Suppls 900126 Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Initial Activities Completed as of 910222 Plant Startup Following First Refueling Outage
ML20029C286
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 03/21/1991
From: Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-13, NLS-91-074, TAC-73973, NUDOCS 9103270121
Download: ML20029C286 (1)


Text

.

_ _.___..~.-._.~.._ __._ -_.___

?

i

,4 Carolina Power & Light Company t

j.

P.0 Boa 1651 e Rawgh, N C. 27602 f

SERIAL: NLS 91 074 i

Mt? 211991 i

G. E. VAUGHN vice Preeinent f

Nuclear Services Department United States Nuclear Regulatory Commission l

4 ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 1 DOCKET NO. 50 325/LICLNSE NO. DPR 71~

SUPPLEMENTAL RESPONSE TO NRC CENERIC LETTER 89 13 SERVICE WATER SYSTEM PROBLEMS AFFECTING SAFETY RELATED EQUIPMENT (NRC TAC NO. 73973)

Gentlemen:

On July 18, 1989, the NRC issued Generic Letter 8913, " Service Water System-Probletas_Affecting Safety Related Equipment."

The Genuric Letter established extensive recommended actior.s in five inajor. areas relative to inonitoring - and surveillance, testing, and design reviews of service water systetus. Further, the letter requested that initial activities defined in each major' area be coinpleted prio* to plant start up following. thei first refueling -outage beginning nino months or.more after the date of the letter and that the NRG be notified within 30 days following implementation.

Carolina Power & Light Company (CP&L) responded to Generic - Letter _ 89 13 on -

-January 26, 1990 indicating, with certain clarifications, our: intent to comply with the letter and complete the initial activities prior to start up from the next scheduled refuelin5 outage for each of the CP&L units..

The purpose of this letter is to provide' notification _that the Brunswick Steam Electric Plant, Unit No. 1 (BSEP) has.-completed,-as of the February 22 -1991 plant start up date, the initial activities and. testing and the'. establishment i

of the continuing programs to which CP&L committed, with the exception of heat transfer testing of the RHR heat exchangers. ~ One RHR heat 1 exchanger _ was cleaned :

l and inspected during the last refueling outage (refueling outage 6) and the othere

- during the current refueling outage (refueling outage 7); however, testing'is not feasible until plant shutdown _ for the next scheduled outage when requisite heat load conditions will-be available.- CP&L_w111; notify-the NRC when_that._ testing.

has been completed.-

i h

' If you have any questions-concerning this11nformation, please. contact Mr.x L. S. -

Rowell at.(919) 546 2770.

.p Yours very tr.1 C. E. Vau LSR/jbw((10290LU)-

[

cc: Mr S. D.- Ebneter :

L

-Mr. N..B.:Le Mr.-R.:L. Prevatte 9103270121 910321

_ADOCKcO500g5-N PDR_

l