Proposed Tech Specs 4.8.2.3.2.c & 4.8.2.3.2.d Allowing one- Time Extension of Surveillances for 125-volt Batteries & Chargers Until End of Reload 9 Outage Currently Scheduled for mid-Nov 1991
ML20029A563
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/19/1991
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20029A557 List:
References
NUDOCS 9102250234
Download: ML20029A563 (3)


Text

- _ _ _ _ _ - _ - - - _ - _ .

ENCLOSURE 3 BRUNSWICK STEAM ELECTRIC PIANT, UNIT 2 NRC DOCKETS 50-324 OPERATING LICENSE DPR 62 REQUEST FOR LICENSE AMENDMENT ONE-TIME EXTENSION OF 18 MONTil 13NITERY SURVEILIANCES TECilNICAL SPECIFICATION PAGES - UNIT 2 9102250234 910219 F'DR ADOCK 0500 g,4

I I. . .

'- ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.8.2.3.2 Each of the above required 125-volt batteries and chargers shall be demonstrated OPERABLE

a. At least once per 7 days by verifying thatt
1. The parameters in Table 4.8.2.3.2-1 meet the Category A limits, end
2. Total battery terminal voltage is greater than or equal to 129 volts on float charge,
b. At least once per 92 days by verifying thatt
1. The parameter in Table 4.8.2.3.2-1 meet the Category B limits
2. There is no' visible corrosion at either terrtinals or connectors, orthecognectionresistanceoftheseitemsislessthan 150 x 10~ ohms, and
3. The average elactrolyte temperature of the connected cells is above 60'F.
c. At least once per 18 months by verifying thatt
1. The cells, cell plates, and battery racks show no visual .l indication of physical damage or abnormal deterioration.
2. The cell-to-ccil and terminal connections are clean, tight, free of corrosion, and coated with anti-corrosion material, and
3. The battery charger will supply at least 250 an: peres at a minimum of 135 volts for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. l

$ Ib t' C ff- 4d ,goryg,[/kges L[,g,g,Q g g,

, M A s.a,c.g and 1.&. a.a.a.c.a q be eded U il NOVerqb fd' J

)N/

BRUNSWICK - UNIT 2 3/4 8-9 Amendment No. 117

e ELECTRICAL POWER SYST.'MS i

SURVdILLANCE REQUIREMEtTS (Continued) d.- At least one'. per 18 months, during shutdown, by verifying that:

1. The battery capacity is adequate to supply a dumy load of the fAlowing profile while maintaining the battery terminal voltage greater than or equal to 105 volts.

a) During the initial 60 seconds of the test

1) Battery 2A-1 greater than or equal to 916 amperes.
2) Battery 2A-2 greater than or equal to 916 amperes.
3) Battery 2B-1 greater than or equal to 916 amperes.
4) Battery 2B-2 greater than or equal to 916 amperes.

b) During the remainder of the first 30 minutes of the test

1) Battery 2A-1 greater than or equal to 250 amperes.
2) Battery 2A-2 greater than or equal to 250 amperes.
3) -Battery 2B-1 greater than or equal to 250 amperes.
4) Battery 2B-2 greater than or equal to 250 amperes. ,

c) During the remainder of the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> test l

1) Battery 2A-1 greater than or equal to 200 amperes.
2) Battery 2A-2 greater than or equal to 200 amperes.
3) Battery 2B-1 greater than or equal to 200 amperes.

, 4) Battery 2B-2 greater than or equal to 200 amperes.

2. At the completion of the above . tests, the battery charger shall be_ demonstrated capable of rect eging its battery at a race of at least 200 amperes while sur% ying normal D.C. Loads. The battery shall be charged to at least 95% capacity in less than or equal to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
e. At least once per 60 months during shutdown, by verifying that the battery capacity is at least 80% of tha manufacturer's rating when subjssged to a performance discharge test. This performance dischierge test may be performed in lieu of the battery service test.

m.

  • Fo<- QoIe 4 o4 surveillaxces y,g.a.a.a.s / M Y.t.a.3,a.d.. a m 9 ke>desot, urd;/ Akem% )q Ry l

. BRUNSWICK - UNIT 2 3/4 8-10 Amendment No. 117 l

.