Proposed Tech Specs Reflecting Relocation of Response Time Limit TablesML20029D535 |
Person / Time |
---|
Site: |
Fermi |
---|
Issue date: |
04/26/1994 |
---|
From: |
DETROIT EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20029D530 |
List: |
---|
References |
---|
NUDOCS 9405060084 |
Download: ML20029D535 (10) |
|
Similar Documents at Fermi |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217J5441998-03-27027 March 1998 Proposed Tech Specs Eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray ML20217J5841998-03-27027 March 1998 Proposed Tech Specs Revising Footnote Specifying Conditions Where Isolation Valves Associated W/Lpci Sys Operation Are Repositioned ML20199H9371998-01-28028 January 1998 Proposed Tech Specs Re thermal-hydraulic Stability,Idle Recirculation Loop Startup & Post Accident Monitoring ML20199H2611998-01-28028 January 1998 Proposed Tech Specs Re Access Control to Provide Flexibility While Maintaining Similar Control Over Access ML20199H2561998-01-28028 January 1998 Proposed Tech Specs,Modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Requirements Per 10CFR50.36a ML20199H2501998-01-28028 January 1998 Proposed Tech Specs 4.4.3.2.2.a,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements ML20199H2411998-01-28028 January 1998 Proposed Tech Specs,Revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch Can Be Performed ML20199H2141998-01-28028 January 1998 Proposed Tech Specs,Revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement ML20199H2281998-01-28028 January 1998 Proposed Marked Up & Retyped TS of Sheet 2,Table 3.3.6-2, Deleting RCS Recirculation Flow Trip Functions ML20203F1941997-12-10010 December 1997 Proposed Tech Specs Revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms ML20202A7961997-11-26026 November 1997 Proposed Tech Specs Reflecting Alternative Wording for Surveillance Which Address Only Clarification to Situational Testing Requirement NRC-97-0089, Proposed Tech Specs,Relocating Selected Requirements & Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested1997-09-29029 September 1997 Proposed Tech Specs,Relocating Selected Requirements & Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested ML20216F3581997-09-0505 September 1997 Proposed Tech Specs,Adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing ML20141B8881997-06-20020 June 1997 Proposed Tech Specs Re Relocation of Reactor Recirculation Sys MG Set Scoop Tube Stop Setting Surveillance 1999-09-03
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211B9861999-08-13013 August 1999 Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval ML20211C2631999-08-13013 August 1999 Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20210A3031999-06-30030 June 1999 Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206M8651999-05-0606 May 1999 Rev 30,Vol I to Technical Requirements Manual ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20198D1391998-12-14014 December 1998 Rev 28 to Vol 1 of Technical Requirements Manual ML20198B8121998-12-10010 December 1998 Rev 27 to Fermi 2 Technical Requirements Manual,Vol I ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154Q0771998-10-15015 October 1998 6 to Fermi 2, Technical Requirements Manual, Vol I ML20154M4611998-10-0909 October 1998 5 to Vol 1 of Fermi 2 Technical Requirements Manual ML20154H8931998-10-0808 October 1998 Rev 24 to Fermi 2 Technical Requirements Manual,Vol I ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20153F3931998-09-23023 September 1998 Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20237D6311998-08-18018 August 1998 Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20236P9241998-06-10010 June 1998 Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248H0901998-05-31031 May 1998 Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217J5841998-03-27027 March 1998 Proposed Tech Specs Revising Footnote Specifying Conditions Where Isolation Valves Associated W/Lpci Sys Operation Are Repositioned 1999-09-03
[Table view] |
Text
_ _ .
ATTACIIMEN"I' 2 PROPOSED TECIINICAL SPECIFICATION CII,tNGFE 9405060084 940426 PDR ADOCK 05000341 P PDR
i ItLDf2 LIST OF TABLES TABLE PEif 1.1 SURVEILLANCE FREQUENCY NOTATION.................. 1-9 1.2 OPU!ATIONAL C0NDaTIONS. . . . . . . . . . . . . . . . . . . . . . . . . . . 1-10 2.2.1-1 D. ACTOR PROTECTION SYSTEM INSTRUMENTATION SETP0lNTS........................................ 2-4 3.3.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION........ 3/4 3-2 3.3.1-2 DELETED.......................................... 3/4 3-6 l 4.3.1.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS........................ 3/4 3-7 3.3.2-1 ISOLATION A N ATION INSTRUMENTATION.............. 3/4 3-11 3.3.2-2 ISOLATION ACTUATION INSTRUMENTATION SETPOINTS.... 3/4 3-15 3.3.2-3 DELETED.......................................... 3/4 3-18 l 4.3.2.1-1 ISOLATION ACTUATION INSTRUMENTATION SURVEILLANCE REQUIREMENTS........................ 3/4 3-20 3.3.3-1 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION.................................. 3/4 3-24 3.3.3-2 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION.SETPOINTS........................ 3/4 3-27 3.3.3-3 DELETED.......................................... 3/4 3-29 l 4.3.3.1-1 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUNtN'4..A SURVEILLANCE REQUIREMENTS........ 3/4 3-30 3.3.4-1 ATWS RECIRLbun. ION PUMP TRIP SYSTEM INSTRUMENTATION.................................. 3/4 3-33 3.3.4-2 ATWS RECIRCULATION PUMP TRIP SYSTEM INSTRUMENTATION SETP0lNTS........................ 3/4 3-34 FERMI - UNIT 2 xxii Amendment No. A2 l
t - - - - -
1 l
l 3'/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTION SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION i 3.3.1 As a minimum, the reactor protection system instrumentation channels l shown in Table 3.3.1-1 shall be OPERABLE. l APPLICABILITY: As shown in Table 3.3.1-1.
ACTION:
- a. With the number of OPERABLE channels less than required by the Minimum OPERABLE channels per Trip System requirement for one trip system:
- 1. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, verify that each Functional Unit within the affected trip system contains no more than one inoperable channel or place the inoperable channel (s) and/or that trip system in the tripped condition *.
i
- 2. If placing the inoperable channel (s) in the tripped condition would cause a scram, the inoperable channel (s) shall be restored to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or the ACTION required by Table 3.3.1-1 for the affected Functional Unit shall be taken.
- 3. If placing the inoperable channel (s) in the tripped condition would not cause a scram, place the inoperable channel (s) and/or that trip system in the tripped condition within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- b. With the number of OPERABLE channels less than required by the Minimum 0PERABLE Channels per Trip System requirement for both trip systems, place at least one trip system ** in the tripped condition within I hour and take the ACTION required by Table 3.3.1-1.
- An inoperable channel need not be placed in the tripped condition where this would cause a scram to occur. In these cases, the inoperable channel shall be restored to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after the channel was first determined to be inoperable or the ACTION required by Table 3.3.1-1 for that Functional Unit shall be taken.
- The trip system need not ba placed in the tripped condition if this would I cause a scram to occur. When a trip system can be placed in the tripped condition without causing a scram to occur, place the trip system with the most inoperable channels in the tripped condition; if both systems have the ,
same number of inoperable channels, place either trip system in the tripped 1 condition.
1 FERMI - UNIT 2 3/4 3-1 Amendment No. 7E, #
i
l 3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS 4.3.1.1 Each reactor protection system instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST, and CHANNEL CALIBRATION operations for the OPERATIONAL i,
CONDITIONS and at the frequencies shown in Table 4.3.1.1-1.
4.3.1.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed at least once per 18 months.
4.3.1.3 The REACTOR PROTECTION SYSTEM RESPONSE TIME of each reactor trip functional unit shall be demonstrated to be within its limit at least once per 18 months. Neutron detectors are exempt from response time testing. Each l test shall include at least one channel per trip system such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific reactor trip system.
l i
l FERMI - UNIT 2 3/4 3-la Amendment No. /E, i
)
I l
Table 3.3.1-2 has been deleted.
l l
l I
1 I
I FERMI - UNIT 2 3/4 3-6 Amendment Ho, 77, 79
) INSTRUMENTATION 3/4.3.2 ISOLATION ACTUATION INSTRUMENTATION LIMITING CONDITION FOR OPERATION i
3.3.2 The isolation actuation instrumentation channels shown in Table 3.3.2-1 I shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3.2-2. l APPLICABILITY: As shown in Table 3.3.2-1.
ACTION:
- a. With an isolation actuation instrumentation channel trip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3.2-2, declare the channel inoperable until the channel is restored to OPERABLE status with its trip setpoint adjusted consistent with the Trip Setpoint value.
- b. With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip System requirement for one trip system:
- 1. If placing the inoperable channel (s) in the tripped condition would cause an isolation, the inoperable channel (s) shall be restored to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or the ACTION required by Table 3.3.2-1 for the affected trip function shall be taken.
- 2. If placing the inoperable channel (s) in the tripped condition would not cause an isolation, the inoperable channel (s) and/or that trip system shall be placed in the tripped condition within:
a) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for trip functions common to RPS Instrumentation; and b) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for trip functions not common to RPS Instrumentation.
- c. With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip System requirement for both trip systems, place at least one trip system
- in the tripped condition within one hour and take the ACTION required by Table 3.3.2-1.
- Place nne trip system (with the most inoperable channels) in the tripped condition. The trip system need not be placed in the tripped condition when this would cause the isolation to occur.
FERMI - UNIT 2 3/4 3-9 Amendment No. /J, /5, EJ
INSTRUMENTATION SURVEILLANCE RE0VIREMENTS 4.3.2.1 Each isolation :ctuation instrumentation channel shall be e demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION operations for the OPERATIONAL CONDITIONS and at the frequencies shown in Table 4.3.2.1
- 4.3.2.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated aut ,matic operation of all channels shall be performed at least once per 18 r .iths.
4.3.2.3 The ISOLATION SYSTEM RESPONSE TIME of each isolation trip function shall be demonstrated to be within its limit at least once per 18 months.
Radiation detectors are exempt from response time testing. Each test shall l include at least one channel per trip system such that all channels are tested at least once every N times 18 months, where N is the total number of redundant channels in a specific isolation trip system.
FERMI - UNIT 2 3/4 3-10 Amendment No.
Table 3.3.2-3 has been deleted.
l 4
l l
l l
1 I
1 l
l 1
1 1
4 s
FERMI - UNIT 2 3/4 3-18 Amendment No. /J, //
INSTRUMENTATION 3/4.3.3 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3 The emergency core cooling system (ECCS) actuation instrumentation
. channels shown in Table 3.3.3-1 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3.3-2. l f
APPLICABILITY: As shown in Table 3.3.3-1.
ACTION:
- a. With an ECCS actuation instrumentation channel trip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3.3-2, declare the channel inoperable until the channel is restored to CPERABLE status with its trip setpoint adjusted consistent with the Trip Setpoint value.
- b. With one or more ECCS actuation instrumentation channels inoperable, take the ACTION required by Table 3.3.3-1.
- c. With either ADS trip system "A" or "B" inoperable, restore the inoperable trip system to OPERABLE status within:
- 1. 7 days, provided that the HPCI and RCIC systems are OPERABLE, otherwise,
- 2. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
Otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and reduce reactor steam dome pressure to less than or equal to 150 psig within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
SURVEILLANCE RE0VIREMENTS 4.3.3.1 Each ECCS actuation instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION operations for the OPERATIONAL CONDITIONS and at the frequencies shown in Table 4.3.3.1-1.
4.3.3.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed at least once per 18 months.
4.3.3.3 The ECCS RESPONSE TIME of each ECCS trip function shall be demonstrated to be within the limit at least once per 18 months. Each test shall include at least one channel per trip system such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific ECCS trip system.
I FERMI - UNIT 2 3/43-23 Amendment No.
Table 3.3.3-3 has been deleted.
I I
i l
l l