Revised Monthly Operating Rept for McGuire Nuclear Station for Feb 1994
ML20029C651
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 02/28/1994
From:
DUKE POWER CO.
To:
Shared Package
ML20029C621 List:
References
NUDOCS 9404210124
Download: ML20029C651 (1)


Text

y.. _ _ _ - _ _ . . _ - . . . _ _ _ . . _ _ . . . _ . _. _ _ _ _ __.

l l 4 ,

4 i

l l

McGUIRE NUCLEAR' STATION MONTHLY OPERATING STATUS REPORT February 1994

1. Personnel Exposure -
The total station liquid release for February has been '

l compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for February has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

l l

l l

i 9404210124 94o4g5 DR ADOCK 05000369 PDR

[ l 1

l 1

i

, MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: McGuire. Unit 1
2. Scheduled next refueling shutdown: Auoust 1994
3. Scheduled restart following refueling: October 1994 THE PROJECT MANAGER HNS'BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 583
8. Present licensed fuel pool capacity: 146'3 Size of requested or planned increase: ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DUKE POWER COMPANY DATE: April 15, 1994 i

l Name of

Contact:

R. A. Williams Phone: (704)-382-5346 l

l

~~ . . ..

[

l DOCKET: 50-369 UNIT: McGuire 1 Date: 04/15/94 l

l NARRATIVE SLFNARY MJNIH: March 1994 McGuire Unit 1 began the month of March operating at 100% full pcwar. The unit coninenced a power decrease on 03/04/94 at 2304 and held at 33% power flun 03/04/94 at 2324 to 03/06/94 at 1657 due to steam generator "A" main feedwater valve flow.

l The unit returned to full power on 03/07/94 at 0400 and operated at or near 100%

. full power the remainder of the nonth.

PInpared by: R. A. Williams Telephone: (704)-382-5346

. - .