

I I

i l

l l

1 FERMI - UNIT 2 3/4 3-29 Amendment No. JJ, fy, 73