Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G3541999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbaps,Units 2 & 3. with ML20212A5871999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Peach Bottom,Units 2 & 3.With ML20210N7641999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for PBAPS Units 2 & 3. with ML20209H1121999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbaps,Units 2 & 3. with ML20195H8841999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbaps,Units 2 & 3. with ML20206N1661999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pbaps,Units 2 & 3. with ML20205P5851999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Peach Bottom Units 2 & 3.With ML20207G9971999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Peach Bottom Units 2 & 3.With ML20199E3471998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Peach Bottom,Units 1 & 2.With ML20198B8591998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pbaps,Units 2 & 3. with ML20195E5341998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pbaps,Units 2 & 3. with ML20154H5541998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Pbaps,Units 2 & 3. with ML20151Y2901998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbaps,Units 2 & 3. with ML20237A5351998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Pbaps,Units 2 & 3 ML20236M3471998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbaps,Units 2 & 3 ML20248M3001998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Pbaps,Units 2 & 3 ML20247G0721998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Pbaps,Units 2 & 3 ML20216F3831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Peach Bottom,Units 2 & 3 ML20216G1991998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Peach Bottom Atomic Power Station,Units 1 & 2 ML20202F7341998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Pbaps,Units 2 & 3 ML20198N8851997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Peach Bottom,Units 2 & 3 ML20203J7311997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Pbaps,Units 2 & 3 ML20199D1241997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Peach Bottom,Units 2 & 3 ML20198J8871997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Pbaps,Units 2 & 3 ML20217A8061997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Peach Bottom Units 2 & 3 ML20210J7111997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Pbaps,Units 1 & 2 ML20141H2071997-06-30030 June 1997 Monthly Operating Repts for June 1997 for PBAPS ML20148K6251997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Peach Bottom Atomic Power Station Units 2 & 3 ML20141D3691997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Peach Bottom Units 2 & 3 ML20137V9731997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Peach Bottom Atomic Power Station Units 2 & 3 ML20136G3671997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for PBAPS ML20138K5551997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Peach Bottom Units 2 & 3 ML20133H6121996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Peach Bottom 2 & 3 ML20132B9481996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Peach Bottom Units 1 & 2 ML20134M0501996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Peach Bottom Unit 2 & 3 ML20129A9871996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Peach Bottom Unit 2 & 3 ML20117N1601996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Peach Bottom Atomic Power Station Units 1 & 2 ML20116M1641996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Peach Bottom Units 2 & 3 ML20115F8541996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Peach Bottom Units 1 & 2 ML20116M1701996-06-30030 June 1996 Revised MOR for June 1996 for Peach Bottom Unit 3 ML20117M6781996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Peach Bottom Atomic Power Station ML20117F8161996-04-30030 April 1996 Monthly Operating Repts for April 1996 for PBAPS ML20107D9381996-03-31031 March 1996 Monthly Operating Repts for March 1996 for PBAPS ML20106G8101996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Peach Bottom Atomic Power Station Units 1 & 2 ML20149K9331996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for PBAPS Units 2 & 3 ML20096F4151995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Pbaps,Units 2 & 3 ML20095G9381995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for PBAPS Units 2 & 3 ML20094L6301995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Peach Bottom Units 2 & 3 ML20093G3571995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for PBAPS Units 1 & 2 ML20092G3231995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Peach Bottom Units 2 & 3 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEAR05000278/LER-1999-005-03, :on 990920,uplanned Esfas During Planned Mod Activitives in Main CR Were Noted.Caused by Inattention to Detail by Individuals Performing Work.All CR Mods Were Ceased to Allow Review of Mod Work Packages.With1999-10-20020 October 1999
- on 990920,uplanned Esfas During Planned Mod Activitives in Main CR Were Noted.Caused by Inattention to Detail by Individuals Performing Work.All CR Mods Were Ceased to Allow Review of Mod Work Packages.With
ML20217K9931999-10-14014 October 1999 Safety Evaluation Supporting Amend 234 to License DPR-56 ML20217B4331999-10-0505 October 1999 Safety Evaluation Supporting Amend 233 to License DPR-56 05000278/LER-1999-004-03, :on 990901,3A RPS Bus Was Inadvertently Deenergized,During Planned Mod Activities on Main CR Panel. Caused by Electrician Failing to Self Check Work.All CR Work Was Ceased Immediately & Shutdown Meeting Held1999-10-0101 October 1999
- on 990901,3A RPS Bus Was Inadvertently Deenergized,During Planned Mod Activities on Main CR Panel. Caused by Electrician Failing to Self Check Work.All CR Work Was Ceased Immediately & Shutdown Meeting Held
ML20217G3541999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbaps,Units 2 & 3. with ML20216H7091999-09-24024 September 1999 Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively ML15112A7681999-09-20020 September 1999 SER Accepting Revision 25 of Pump & Valve Inservice Testing Program,Third 10-year Interval for Plant,Units 1,2 & 3 ML20212D1281999-09-17017 September 1999 Safety Evaluation Supporting Proposed Alternatives CRR-03, 05,08,09,10 & 11 05000278/LER-1999-003-03, :on 990814,HPCIS Was Declared Inoperable Due to Erratic Behavior Resulting in Loss of Single High Train Safety Sys.Caused by Weakness in Procedural Guidance. Readjusted Hydraulic Governor Needle Valve.With1999-09-13013 September 1999
- on 990814,HPCIS Was Declared Inoperable Due to Erratic Behavior Resulting in Loss of Single High Train Safety Sys.Caused by Weakness in Procedural Guidance. Readjusted Hydraulic Governor Needle Valve.With
ML20212A5871999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Peach Bottom,Units 2 & 3.With ML20211D5501999-08-23023 August 1999 Safety Evaluation Supporting Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively ML20212H6311999-08-19019 August 1999 Rev 2 to PECO-COLR-P2C13, COLR for Pbaps,Unit 2,Reload 12 Cycle 13 ML20210N7641999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for PBAPS Units 2 & 3. with 05000277/LER-1999-005-01, :on 990616,failure to Maintain Provisions of FP Program Occurred.Caused by Less than Adequate Engineering Rigor in Both Development & Review Analysis.Fire Watch Immediately Established.With1999-07-16016 July 1999
- on 990616,failure to Maintain Provisions of FP Program Occurred.Caused by Less than Adequate Engineering Rigor in Both Development & Review Analysis.Fire Watch Immediately Established.With
ML20209H1121999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbaps,Units 2 & 3. with ML20195H8841999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbaps,Units 2 & 3. with 05000278/LER-1999-002-02, :on 990406,safeguard Sys to Unrelated Door Was Inadvertently Disabled by Security Alarm Station Operator. Caused by Noncompliance with Procedures & Less than Adequate Shift Turnover.Briefed Personnel on Event.With1999-05-0606 May 1999
- on 990406,safeguard Sys to Unrelated Door Was Inadvertently Disabled by Security Alarm Station Operator. Caused by Noncompliance with Procedures & Less than Adequate Shift Turnover.Briefed Personnel on Event.With
ML20206N1661999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pbaps,Units 2 & 3. with ML20206A2921999-04-20020 April 1999 Safety Evaluation Concluding That Proposed Changes to EALs for PBAPS Are Consistent with Guidance in NUMARC/NESP-007 & Identified Deviations Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 05000278/LER-1999-001-03, :on 990312,ESF Actuation of Rcics Occurred Due to High Steam Flow Signal During Sys Restoration.Temporary Change to Restoration Procedure Was Initiated to Open RCIC Outboard Steam Isolation Valve in Smaller Increments1999-04-0808 April 1999
- on 990312,ESF Actuation of Rcics Occurred Due to High Steam Flow Signal During Sys Restoration.Temporary Change to Restoration Procedure Was Initiated to Open RCIC Outboard Steam Isolation Valve in Smaller Increments
ML20205K7411999-04-0707 April 1999 Safety Evaluation Supporting Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively ML20205P5851999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Peach Bottom Units 2 & 3.With ML20207G9971999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Peach Bottom Units 2 & 3.With 05000278/LER-1998-009-01, :on 981227,unplanned Esfa Were Noted.Caused by Transformer Insulator Failure.Replaced Failed Insulator. with1999-01-20020 January 1999
- on 981227,unplanned Esfa Were Noted.Caused by Transformer Insulator Failure.Replaced Failed Insulator. with
ML20199E3471998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Peach Bottom,Units 1 & 2.With ML20206P1651998-12-31031 December 1998 Fire Protection for Operating Nuclear Power Plants, Section Iii.F, Automatic Fire Detection ML20205K0381998-12-31031 December 1998 PECO Energy 1998 Annual Rept. with ML20206D3651998-12-31031 December 1998 1998 PBAPS Annual 10CFR50.59 & Commitment Rev Rept. with ML20206D3591998-12-31031 December 1998 1998 PBAPS Annual 10CFR72.48 Rept. with 05000277/LER-1998-008-01, :on 981130,circuit Breaker SU-25 Tripped.Caused by Less than Adequate Procedural Guidance.Operators Verified Sys Integrity & Successfully Returned Sys to Svc.With1998-12-30030 December 1998
- on 981130,circuit Breaker SU-25 Tripped.Caused by Less than Adequate Procedural Guidance.Operators Verified Sys Integrity & Successfully Returned Sys to Svc.With
05000277/LER-1998-007-02, :on 981107,failure to Meet TS & Associated LCO Requirments of Absolute Difference in APRM & Calculated Power of Less than 2% Was Noted.Caused by Substitute Valves Being Used.Removed Substitute Valves.With1998-12-0404 December 1998
- on 981107,failure to Meet TS & Associated LCO Requirments of Absolute Difference in APRM & Calculated Power of Less than 2% Was Noted.Caused by Substitute Valves Being Used.Removed Substitute Valves.With
ML20196G7021998-12-0202 December 1998 SER Authorizing Proposed Alternative to Delay Exam of Reactor Pressure Vessel Shell Circumferential Welds by Two Operating Cycles ML20196E8261998-11-30030 November 1998 Response to NRC RAI Re Reactor Pressure Vessel Structural Integrity at Peach Bottom Units 2 & 3 ML20198B8591998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pbaps,Units 2 & 3. with 05000278/LER-1998-005-03, :on 981025,inadvertent Unit 3 Electrical Bus E33 Trip (Esfa) During Performance of Unit 2 Electrical Bus E32 Surveillance Test Was Noted.Caused by Personnel Error. Sp S12M-54-E32-XXF4 Was Completed.With1998-11-20020 November 1998
- on 981025,inadvertent Unit 3 Electrical Bus E33 Trip (Esfa) During Performance of Unit 2 Electrical Bus E32 Surveillance Test Was Noted.Caused by Personnel Error. Sp S12M-54-E32-XXF4 Was Completed.With
ML20206R2571998-11-17017 November 1998 PBAPS Graded Exercise Scenario Manual (Sections 1.0 - 5.0) Emergency Preparedness 981117 Scenario P84 ML20198C6751998-11-0505 November 1998 Rev 3 to COLR for PBAPS Unit 3,Reload 11,Cycle 12 ML20195E5341998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pbaps,Units 2 & 3. with ML20155C6071998-10-26026 October 1998 Safety Evaluation Supporting Amend 226 to License DPR-44 ML20155C1681998-10-22022 October 1998 Safety Evaluation Accepting Proposed Alternative Plan for Exam of Reactor Pressure Vessel Shell Longitudinal Welds ML20155H7721998-10-12012 October 1998 Rev 1 to COLR for Peach Bottom Atomic Power Station Unit 2, Reload 12,Cycle 13 05000277/LER-1998-006-02, :on 980915,automatic RWCU Isolation Occurred While Placing RWCU Sys in Svc.Caused by Unexpected Surge of Water.Procedure Change Was Initiated to Open MO-2-12-74 & RWCU Sys Was Successfully Returned to Svc.With1998-10-0909 October 1998
- on 980915,automatic RWCU Isolation Occurred While Placing RWCU Sys in Svc.Caused by Unexpected Surge of Water.Procedure Change Was Initiated to Open MO-2-12-74 & RWCU Sys Was Successfully Returned to Svc.With
ML20154J2401998-10-0505 October 1998 Safety Evaluation Supporting Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively ML20154H4771998-10-0505 October 1998 Safety Evaluation Supporting Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively ML20154G6821998-10-0101 October 1998 SER Related to Request for Relief 01A-VRR-1 Re Inservice Testing of Automatic Depressurization Sys Safety Relief Valves at Peach Bottom Atomic Power Station,Units 2 & 3 ML20154G6631998-10-0101 October 1998 Safety Evaluation Supporting Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively ML20154H5541998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Pbaps,Units 2 & 3. with 05000278/LER-1998-004-03, :on 980820,automatic RWCU Isolation Occurred While Placing B RWCU Sys Demineralizer in Svc.Caused by less-than-adequate Control of Equipment.Isolated B Demineralizer & Returned RWCU Sys to Svc1998-09-18018 September 1998
- on 980820,automatic RWCU Isolation Occurred While Placing B RWCU Sys Demineralizer in Svc.Caused by less-than-adequate Control of Equipment.Isolated B Demineralizer & Returned RWCU Sys to Svc
05000277/LER-1998-005-02, :on 980824,noted Failure to Meet TS Actions for Suppression chamber-to-drywell Vacuum Breaker Not Being Fully Seated.Caused by Personnel Failing to Take All TS Required Actions.Temporary Procedure Changes Were Made1998-09-18018 September 1998
- on 980824,noted Failure to Meet TS Actions for Suppression chamber-to-drywell Vacuum Breaker Not Being Fully Seated.Caused by Personnel Failing to Take All TS Required Actions.Temporary Procedure Changes Were Made
ML20153B9651998-09-14014 September 1998 Safety Evaluation Supporting Amend 9 to License DPR-12 1999-09-30
[Table view] |
Text
7,
..-.m_-
.., ~.., ~ ~.
Osritj R. Milney Vice President.
Peach Bottom Atomic Power Station
~~
PECO ENERGY-gcoglgc ***
Delta. PA 17314-9739 -
717 456 7014 April 12,1994 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 j
Docket Nos. 50-277 and 50-278 Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of March 1994 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regutatory Guide 10.1,' Revision 4.
J -
Sincerely,
/
Gerald R. Rainey Vice President 4%~(gpf
+
GRR/AJW/0HG/TJN/MSH:wjj enclosures cc:
R.A. Burricelli, Public Service Electric & Gas
~ W.P Domsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region 1. USNRC W.L Schmidt, USNRC, Senior Resident inspector H.C. Schwemm, Atlantic Electric.
C.D. Schaefer, Delmarva Power INPO Records Center '
210003 39n_MQ53._
lj$ _
_(PDFADOCK)0500277 9404200295 P40331 I
R: '
0 PDR i
m E
. - - =
..~_...-r 4
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 278 UNIT NAME PEACH BOTTOM UNIT 3 DATE APRIL 7,1994 REPORT MONTH MARCH, 1994 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATICW TELEPHONE (717) 456 7014 EXT. 4027 MEfH00 0F LICENSEE SYSTEM CCNPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1)
(H0liRS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE (1)
(2)
(3)
(4)
F FORCED REA$0N METHOD EXHIBIT G -INSTRUCTIONS
- i
$
- SCHEDULED A EQUIPMENT FAILURE (EXPLAIN) 1
- MANUAL FOR PREPARATION OF DATA B MAINTENANCE OR TEST
~
2 MANUAL SCRAM.
ENTRT SHEETS FOR LICENSEE
'I C - REFUELING 3 AUTCHATIC SCRAM.
EVENT REPORT (LER)
.]
D - REGULATORY RESTRICTION 4 OTHER (EXPLAIN)
FILE (NUREG 0161)
E OPERATOR TRAINING + LICENSE EXAMINATION F
ADMINISTRATIVE-(5)
G OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I SAME SOURCE 1
PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS
SUMMARY
MARCH 1994 OVERVIEW OF ACTIVITIES
.QOMMON PLANT The following plant maintenance outages occurred during the month of March
On March 4,1994 at 04:00 hours power was reduced to perform turbine control valve testing. The unit was returned to 100% power at 07:00 hours.
On March 13,1994 at 01:00 hours power was reduced to perform a rod pattern adjustment. The unit was returned to 100% power at 16:00 hours.
On March 25,1994 at 04:00 hours power was reduced to perform a symmetric rod pattern adjustment and calibrate the LPRM. Power was returning to 100% on March 26,1994 but at 18:00 hours power was reduced again to perform another rod pattern adjustment.
On March 27,1994 at 13:00 hours the unit reached 100% nominal power and remained at that level for the rest of March.
The following maintenance outages occurred on Unit 2:
- SBLC Pump 'B' Mill T_a Unit 3 began the month of March at a nominal 100% power and operated at that level for the rest of the month The following maintenance outages occurred on Unit 3:
Docket No. 50 277 -
Attachm:nt to Monthly Operating Report for March 1994 UNIT 2 REFUELING INFORMATION 1.
.Name of facility:
Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdown:
Reload to scheduled for September 17,1994.
3.
Scheduled date for restart following refueling:
Restart following refueling forecast for November 12,1994.
4 Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
Yes.
!! answer is yes, what, in general, will these be?
93-01 ARTS /MELLA 9342 Recirc Pump M/G Set Replacement 9312 Power Rerate 94-01 ECCS Refuel Operability Requirements 9214 - Unit 2 CAD Analyzer Upgrade 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
9341 Submitted April 1993 9312 Submitted June 1993 92-14 Scheduled May 1994 93-02 -Scheduled May 1994 94-01. Scheduled May 1994
.. :2 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A-
Docket No. 50-277 Attachment to Monthly Operating Report for March 1994 Page 2 UNIT 2 REFUELING INFORMATION (Continued) 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2164 Fuel Assemblies,58 Fuel Rods 8.
The present licer. sed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2002 without full core offload capability.
September 1998 with full core offload capability.
~I
-=
Docket No. 50-278 Anachrnent to Monthly Operating Report for March 1994 UNIT 3 REFUELING INFORMATION 1.
Name of facility:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdown:
Reload 10 scheduled for September 11,1995 3.
Scheduled date for restart following refueling Restart following refueling scheduled for November 13,1995 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
No if answer is yes, what, in general, will these be?
5.
Schet 3d date(s) for submitting proposed licensing action and, supporting information:
N/A 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods,'significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel asssmblies (a) in the core and (b) in the spent fuel storage pool:
(a)
. Core - 764 Fuel Assemblies (b)
Fuel Pool 2201 Fuel Assemblies,6 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase In licensed storage capacity that has been requested or is planned,'in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
.____.x i
a 8
AVERAGE DA!LY UNIT POWER LEVEL DOCKET NO. 50 277 UNIT PEACH BOTTOM UNIT 2 DATE APRIL 7,1994 COMPANY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINEER!NO PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT, 4027 MONTH MARCH 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE NET)
(MWE NET) 1 1062 17 1061 2
1065 18 1061 3
1065 19 1068 4
1062 20 1060 5
1061 21 1068 6
1065 22 1063 7
1065 23 1059 8.
1061 24 1063 9
1057 25 1013 10 1028 26 978 11 1053 27 1020 12 1049 28 1060
'f 13 1006 29 1068 14 1058 30 1055 15 1058 31 1058 16 1054 1
i AVERAGE DA!LY UNIT POWER LEVEL DOCKET No. 50 278 UNIT PEACH BOTTOM UNIT 3 DATE APRIL 7,1994 COMPANY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY
$1TE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 MONTH MARCH 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWE-NET)
(MWE-NET) 1 1069 17 1065 2
1068 18 1061 3
1072 19 1065 4
1064 20 1057 5
1069 21 1061 6
1065 22 1056 7
1069 23 1061 8
1069 24 1057 9
1065 25 1073 10 1013 26 1070 11 1060 27 1053 12 1065 28 1052 13 1057 29 1052 14 1065 30 1056 15 1061 31 1055 16 1056
OPERATING DATA REPORT DOCKET No. 50 277 DATE APRIL 7,1994 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY-PERFORMANCE AND RELIABILITY
$1TE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT, 4027 OPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM UNIT 2 NOTES:
- 2. REPORTING PERIOD:
MARCH, 1994
- 3. LICENSED THERMAL POWER (MWT):
3293
- 4. NAMEPLATE RATING (GROSS MVE):
1152
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1065
- 6. HAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1051
- 8. If CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 2,160 173,040
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,160.0
'108,272.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE 744.0 2,160.0 104,380.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,422,613 6,800,722 311,290,215
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 806,000 2,244,100 102,395,590
- 18. NET ELECTRICAL ENERGY GENERATED (MWh)
.....'782,974 2,179,913 98,170,715 PAGE 1 0F 2
9 OPERATING DATA REPORT (CONTINUED)
DOCKET No. 50 - 277 DATE APRIL 7,1994 THIS MONTH YR T0*DATE CUMULATIVE
- 19. UNIT SERVICI FACTOR 100.0 100.0 60.3
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 60.3
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 100.1 96.1 54.0
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.8 94.8 53.3
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 13.6
- 24. SHUTDOWNS $CHEDULED DVER NEXT 6 MONTHS (TTPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PER100, EST! MATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 COMMERCIAL OPERATION 07/05/74 t
7 6
PAGE 2 0F 2 i
)
i 1
~l
_wn_.
i.
e i
OPERATING DATA REPORT DOCKET NO. 50 278 DATE APRIL 7,1994
' COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY-SITE ENGINEERING t
PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 4027 OPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM UNIT 3 NOTES:
- 2. REPORTING PERIDO:
MARCH, 1994
- 3. LICENSED THERMAL POWER (MVT):
3293
- 4. NAMEPLATE RATING (CROSS MWE):
1152
- 5. DESIGN ELECTRICAL RATING (NET MVE):
1065
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MVE): 1035
- 8. IF CHANGES OCCUR IN CAPAC!TY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS HONTH YR TO-DATE CUMULATIVE 2,160 168,936
- 11. HOURS IN REPORTING PCR100 744
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,079.0 106,750.4 0.0 O.0 0.0
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON LINE 744.0 2,0 79.0 103,370.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,447,566-
.6,812,662 305,586,139
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 809,200 2,258,600 100,248,732
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 789,091 2,198,853:
96,172,860 PAGE 1 OF 2 t
_~
4 e-OPERATING DATA REPORT (CONTINUED)
DOCKET No. 5,0 - 278 DATE APRIL 7,1994 THIS MONTH YR*TO DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 96.3 61.2
- 20. UNIT AVAILABILITY FACTOR 100.0 96.3 61.2.
- 21. UNIT CAPACITY FACTOR (USING MOC NET) 102.5 98.4 55.0
- 22. UNIT CAPACITY FACTOR (US!kG DER NET) 99.6 95.6 53.5
- 23. UNIT FORCED OUTAGE RATE 0.0 3.8 12.2
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 11/14/95
- 26. UNITS IN TEST STATUS (PRIOR TO CCHMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERAfl0N 12/23/74 O
PAGE 2 0F 2 1
I i
l
i i
4 a
4
.)
q l
1 1
1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 277
)
UNIT NAME PEACH BOTTOM UNIT 2 DATE APRIL 7,1994 REPORT MONTH MARCH, 1994 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY
$1TE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 4027 l
NETH00 0F LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATIONjREASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE i (1);
(HOURS)l (2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 13 940304 S
3.0 B
4 N/A HA VALVEX TURBINE STOP VALVE TESTING. REACTOR NOT SHUTDOWN 14 940313 S
15.0 H
4 N/A RC CONROD R00 PATTERN ADJUSTMENT. REACTOR NOT SHUTDOWN.
15 940325 S
38.0 H
4 N/A RC CONROD SYMMETRIC ROD PATTERN ADJUSTMENT AND LPRM CALIBRATION 16 940326 7
19.0 M
4 N/A RC CONROD ROD PATTERN ADJUSTMENT REACTOR NOT SHUTDOWN T5.0 (1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G INSTRUCTIONS
$ SCHEDULED A EQUIP > ENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA 8 - MAINTEhANCE OR TEST 2
ENTRY SHEETS FOR LICENSEE C REFUELING 3.- AUTOMATIC SCRAM.
EVENT REPORT (LER) 0 - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG 0161)
E OPCRATOR TRA!NING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERR 7R (EXPLAIN)
Ha OTHER(EXPLAIN)
EXHIBIT I SAME SOURCE